Download presentation
Presentation is loading. Please wait.
1
Prince George Transit : Fall 2017 Expansion
February 2017
2
Background Background 2,500 hours expansion funding
Transit Future Plan recommendations Statutory holiday service Service improvements on weekends Public outreach Survey and Talktober open houses Analysis Route performance and ridership The Transit Future Plan sets a transit mode share target of four percent for all trips in 25 years. Modal share is a transportation term that describes the percentage of travelers using a particular method of transportation such as walking, cycling, transit or automobile. Background
3
Public outreach Who rides this service? Which routes do they use?
25% UNBC students 4% seniors Which routes do they use? Rt 88/89 & 15 How often do they ride? 2 to 3 times a day Public outreach
4
Public outreach (dis)Satisfaction with transit service
Dissatisfaction with shelter unavailability (in)Convenience of transit service Inconvenient travel times Public outreach
5
Network challenges Challenges Route 1/11 schedule in consistency
Route 46/47 circuitous Route duplication along Massey Dr. Route 17/18 low usage routes Route 88 routing Route 16 weekend routing New growth area Challenges
6
Route performance Analysis
Route 15 highest boardings, 12 boardings per trip, carries close to 60 people per hour Route 5 fourth highest boardings, no Sunday service Route 18 lowest ridership route Route 17, 46/47 low ridership routes Annual boardings Analysis
7
Recommendations Recommendations
Add service on remaining statutory holidays Improve span of service on Sundays Improve frequency of service on Saturday on FTN routes Minor route changes to improve efficiency, provide schedule consistency and decrease travel time on some routes The first steps should be to identify transit facility functional requirements and identify and evaluate potential facility site options. Recommendations
8
Statutory Holidays Recommendations Fiscal Year 2016/2017
Labour Day Thanksgiving Day Remembrance Day Boxing Day Family Day Good Friday Victoria Day Canada Day BC Day Labour Day Sept. 5th 2017 Partial Implementation of statutory holidays Sept 5 - service expansion implementation, increased Sunday and statutory holiday span Recommendations
9
Route span Recommendations
10
Communication Materials
Next Steps Council Report Refining Schedules Communication Materials Spreading word Implementation February to June 2017 May to August 2017 August 2017 September 2017 Questions??? Next steps
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.