Peak Load Requirement (MW) Energy Requirement (MU )
BESCOM Profile Bangalore Electricity Supply Company Limited (BESCOM) is Power Distribution Utility distributing electricity across 8 districts viz., Population Base : 2.07 Cr Consumer Base : 79 Lakhs Districts Peak Load Requirement (MW) Energy Requirement (MU ) Bangalore Urban 2100 41 Bangalore Rural 365 7.13 Ramanagar 100 1.95 Kolar 275 5.37 Chikkaballapura 245 4.78 Tumkur 495 9.66 Chitradurga 230 4.49 Davanagere 290 5.66
3
Demand & Supply ( )
4
Energy Consumption(2011-2013)
Average day Month
5
Energy Consumption (2011-2013)
Monthly Month For : Initially proposed by BESCOM: 32,193 MUs. Approved by KERC: 31,305 MUs. Consumption till date(17th Feb-2013) : 24,576 MUs. Balance Upto end of March-2013 : 6,729 Mus(Adequate).
6
Reasons for Shortages / Gap
1.Low Wind Energy Generation : means no ‘reserve’ available 2. Unforeseen shut downs of thermal generating units at RTPS (Raichur) : 150 MW 3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the state : 150 MW Total Shortage of Load Expected : 300 MW
7
How BESCOM will close the GAP ?
1. Strict measures to stop illegal conversion of Single Phase to 3 Phase by IP Set owners and excess consumption [Open Delta] : 210 MW 2. Vigilance Activities : 30 MW 3. Shifting of Peak Load : 60 MW ( From 6 PM to 9 PM to beyond 9 PM)
8
Open Delta System 1. Open Delta System is a scheme which avoids illegal use of power supply to IP Sets. Thus there won’t be overloads or excess drawl from the network. 2. Effective Implementation saves 210 MW
9
Open Delta Configuration
10
Vigilance Activities : 60 MW
1. Strengthening of BESCOM Vigilance network by providing 30 additional vehicles & staff . 2. Extra Vigilance during peak hours and at night : to have check on illegal welding, lights, theft etc., 3. Both Special Vigilance Team & BESCOM Officers will be on strict vigil. Expected to do : 1500 inspections / Everyday.
11
Load Shifting : 30 MW 1. BESCOM would request consumers to shift the use of major loads like Water pumps, Geysers etc., from peak to non- peak hours ( after 10 PM) 2. BESCOMs brand ambassador Sri. Upendra will promote Conservation, and load shifting activities like above
12
ON : 3 Phase Power Supply on: Single Phase Power Supply OFF : No Power Supply Batches B1, B2 & B3 will not be having same timings of power supply, the timings will be intimated by issuing pamphlets
13
Reduction in Power Outages in past 5 years
Duration in minutes 20 20 20 Year
14
In Case of any grievances ! Reach us
Online Complaint Registration: Log onto to register your complaint 24×7 SMS Facility : Just type BESCOM <Space> Sub-division code<space> nature of complaint and send it to 24×7 Helpline: Call to BESCOMs 24X7 Customer Helpline ( )-(25 lines are there)
15
Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.