1
Georgi Minchev Georgiev EN-EL-FC
EL-FC LIU ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS 08/11/2017
2
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
Outline Activities for LIU during YETS17-18 Status of the LIU requests Budget Deadlines EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
3
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
LEIR & LINACs EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
4
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
Activities during YETS17-18 Cables installation during YETS17-18 - LEIR- BE-BI, PLAN1119, injection pick ups, 18 cables; - 4 cables pulled during TS2; - this is an additional request with the same PLAN No. LINAC4 connection - Modification of the existing signal cable tray BI, LBE, LBS EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
5
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
Status of the LIU requests Requests status LINAC4 connection: - Received request: - TE-MPE, PLAN10819, DIC 138 cables, DIR 2 racks; - TE-VSC, PLAN10675, DIC 63 cables; - BLMs and one BCT for the transfer line. - Missing pre-requests: - De-cabling from the end of Linac2 RF cavities to BHZ20; - Others? - EL-FC preparation: - Modification of the existing signal cable trays; - Modification of the existing DC cables; BC TE-MPE Budgeted with LIU PSB Budget envelope of KCHF Back-up slides Budget (detailed budget given in the back up slides) 13.5 KCHF missing 160.5 KCHF FC + 30 KCHF ENP split at the next baselining EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
6
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
PS BOOSTER EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
7
Activities during YETS17-18 PSB
LIU signal cables installation: PLAN Description of task Responsible Group DIC N0 cables to be pulled DIC L [m] 10675 Vacuum equipment J. De La Gama TE-VSC Received 33 513 Transverse damper kickers & pickup A. Blas BE-RF 48 1620 10488 BLMs C. Zamantzas BE-BI 56 6700 10290 BI.SMV: 3 transformers S. Pittet TE-EPC 4 60 10297 BI.BSW power 20 345 10071 Matching monitor F. Roncarolo 132 3300 11095 Beam Interlock System C. Martin, S. Gabourin TE-MPE 14 772 Total 307 13421 LIU DC cables installation: Description of task Responsible Group DIC N0 cables to be pulled DIC L [m] Q-strip converters test cable G. Georgiev EN-EL N/A 1 30 BI.BSW power DC cables 28 550 Total 29 580 Mechanical works: Cable trays (alcove for BI.BSW); 2 racks (Beam Interlock System). EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017
8
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
Activities during YETS /3 POPS-B cabling PROJET PLAN ZONE NBRE CABLE QTE CABLE (m) LOCALISATION ACTIVITE TRAVAUX GROUPE DEMANDEUR LIU-POPSB 10311 BOOSTER 2 300 BAT CABLAGE WIC POPS-B TE-MPE MOMPO 10311 1 360 BAT CTRL DUMMY LOAD TE-EPC SKAWINSKI 250 BAT RECONNECTING SWITCH 3 700 BAT DETECTION INCENDIE BE-ICS AVERNA 8 720 SYSTEME D’ACCES GS-ASE JUGET 100 BAT 245 MTG BE-CO NINET 5 1750 BAT 245 – BAT 367 DC DUMMY LOAD GAILLARD 1120 BAT 245 – BAT 360 DC VERS BOOSTER - 30 cables / 5.3 km After YETS17-18 (march 2018) PROJET PLAN ZONE NBRE CABLE QTE CABLE (m) LOCALISATION ACTIVITE TRAVAUX GROUPE DEMANDEUR LIU-POPSB 10311 BOOSTER 6 180 BAT 245 CABLAGE ETHERNET TE-EPC GOMEZ COSTA 10311 216 3106 DC GAILLARD - 222 cables / 3.3 km Budget code 99238 EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
9
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
