Download presentation
Presentation is loading. Please wait.
Published byLucinda Perry Modified over 6 years ago
1
Current status of the existing interconnections between France and Spain ERGEG – 2nd implementation meeting group of the South GRI ERGEG, 11 Décembre 2006
2
The TIGF infrastuctures current situation
IP with GRT Gaz IP with NATURGAS IP with ENAGAS DORDOGNE IP with TEPF HERAULT LACQ BIRIATOU LARRAU - ERGEG, 11 Décembre 2006
3
LARRAU interconnection Point > North to South Flow
DORDOGNE Mont’s compression station 3 Units of 3,5 MW each HERAULT BIRIATOU Conditions at Larrau IP: Pressure : 61 bar(a) – Nm3/h ΔP : +0,048 bar(a) / 1000 Nm3/h ALCAY Flow direction LARRAU As is Larrau IP situation : Capacity : 81,5 GWh/j Larrau pressure : 62,5 bar(a) Mont pressure : 78 bar(a) Mont required power : 7 MW To increase capacities Decrease the IP Pressure - ERGEG, 11 Décembre 2006
4
LARRAU interconnection Point > South to North Flow
DORDOGNE HERAULT BIRIATOU ALCAY Flow direction LARRAU As is Larrau IP situation : Non bidirectional (only North to south) Firmed capacities = 0 To create capacities => Invest in a reversibility equipments at Mont and Alçay sites - ERGEG, 11 Décembre 2006
5
BIRIATOU interconnection Point > North to South Flow
DORDOGNE Conditions at Biriatou IP: Winter Pressure : 20 bar(a) Summer pressure : 35 to 40 bar(a) HERAULT BIRIATOU Flow direction LARRAU As is Biriatou IP situation : Winter capacities : 0 Summer capacities : from 2 to 10 GWh/j => “Lacq - Arcangues” pipeline congested To increase capacities Increase IP pressure => Invest in a new « Coudures – Arcangues » pipeline - ERGEG, 11 Décembre 2006
6
BIRIATOU interconnection Point > South to North Flow
DORDOGNE Lussagnet Pressure constraint : 50 bar(a) Conditions at Biriatou IP: Winter pressure : from 29 to 33 bar(a) Summer pressure : 36 bar(a) HERAULT Lacq Pressure constraint : 50 bar(a) Bergara warranty pressure : 40 bar(a) Flow direction BIRIATOU LARRAU As is Biriatou IP situation : Winter capacities : 5 GWh/j Summer capacities : 3 GWh/j To increase capacities Increase the IP pressure - ERGEG, 11 Décembre 2006
7
Commercial status report at IPs
From January 2006 till now From July 2006 till now - ERGEG, 11 Décembre 2006
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.