Presentation is loading. Please wait.

Presentation is loading. Please wait.

IRRAD Facility Infrastructure Upgrade

Similar presentations


Presentation on theme: "IRRAD Facility Infrastructure Upgrade"— Presentation transcript:

1 IRRAD Facility Infrastructure Upgrade
Blerina Gkotse, Maurice Glaser, Georgi Gorine, Isidre Mateu, Emanuele Matli, Giuseppe Pezzullo, Federico Ravotti CERN EP-DT, BE-OP Hello everybody my name is Blerina Gkotse and I’m going to present you the IRRAD Facility Infrastructure Upgrade. AIDA-2020 WP15

2 Outline CERN Milestones & Deliverables
CERN Proton irradiation Facility (IRRAD) Samples manager Samples manager progress Samples manager planning Mini-BPM & single-pad BPM detectors Beam Profile Monitors (BPM) Control systems Samples Manager Dataflow Irradiation facilities database Conclusion So here you have the outline and let’s start will the the CERN Milestones and Deliverables 26/01/2017 AIDA-2020 WP15

3 CERN Milestones & Deliverables
D15.6: CERN Proton Facility Upgrade (all items operational) MS16: specification for management system and online DB ready & documented M24 M12 CERN Proton Facility (IRRAD) Online database on EU irradiation facilities of interest for HEP Improve IRRAD infrastr. / user friendliness equip area to store/handle activated materials sample and user management software system upgrade contactless fluence monitoring -Vilnius University high-granularity & fast Beam Profile Monitor test sample holders for extremely-high fluence thermal box to -40ºC for CERN & Birmingham -University of Sheffield CERN Gamma Irradiation Facility (GIF++) Extension / upgrade of GIF++ Gas system New online dose-rate monitor (INRNE) Extension of the cosmic ray tracker on the side walls (INFN) Demonstrator for an augmented reality event display (INFN) Focus of this presentation See the talk of Prof. Juozas Vaitkus D15.7: Radiation Hard Facility Instrumentation ready & installed M44 See the talk of Michalis Benakis Here you see all the CERN Milestones and Deliverables but in this talk I will focus mainly to the D15.6 which is more specifically for the samples and user management system as well as the irradiation facilities database. See the talk of Roberto Guida 26/01/2017 AIDA-2020 WP15

4 Outline CERN Milestones & Deliverables
CERN Proton irradiation Facility (IRRAD) Samples manager Samples manager progress Samples manager planning Mini-BPM & single-pad BPM detectors Beam Profile Monitors (BPM) Control systems Samples Manager Dataflow Irradiation facilities database Conclusion 26/01/2017 AIDA-2020 WP15

5 CERN Proton irradiation Facility (IRRAD)
Testing components of the HEP experiments Fluence of 1×1016 p/cm2 in 14 days Beam of 24 GeV/c and size of 12×12 mm2 Scanning also in dimensions of 10×10cm2 Spills of 400msec every ~10sec Low temperature irradiation (-25°C) Shuttle System Access Chicane Beam Profile Monitor IRRAD Tables BEAM Detectors Electronics Calorimeter samples Cryostat with LHe 1.9K 30m ps-irrad.web.cern.ch 26/01/2017 AIDA-2020 WP15 5 5

6 Proton IRRADiation Facility in 2016
Radiation damage studies Test of prototypes & final assemblies before installation Test and calibration of components Registered Experiments (web) 52 49 executed (94%) Number of users / user teams 28 ~70% LHC experiments Number of samples / irradiated objects 416 246 “SET” numbers Samples size (MIN/MAX) 2mm × 2mm 250cm × 13cm × 4cm MAX target proton fluence per experiment 1×1017 p/cm2 (5×5mm2 FWHM) ~27MGy in silicon Delivered proton (typical MIN/MAX) ~2×1011 p/cm (1 spill) ~4.2×1016 p/cm2 (5×5mm2 FWHM) ~1.6×1016 p/cm2 (20×20mm2 FWHM) Irradiation time (typical MIN/MAX) 400 ms ~60 days ~76 days Here we have some statistics as you can see last year in IRRAD we irradiatied 416 samples and this number is expected to grow bigger and bigger each year. 26/01/2017 AIDA-2020 WP15

7 Outline CERN Milestones & Deliverables
CERN Proton irradiation Facility (IRRAD) Samples manager Samples manager progress Samples manager planning Mini-BPM & single-pad BPM detectors Beam Profile Monitors (BPM) Control systems Samples Manager Dataflow Irradiation facilities database Conclusion That is why we need the samples manager that I will describe now 26/01/2017 AIDA-2020 WP15

8 Samples Manager Old system New system BEAM PROFILE MONITOR DATA
IRRADIATION SYSTEMS CONTROL SAMPLES DATABASE BEAM PROFILE MONITOR DATA ENVIRONMENTAL CONDITIONS SPECTROMETRY RADIOACTIVE EQUIPMENT DATABASE Here you have the old but still in use interface. However for the reason that I previously mentioned we are planning to build a new system that will integrate all the irrad components data. For these components I’m going to speak in a while. 26/01/2017 AIDA-2020 WP15

