National RIS related Activities Germany
2
National Status Report Germany
VTS Center Gösselthal Lock Management – Pilot Project Danube Bridge „Vertical clearance indicator“ – Warning System ENC Production Paper navigational chart RIS-Index Thomas Wagner
3
VTS-Center ~ 710 km 51 Locks connected Gösselthalmühle 10.11.2011
Thomas Wagner
4
VTS-Center Responsible Area - Main/Main-Danube-Canal/Danube
Shift System 24/7/365 24h Reachability Tasks (besides water resouorce management for Main-Danube-Canal) Emission of Reports Central Emergency Report Central Point of Contact Operational since July 2012 All 51 Locks will be connected until early 2014 Thomas Wagner
5
Lock Management – Pilot Project Danube
760 km waterway 56 Locks 29 Mio t transported goods / a Thomas Wagner
6
Lock Management Questions Goals
How can the operation of a single lock be optimized in terms of chamber occupancy, waiting time of vessels (Lock Kachlet)? In a further step, the consideration of the optimization are extended to a chain of locks (5 remaining Danube locks). Goals Support the lock operator during the planning process Optimization of waiting times at locks Electronic Traffic Journal (based on AIS) Implementation until end 2013 for Danube Evaluation early 2014 and decision for operation on other waterways Thomas Wagner
7
Vertical clearance indicator – Warning System
Thomas Wagner
8
Vertical clearance indicator – Warning System
Several Considerations Working Group WSD Süd / FVT Study of Practicability Measuring distance Results Study finished until 09/2013 Test of possible solutions Thomas Wagner
9
National Status Report GERMANY, charts
10
IENC-Production Main, km 0 – 180: Dezember 2012, IES 2.1
Main Danube Canal, Dezember 2012, IES 2.1, new edition planned 2013 Thomas Wagner
11
Paper navigational chart
Main (km 0 – 180), November 2010 Main (km 180 – 380), Spring 2012 Main Danube Canal, December 2011 Danube, January 2010, new edition planned 2013 Thomas Wagner
12
RIS-Index connection with „Drittsysteme“
Production of Reports for inland waterways (use of NtS-Standards „Notices to Skippers“) Unterstützung der Unfallbekämpfung (use of ERI-Standards „Electronic Ship Reporting System “) Lock Management (use of VTT-Standards „Vessel Tracking and Tracing“) Reportingsystem for inland waterway skippers (use of ERI-Standard) … DBWK2 IENC WADABA NtS ATKIS ERI RIS-Index Datenbestand DESTATIS VTT WESKA … … Thomas Wagner
13
Thanks for your kind attention