MEDICIS Facility Isotope Separator Controls and HMI
Cédric Charrondière EN-STI-ECE
2
Cédric Charrondière EN-STI-ECE 2016-03-03
MEDICIS Kuka robot control PLC Supervision Kuka Robot Programming Front End Control & Interlocks Montrac Control Hot Cell Interfacing Slits controls Various cabling and integration work Offline Separator Control Cédric Charrondière EN-STI-ECE
3
Objects to communicate with
Each device can be driven by its own application (HMI) Working set WinCCOA …etc... Power supply Vacuum Gauss meter Motors (for slits) Have one unified / single user interface Slits Faraday cup Scanner Cédric Charrondière EN-STI-ECE
4
Cédric Charrondière EN-STI-ECE 2016-03-03
Power Supply Contacts: Julien Parra-Lopez Michal Dudek Hardware TE-EPC-FPC Software TE-EPC-CCS HMI EN-STI-ECE Power converter PLC FESA ~22 devices: 9 beam line 1 converter 2 switch yard 9 targets 1 extraction Development ~ 40 days Read and Write Which parameters ? Cédric Charrondière EN-STI-ECE
5
Cédric Charrondière EN-STI-ECE 2016-03-03
Vacuum Contact: Sébastien Blanchard Jose Antonio Ferreira Somoza Hardware TE-VSC-ICM Software HMI EN-STI-ECE Sectors Collection chamber PLC CMW WinccOA ~5 Devices Development ~ 5 days Read Which parameters ? Cédric Charrondière EN-STI-ECE
6
Cédric Charrondière EN-STI-ECE 2016-03-03
Faraday CUP Contact: Gerrit Jan Focker Stephane Pedersen Hardware BE-BI Software BE-BI HMI EN-STI-ECE FESA 1 Device Development ~ 40 days Control Which parameters ? Cédric Charrondière EN-STI-ECE
7
Cédric Charrondière EN-STI-ECE 2016-03-03
Scanner Contact: Gerrit Jan Focker Stephane Pedersen Hardware BE-BI Software HMI EN-STI-ECE FESA 1 Device Development ~ 40 days Control Which parameters ? Cédric Charrondière EN-STI-ECE
8
Cédric Charrondière EN-STI-ECE 2016-03-03
Slits motors Contacts: Christophe Mitifiot Mathieu Donze Hardware EN-STI-ECE Software HMI Motors PLC FESA ? Devices Development ~ 60 days Control Which parameters ? Cédric Charrondière EN-STI-ECE
9
Cédric Charrondière EN-STI-ECE 2016-03-03
Gauss meter Contact: Marco Buzio Hardware Software HMI EN-STI-ECE GPIB ? 1 Device Development ~ 5 days Read Which parameters ? Cédric Charrondière EN-STI-ECE
10
Cédric Charrondière EN-STI-ECE 2016-03-03
communicate FESA 2 /3 GPIB RS232 …etc... Cédric Charrondière EN-STI-ECE
11
Base for the application
Isolde Offline Separator Designed in 2007 by a student in LabVIEW Maintain by myself from 2008 Driving power supplies Accessing GPIB and RS232 devices Cédric Charrondière EN-STI-ECE
12
Cédric Charrondière EN-STI-ECE 2016-03-03
Manpower estimation Equipment Number Protocol Access ~Dev. time Power Supply ~22 devices FESA Read / Write 40 days Vacuum 5 devices Read 10 days Faraday cup 1 Control Slits motors ? 60 days Scanner ? 20 days ? Gauss meter FESA / GPIB 5 days Integration User Interface 30 days Testing 15 days Commissioning 20 days Manpower 280 days Cédric Charrondière EN-STI-ECE
13
Cédric Charrondière EN-STI-ECE 2016-03-03
Manpower estimation Task Manpower (FTE) Material Budget (KCHF) Kuka robot control 0.2 5 PLC Supervision Kuka Robot Programming 10 Front End Control & Interlocks 15 Montrac Control 0.25 Hot Cell Interfacing 0.1 Slits controls 20 Various cabling and integration work Offline Separator Control 1 Total ~2 ~100 Cédric Charrondière EN-STI-ECE
14
Cédric Charrondière EN-STI-ECE 2016-03-03
Summary The first runs could be made using device specific applications. The unified HMI would be put in production as soon as the hardware is stable. Manpower: ~280 days (12 months) Manpower Budget ~ CHF Hardware Budget (PXI / PC / cards) from 1 000CHF to CHF People involved: Kevin Develle supervised by me Schedule: Kevin could start in March / April 2016 Kevin can start with Vacuum and Power Supply since it is similar to Isolde offline separator Missing I/O information for all the components Application could be ready end 2016 beginning 2017. Technology: LabVIEW and RADE Cédric Charrondière EN-STI-ECE
15
Network and operating Systems
Availability Windows or Real-Time? Network TN or GPN? Order switches? Access control room or office? Views publish data for office views? Do we need high availability? Can we rely on Windows or should we switch to Real-Time application? Do we connect on TN or GPN? Do user wants to access only from the control room? Do we need to publish data for office views? Cédric Charrondière EN-STI-ECE
16
Cédric Charrondière EN-STI-ECE 2016-03-03
Thank you Do we need high availability? Can we rely on Windows or should we switch to Real-Time application? Do we connect on TN or GPN? Do user wants to access only from the control room? Do we need to publish data for office views? Cédric Charrondière EN-STI-ECE