Budget Last update 18/10/2017 Signal cabling DC cabling EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017
10
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
PS EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
11
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
Activities during YETS /2 De-cabling CR PS (FYI – non LIU activity) Work in 2 shifts; Lockout from 21/12/217 to 15/02/2017; (29 working days) If we do not finished the work in YETS17-18, it will cost 3 or more weeks of LS2! EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017
12
Activities during YETS17-18 2/2
LIU cabling Missing final request – too late Deadline LIU requests YETS end of April 2017 Deadline other requests YETS17-18 – 15/09/2017 Ready for execution*: (*except PLAN 10967) PROJET PLAN ZONE NBRE CABLE QTE CABLE (m) LOCALISATION ACTIVITE TRAVAUX GROUPE DEMANDEUR LIU-PS* 10967 PS 30 930 BAT 353 – BAT 359 CABLAGE CABLAGE RF SOURCES BE-RF DAMERAU LIU-PS 15 300 BAT 355 RF 25KV (CABLAGE BAT 355) TE-EPC DE MALLAC 1 40 ETHERNET POUR RF25KV GOMEZ COSTA 10362 5 900 BAT PS CABLAGE RF 25KV (LIU) -56 cables / 2.2 km 4 cables CC , 1km - late request critical for PS performance in 2018. (Possible if lockout from 21/12/217 to 15/02/2017) - Postponed to LS2 due to the user - electronics not ready: PROJET PLAN ZONE NBRE CABLE QTE CABLE (m) LOCALISATION ACTIVITE TRAVAUX GROUPE DEMANDEUR LIU-PS 10921 PS 30 1700 350 CABLAGE PS LONGITUDINAL DAMPER BE/RF Haase EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017
13
Requests status LS2 – PS 1/2
Reminder: all definitive requests (DIF, DIC, DIR, DEC) for LS2 shall be submitted before 21/12/2017. Final requests (DIC, DIF, DIR) for 21/12/2017 PLAN LIU TICKET AREA BUILD DESCRIPTION GROUP CONTACT NBRE CABLES QTY CABLE (Km) 10349 LIU-PS PS 350 CABLAGE DC PI.SMH42 TE/EPC Jean-Marc Cravero 1 0.2 10350 CABLAGE DC PI.BSM42 0.15 10351 CABLAGE DC BSM 4 0.5 10352 CABLAGE DC LOW BETA QUADRUPOLE 10437 BEAM WIRE SCANNERS BE/BI Jonathan Emery 45 9.2 10752 DECABL. ET RECABLAGE KFA45 TE/ABT Thomas Kramer 94 24 10920 CABLAGE RF-HP BE/RF Carlo Rossi 44 22 10924 PS 80MHZ FAST TUNER 6 11110 CABLAGE DC IPM VERTICAL Serge Pittet 2 0.4 11155 PS40/80MHZ NEW FEEDBACK AMP 35 0.6 11427 HV CABLE FOR KFA45 12 1.5 10025 RQF PS INTERNAL DUMP EN/STI Jerome Lendaro 16 1.8 PS Ring 397 câbles 71km EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
14
Requests status LS2 – PS 2/2
PLAN LIU TICKET AREA BUILD DESCRIPTION GROUP CONTACT NBRE CABLES QTY CABLE (Km) 10967 LIU-PS PS 353 NEW DIGITAL BEAM CONTROL BE/RF Heiko Damerau 256 9.1 11110 355 ETHERNET IPM VERTICAL TE/EPC Jose Luis Gomez Costa 2 0.2 10349 359 ETHERNET PI.SMH42 365 ETHERNET BAT365 9 0.4 10437 RQF 368 CABLAGE VIDE POUR BSW TE/VSC Jose De La Gama Serrano 10 1.2 Bâtiments de surface 279 câbles 11.1 km PLAN LIU TICKET AREA BUILD DESCRIPTION GROUP CONTACT NBRE CABLES QTY CABLE (Km) 10329 LIU-PS TT2 269 ETHERNET BATIMENT Y TE/EPC Jose Luis Gomez Costa 42 3 RENOVATION CABLAGE DC Konstantinos Papastergiou 100 8.3 10811 CABLAGE WIC TT2/NTOF TE/MPE Richard Mompo 121 20 Bat 269 et TT2 386 câbles 52 km Total: 1062 cables / 136 km EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
15
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
Budget Budget envelopes estimation YETS17-18 TID to the respective budget code – action LIU Budget envelopes estimation LS2 Budget envelopes estimation will be provided by EN-EL after YETS17-18 based on the final requests – action EL EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017
