1 Project Location

2 Existing Conditions N Maintenance Building AEP Line
CAPACITY RESTRICTIONS Maintenance Building AEP Line REVISED AEP Easement CAPACITY RESTRICTIONS Influent Metering Station Embankment 2-54” Influent Pipelines 1-72” Influent Pipeline N Pre-Sedimentation Basins Red denotes bottlenecked structures

3 Proposed Site Improvements
4- Valve Vault Structures Influent Metering Station (Expanded/ Relocated) New Rapid Mix/ Chemical Feed Structure(s) AEP Line 3-54” Influent Pipelines 1-72” Influent Pipeline Control Metering Station REVISED AEP Easement Maintenance Building Relocated to SE of Plant Property Junction Structure (Expanded/ Relocated) N Red denotes bottlenecked structures Existing Piping and Structure Demolition