1 Catania 20 Feb ’13 KM3NET Marine Operations Catania - Status
Klaus Leismüller

2 Goals and Objectives Installation of test tower (and LBL) at 3500 meters off the coast of Capo Passero

3 How do commercial Marine Operations work - Scope - Time - Money

4 Tools - MSV Nautical Tide
Multi Service Vessel 75 meters long Deck Space 252 sqm 80k hydraulic A-Frame with 4500m lift lines Deck Crane 30T,10T,5T Heavy work class ROV

5 Tools - Hammerhead II ROV
Rated for 5000 meters Deliver/recover 16,000 lb 150 hp Fully equipped, manipulators, cameras etc. 6000 m umbilical winch LARS: Moonpool

6 Timing To Malta Load tower to truck Transport to Malta Unload and Store Test To Nautical Tide Load tower to vessel Latching on board To Seafloor Pre Deployment Survey Deployment Rigging Lower Tower to Seafloor Connection/Testing Recovery (contingency plan) Release/Unfurl/Inspect from 21/ 23/

7 Risk Assessment

8 Risk Assessment

9 Next steps Finish and release Marine Operations Manual
Finish Risk Management Plan (ALARP Principle) Prepare future campaigns

10 Thank You!