Download presentation
Presentation is loading. Please wait.
Published byShon Morton Modified over 6 years ago
1
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
20 Years Back and Ahead in the Field of CNS Presented by: Dr. Jevgenijs Oborins SJSC Latvijas Gaisa Satiksme (Latvia)
2
CNS role in the ATM/ANS framework
Air Traffic Management (ATM) CNS Communication, Navigation and Surveillance Services Air Traffic Services (ATS) Air Traffic Advisory Services ASM Airspace Management ATC Air Traffic Control AIS Aeronautical Information Service ATFM Air Traffic Flow Management FIS Flight Information Service MET Meteorological Service ALR Alerting Service Air Navigation Services (ANS) ATM / ANS
3
European ATM Network (EATMN): systems
EATMN is subdivided into eight systems: 1. Systems and procedures for airspace management. 2. Systems and procedures for air traffic flow management. 3. Systems and procedures for air traffic services, in particular flight data processing systems, surveillance data processing systems and human-machine interface systems. 4. Communications systems and procedures for ground-to-ground, air-to-ground and air-to-air communications. 5. Navigation systems and procedures. 6. Surveillance systems and procedures. 7. Systems and procedures for aeronautical information services. 8. Systems and procedures for the use of meteorological information. Ref.: Regulation (EC) 552/2004 (Annex 1)
4
CNS development: conceptual view
20 years ahead Aviation System Block Upgrades Concept Single European Sky ATM Research (SESAR) Programme 2015 Deployment Development 2013 ICAO Global Operational ATM Concept Definition 2005 European Air Traffic Management Programme 1999 – 2005 ICAO CNS/ATM (FANS) Concept 20 years back European Air Traffic Control Harmonisation and Integration Programme 1990 – 1999 1983
5
CNS/ATM vision “Communications, Navigation and Surveillance
systems, employing digital technologies, including satellite systems together with various levels of automation, applied in support of a seamless global Air Traffic Management system.” More than 20 years back
6
Evolution of CNS technologies:
20 years back 2015 ABAS/ SBAS /GBAS A-SMGCS Mode S Elementary and Enhanced Surveillance, ACAS II, Multilateration system, ADS-B Area Navigation 8,33 kHz VHF channel spacing FANS 1 equipment (ADS-C and CPDLC capability) GPS Full Operational Capability 1995
7
Development of the CNS performance requirements
Development of CNS services supports Essential Operational Changes 20 years ahead Airspace concept Performance based CNS services (PBC, PBN, PBS) Required CNS performance (RCP, RNP, RSP) Performance requirements for individual systems/equipments 20 years back
8
CNS underlying technologies evolution
Electronic components technologies Signal processing technologies Networking technologies Design technologies Example: Primary Surveillance Radar
9
Current challenges for CNS systems
GNSS jamming Proliferation of jammers designed to defeat vehicle-tracking systems. Unmanned aircraft systems UAS Interferences from UAS control equipment Wind turbines Influence on CNS systems based on Doppler effect Etc.
10
CNS development baseline
Communication technologies that enable improved voice and data exchanges between service actors within the system, such as those necessary to support the SWIM functionality and CDM process. Navigation technologies that enable precision positioning, timing and guidance of the aircraft to support high performance, efficient 4D trajectory operations in all phases of flight. Surveillance technologies that enable precision monitoring of all traffic to assure safe and efficient operations, including enhanced Traffic Situational Awareness and Airborne Separation Assurance System.
11
Evolution of CNS technologies:
20 years ahead 2035 New data links Multi-constellation / multi-frequency GNSS with global SBAS coverage and GBAS Cat II and III and ground navaids as backup VoIP IP network to support Sistem Wide Information Management (SWIM) Multi - sensor surveillance 2015
12
20 Years Back and Ahead in the Field of CNS
20 years ahead Start of ... ? Start of SESAR deployment phase Start of CNS/ATM systems implementation 20 years back
13
Thank you for your attention!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.