Download presentation
Presentation is loading. Please wait.
Published byToby Cook Modified over 6 years ago
1
Project: Accelerators IT Infrastructure Support and Installation
By Ruurd Kuipers and Maria Føyen Maria
2
The Cern Control Centre
Location: Prévessin, France. Built in 2008. Objective: To centralize the Accelerator controls. Shape? Structure: PS and Booster Island SPS Island LHC Island Technical infrastructure Island (Our workplace) Focus beam Maria
3
What did we do? Day 1: Introduction and carton recycling (Important!)
Day 4: Repair Enzo’s airplane engine. Day 7: Configuration of CCC servers (BIOS) Started off with no qualifications: How to install computers and adaptors How to configure servers through BIOS The basics of Accelerator System and Infrastructures Ruurd
4
What did we do? Introduced to: Optical fibre cable maintenance
The drone club Ping pong Other tasks: Install USB adaptors and operating systems, Connect and configure new CCC servers, Beat Enzo in chess!!! Maria
5
Our challenges In general: Enzo: Taught the hard way
We had little experience (Relatable?) Specifically: Identifying problems (f.ex PC installation & fixing model plane) Playing ping pong against physicists... Ruurd
6
Looking at the future of CERN
Dependent on global support, politically and economically, Important to stay ambitious, Important to stay ahead technologically, Would come back in the future! Maria
7
Advice to future HSSIP students:
Do not raise your expectations, be open minded! Learn fast! Enjoy :) Ruurd
8
References: We would like to thank: Enzo Mikael To you for listening!!
Maria og Ruurd
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.