9 Samples Manager Progress
Current state of the art Irradiation facilities technology research Contacting facility owners Specifications defined User communities Features Use cases (cds.cern.ch/record/ /files/AIDA-2020-MS16.pdf) First design approach Samples manager use case model But first let’s the progress on this project. We started by the knowledge we had from the irradiations of the IRRAD facility and then we also explored the technologies and the software used in other facilities to manipulate the data. With this knowledge be formed the user communities, the features and the use cases of the IRRAD facility. All these are described in this AIDA-2020-MS16 report. Here you can see some use case and sequence diagrams used there. Samples irradiation procedure sequence diagram 26/01/2017 AIDA-2020 WP15

10 Samples Manager Planning
Completion of the design System development System validation D15.6 01/02/2016 01/05/2016 01/09/2016 01/12/2016 01/03/2017 01/07/2017 01/07/2017 26/01/2017 AIDA-2020 WP15

11 Samples Manager BEAM PROFILE MONITOR DATA SAMPLES MANAGER
IRRADIATION SYSTEMS CONTROL SAMPLES DATABASE BEAM PROFILE MONITOR DATA ENVIRONMENTAL CONDITIONS SPECTROMETRY RADIOACTIVE EQUIPMENT DATABASE 26/01/2017 AIDA-2020 WP15

12 BPM Detectors and DAQ Unit
Fixed BPM For the beam alignment Mini and single-pad BPMs IRRAD tables alignment purpose and “in-beam” detection p+ D15.7: Radiation Hard Facility Instrumentation ready & installed M44 Fixed-BPM2 Transversal beam profile Fixed-BPM detector e- p+ p+ BPM DAQ unit 25-35m away from fixed-BPM device. 26/01/2017 AIDA-2020 WP15 12

13 Beam Profile Monitors (BPMs)
fixed-BPM Gaussian fit Measured profile Reference profile BPM DISPLAY AT CCC Longitudinal profile provided by central pad charge Transversal profile Beam monitoring at CERN Control Center (CCC) mini BPM Gaussian fit 26/01/2017 AIDA-2020 WP15 13

14 Upgrade: New 3D Fitting Tool Validation
Better accuracy required by: CERN Control Center (CCC) IRRAD team IRRAD users Developed within AIDA-2020, D15.7 All BPM channel values included Initial values for the algorithm: the maximum value and its XY position SciPy function for least square minimization Validated over hundreds of spills against other fitting methods 26/01/2017 AIDA-2020 WP15

15 Shuttle-IRRAD1 Description
System to place samples in beam without accessing the area. No need to stop the beam Manual control Software control Dose rate monitoring Safe handling of samples as priority 26/01/2017 AIDA-2020 WP15

16 Shuttle-IRRAD1 Control Interfaces
Remote control of the shuttle via Ethernet Two interfaces: Administrators-full control Users-simplified version Y- Axis positions: Reference, Load, Park and Beam X-Axis positions: Reference, Park, Pre-Beam and Beam Counting beam intensity while shuttle in beam Software interlock when samples radioactivity is too high Administrator interface User interface 26/01/2017 AIDA-2020 WP15

17 DAQ and Shuttle Monitoring
Calibration factors Shuttle positions monitoring (both axis) Dose rate monitoring (samples radioactivity) Calculation of the proper timing to place the samples in beam (for short time irradiations) 26/01/2017 AIDA-2020 WP15

18 IRRAD Tables Control XY and theta axis movement Positions definition
Speed definition Motors calibration Storage of calibration and system configuration parameters Positions history BEAM y θ x 26/01/2017 AIDA-2020 WP15

19 Samples Manager Dataflow
Beam Profile Monitor IRRAD System controls Beam longitudinal profile Temperatures Beam transversal profile IRRAD tables positions Shuttle positions Beam intensities Dose rate SEC ORACLE DATABASE 26/01/2017 AIDA-2020 WP15

20 Outline CERN Milestones & Deliverables
CERN Proton irradiation Facility (IRRAD) Samples manager Samples manager progress Samples manager planning Mini-BPM & single-pad BPM detectors Beam Profile Monitors (BPM) Control systems Samples Manager Dataflow Irradiation facilities database Conclusion 26/01/2017 AIDA-2020 WP15

21 Irradiation Facilities Database
Facilities worldwide Unified entry point for irradiation facilities at CERN and worldwide Essential (but exhaustive) collection of information 165 entries so far Validation of the data in progress Homepage CERN Facilities irradiation-facilities.web.cern.ch 26/01/2017 AIDA-2020 WP15

22 Irradiation Facilities Database Features
Possibility to create and edit new facilities by the facility owners Search filters by country, source or radiation field Irradiation facilities worldwide map Auto-maintenance (regular reminders) Open-access data but secured with the CERN authentication system (SSO) 26/01/2017 AIDA-2020 WP15

23 Conclusion Samples manager is on track
The development of the core software has started and expected to be finished by M24 Irradiation facilities database completed ahead of schedule and data are being validated Once D15.6 completed, the CERN team will further progress on D15.7 Contact: 26/01/2017 AIDA-2020 WP15

24 D ON THANK YOU! IRRADIATON FACILITIES


Download ppt "IRRAD Facility Infrastructure Upgrade"

Similar presentations


Ads by Google