Ideas Unlimited Adrian Allen Nick Tracy Steve Lona
2
Product Design
3
CAD Drawing
4
Modifications Changed the shield logo to meet the requirements of the licensing office. Added the TM. Made hole smaller for tighter fit. Able to achieve a quality finish in house by sanding and buffing.
5
Production Plan Resources Band saw Vertical Machining Center
Kurt Machinist Vise 1.25 inch parallels 1/32 inch end mill ½ inch end mill
6
Production Plan Cont. Sandpaper Electric Buffer 240 grit 320 grit
7
Production Plan Cont. Vertical Machining Center
15 hours Sanding, Buffing, Assembly 5 hours Total hours of production
8
Gantt Chart
9
Bill of Materials 50 Clock inserts 50 Batteries
$5.90 per piece 50 Batteries $0.55 per piece 3000 ft2 of ½ inch Acrylic $160 Sandpaper $3.96 per sheet Total price = $506.26
10
Packaging Bubble Wrap Boxes 50 feet for $14.00 90 for $19.97
Total Cost $33.97