Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc.
FOLLOW-UP REPORT: ALTERNATIVE APPROACHES TO MANAGING SCHOOL MITIGATION AND SUB-SLAB DIAGNOSTIC TESTING Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc. The 2017 International Radon Symposium™
2
Recap: Alternative Process
Mitigation Review (Case Study) The 2017 International Radon Symposium™
3
Recap: Alternative Process
Radon Measurement Issues Would you want to send your children to a school that had been tested as radon safe/compliant in August? The 2017 International Radon Symposium™
4
Recap: Alternative Process ASD System Performance Deliverable:
Interim ASD System Performance Deliverable: Pressure Final Mitigation Systems Performance Deliverable: Radon The 2017 International Radon Symposium™
5
Recap: Alternative Process
The 2017 International Radon Symposium™
6
Recap: Alternative Process
Performance-Based Specification AARST/ASTM Installation Defined Scope Of Work (Owner “warranty of slab definition) Known Change Order Costs Preliminary Completion Date The 2017 International Radon Symposium™
7
Recap: Alternative Process ASD System Performance Deliverable:
Interim ASD System Performance Deliverable: Pressure Final Mitigation Systems Performance Deliverable: Radon The 2017 International Radon Symposium™
8
Recap: Alternative Process
Factors to Define Process Success Expedited Remedy Higher Confidence in Remedy Project Cost Management The 2017 International Radon Symposium™
9
Recap: Alternative Process
Results Expedited Remedy Higher Confidence in Remedy Project Cost Management The 2017 International Radon Symposium™
10
Pre-Bid Slab Diagnostics
Mitigation Review (Case Study) Pre-Bid Slab Diagnostics Radon Measurements Quote Management Documentation The 2017 International Radon Symposium™
11
Pre-Bid Slab Diagnostics
Mitigation Review (Case Study) Pre-Bid Slab Diagnostics The 2017 International Radon Symposium™
12
Mitigation Review Radon Measurements (Case Study)
The 2017 International Radon Symposium™
13
Mitigation Review Quote Management (Case Study)
The 2017 International Radon Symposium™
14
Mitigation Review Documentation (Case Study)
The 2017 International Radon Symposium™
15
Recap: Alternative Process Mitigation Review & Results
Process Review Process Results Mitigation Review & Results (Case Study) The 2017 International Radon Symposium™
16
Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc.
FOLLOW-UP REPORT: ALTERNATIVE APPROACHES TO MANAGING SCHOOL MITIGATION AND SUB-SLAB DIAGNOSTIC TESTING Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc. The 2017 International Radon Symposium™
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.