16
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
SPS EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
17
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
SBDS5 SPS-P5 - YETS17-18 cabling Installation of 120m Kicker cable ladders; Pulling of 15 cables, 1.5 km, for MKDVB51735. Central cable trays modification EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
18
SBDS5 SPS-P5 – LS2 requests status 1/2
BA1 Equipment Action Group preDIC DIC preDEC DEC preDIR DIR preDIF DIF Contact Comments MKDVA.11731 REMOVE TE-ABT LSS1 BA1 MKDVB.11736 MKDHA.11751 MKDHA.11754 MKDHB.51757 TIDH.51874 EN-STI TIDV.G.11892 TFDH (BSG) BE-BI TFDV (BSG) MDV.11707 RELOCATE TE-EPC Old position MDV.11705 TE-MPE MDH.11807 Old position MDHD.11832 BPV.11708 Old position BPV.11706 BPH.11808 Old position BPCE.11833 Vacuum MODIFY TE-VSC chiara.pasquino Including eCloud test bench relocation in LSS1 Beam losses monitor 5 cables done during EYETS MDHW.11733 INSTALL ECR ongoing MDHW.11736 MDHW.11738 MDHW.11754 MDPH.11757 MDPH.11758 EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
19
SBDS5 SPS-P5 – LS2 requests status 1/2
BA5 Equipment Action Group preDIC DIC preDEC DEC preDIR DIR preDIF DIF Contact Comments MKDVB.51697 INSTALL TE-ABT ECA5 MKDVA.51730 MKDVB.51735 MKDHA.51740 MKDHA.51753 MKDHB.51756 TIDV.51874 EN-STI BB5 BTV.51858 BE-BI Vacuum MODIFY TE-VSC Cooling & ventillation EN-CV DIC received only for Cooling Beam losses monitor MDHW.51633 REMOVE TE-MSC TE-MPE MDVW.51732 MDVB.51777 MDPH.51753 MDPH.51754 MDHW.51832 MDHW.51836 MDHW.51838 MDHW.51853 BBLR.51760 BBLR.51771 BBLRM.51772 BBLRM.51774 BRCV.51899 BRCH.51902 BSHV.51659 jerome MDVW.51934 RELOCATE TE-EPC Old position MDVW.51734 MDVW.51935 Old position MDVW.51736 MDH.51934 Old position MDH.51807 MDV.51930 Old position MDV.51907 BIPMV.51934 Old position BIPMV.51734 BWSD.51957 Old position BWSD.51731 BWSRE.51958 Old position BWSRE.51740 BPCE.51832 Old position BPH.51808 BCTFS.51955 Old position BCTFS.51894 BCTDC.51951 Old position BCTDC.51895 BCTDC.51952 Old position BCTDC.51897 BPMBV.51907 Old position BPMBV.51905 BPV.51930 Old position BPV.51908 COLLIMATOR.51658 Old position TCRMP Collimator test bench TCSM.51938 Old position TCSM.51934 TXRPH.51956 Old position XRPH.51937 EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
20
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
SBDS5 SPS-P5 - Budget Kicker cable ladders, 15 kicker cables and central cable trays modification YETS OSVC sent, BC Modification of the cable trays in the tunnel eye - Budget code 54223: Budget envelopes estimation for LS2: They will be provided by EN-EL after YETS17-18 based on the final requests – action EL (TID to budget code 54223, SBDS cabling – action LIU) EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
21
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
SPS RF upgrade - Run 2017: 500 cables, 9 km installed; - No works possible during YETS17-18. Missing pre-requests: - DIC 110 cables BE-RF, E. Montesinos (~50 during RUN2018); - DEC BE-RF Faraday cage, Ph. Baudrenghien; - DEC BE-BI, Christian Boccard; - DEC TE-VSC, C. Pasquino. EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
22
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
