EYETS 2016-2017 septa status Septa activities TE/ABT Thierry Masson
28/02/2017 EYETS Septa status
3
CPS General maintenance
Exchange of water filters (PS, PSB & Leir) done SEH 3M station maintenance done Removal SMH42.3 done 8/02/2017 leak detected on SMH42.3 (removed from PS 8/2/2017) SMH42.2 (2 years run) to be refurbishment asap spare coil available (last one), ready to be chrome plated (external company) new coil has to be ordered (EN/MME) ordered SMH26 First new interlock control system installed (TE-ABT-EC) done Tests (Marco and Antoine) done Exchange of SEH23 done, under vacuum, HV connected SMB to be re-installed after MU exchange Exchange BESMH planned 6/03/2017 Installation SMH42.1 planned 14/03/2017 28/02/2017 EYETS Septa status
4
CPS General maintenance
LEIR extraction septum SMH40 Magnet removed from beam line for bake out ( ) Refurbishment septa workshop (b.867) done Silver coating of return conductor in TE/VSC lab ongoing installation in Leir planned this week Bake out septa wk.10 (PS), wk.12 (PSB), wk.11&12 (LEIR) according to TE/VSC Hardware tests (SEH & SMH) PS planned 31-03 PSB to be planned (20-04 until 07-04) 28/02/2017 EYETS Septa status
5
SPS General maintenance
MSE exchange in LSS4 ( ) MSE refurbished installed in LSS4 ( ) Vacuum leak test done Bake out (200°C) water filters (x21) done Installation of water filter in LSS2 done ZS 3M station maintenance activities done ZS Anode/Cathode movement check (pot. cleaning) done 28/02/2017 EYETS Septa status
6
SPS General maintenance
To be done LSS2 3 oil containers (HV resistor) to be replaced ongoing Water filter in LSS4 planned next week Refill demineralized water from 13th March (EN-CV) planned 13-03 Testing girders movement, flow interlocks, WinCC Need demineralized water 28/02/2017 EYETS Septa status
7
Summary EYETS progressing as planned, except:
SMH40, refurbishment of return conductors started Refurbishment of SMH42.2 started, ready by May. 28/02/2017 EYETS Septa status