Download presentation
Presentation is loading. Please wait.
1
Production Lot Management
Production Authority Transfer to Production Lot TKxxx 30K FO Tank Lot Ticket FO Production Lot Ticket ProductionLot: LOT-yymm-xx FO Daily Priority FO Tank Lot Ticket TKxxx 30K FO Production Tank Ticket ProductionTK: TK-yymm-xxx TKxxx 30K Tank Samples FO COA FO Final Tank Sample & Inspect Checklist Shift Records FO Walk-thru Checklist FO Shift Lot Notes FO RIN Transfer FO DeltaV Checklist FO Transfer Ticket QA FO In-process Surveillance Tests FO QTA Surveillance FO Transfer Ticket 1 per Lot Ref Lot# FO Confined Space GO 1 per tank ref TK# FO Production Data Log NoGo CUSTOMER Form _14a00 Rework
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.