TI2 & TI8 No works possible during YETS17-18; Missing pre-requests: (EDMS ) - TI2 & TI8: DIC BE-BI (BLMs); - Final decision for power converter (DC cables) Pending confirmation TE-EPC; - TI8: DIC WIC, TE-MPE, R. Mompo: Pending confirmation TE-EPC (2 cables SR8, 2 cables SR2). Budget (EN-STI): - Modification of cable trays RH KCHF; - DC cabling 325 KCHF (Estimated in 2015). EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
23
Optical fibres Activities during YETS17-18 Activities during LS2
Projet Description Période Responsable Groupe Travaux à réaliser Nb de câble LIU Bâtiment 245 IT YETS17-18 Mohssen Souayah IT-CS 4 liaisons 2SM+1spare 1 Bâtiment 245 TE-EPC Jose Luis Gomez Costa TE-EPC Liaison 245-R Bâtiment 245 RF Maria Elena Angoletta BE-RF Liaisons 245-S-403(RYAAU05 et RYAAU07)-361-1(BOR708) 2 Bâtiment 245 Trigger Oasis Benjamin Ninet BE-CO Liaison Trigger OASIS B-Train PSB Bâtiment 245 MTG Timing Liaison Btrain Distribution Marco Buzio TE-MSC Liaison (BCER373) (BOR708), 3 PS-BGIV James Storey BE-BI PS.BGIV PR.BGI84 Liaison 355-SS84 12SM Résistant radiations MOPOS 1- Andrea Boccardi 18 BA3 Faraday Cage – B30 Activities during LS2 Projet Description Période Responsable Groupe Travaux à réaliser Nb de câble LIU Bâtiment 245 TE-EPC LS2 Jose Luis Gomez Costa TE-EPC Liaisons 245(RYZCU01)-245(FGC) 3 Btrain Distribution Marco Buzio TE-MSC Liaison (BOR708), 2 Liaison Roger Andrew Barlow TE-ABT 6 liaisons 4 fibres PSB BCER BI.DIS 6 Jonathan Emery BE-BI Beam Wire Scanner Liaison 24SM 361-PSBRING 4L1 Beam Wire Scanner Liaison 24SM 361-PSBRING 11L1 Beam Wire Scanner 5 liaisons 8SM 368-PR.BWSH54, V64, H65, H68, V85 10 Beam control upgrade Bldg353, Plan:10967 Heiko Damerau BE-RF PSR LIU - PLAN ID Liaisons [13 câbles 2 à 8 SM] 13 PSR LIU - PLAN ID Liaisons [3 câbles 5 à 21 SM] PSR LIU - PLAN ID Liaisons [9 câbles 10 SM] 9 MOPOS 2+/- Andrea Boccardi 36 MOPOS 3+/- MOPOS 4+ 18 SBDS5 fibers Pieter Van Trappen Liaison BA5-ECA5(RA36) 1 Liaison CCR-ECA5(RA39) Liaisons ECA5(RA14)-ECA5(RA01,RA05,RA08,RA12,RA15,RA19) Missing requests for LS2 En attente d'information LIU PS 80 MHZ Fast Tuner LS2 Christine Vollinger BE-RF En attente de DIF (Plan 10924) ? Liaisons BAF3? ?? E. Montesinos En attente de DIF EDMS Georgi Minchev Georgiev EN-EL-FC 08/11/2017 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting
24
EDMS 1776389 Georgi Minchev Georgiev EN-EL-FC
Deadlines Today we are here All definitive requests (DIF, DIC, DIR, DEC) for LS2 shall be submitted before 21/12/2017. All pre requests (DIF, DIC, DIR, DEC) for LS2 shall be submitted before 31/05/2017. All final requests for YETS shall be submitted before end of April 2017. 12/04/2017 EDMS Georgi Minchev Georgiev EN-EL-FC
25
Thank you!
26
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
BACK-UP SLIDES 08/11/2017 EDMS Georgi Minchev Georgiev EN-EL-FC
27
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
LINAC4 CONNECTION BUDGET Item Price [KCHF] Remarks DC cables modification for the new power converters 15.5 New DC cables - LT.BHZ20, LT.BHZ30, LT.BHZ40 & LTB.BHZ40 24 Signal cable trays modification 22 New cable trays 10 Does not include civil engeenering works De-cabling from Li2 cavities to BHZ20 38 The estimation is based on an assumption. No DECs received Work Supervision BLMs and one BCT for the transfer line 41 Originally is been part of Linac4 project TOTAL: 160.5 08/11/2017 EDMS Georgi Minchev Georgiev EN-EL-FC
28
EDMS 1865198 Georgi Minchev Georgiev EN-EL-FC
PSB LIU LS2 N0 cables L [m] De-cabling for LIU 1612 139170 New signal cabling for LIU 3438 174110 08/11/2017 EDMS Georgi Minchev Georgiev EN-EL-FC