Presentation is loading. Please wait.

Presentation is loading. Please wait.

Review for Exam 1 Case 6-1 pages

Similar presentations


Presentation on theme: "Review for Exam 1 Case 6-1 pages"— Presentation transcript:

1 Review for Exam 1 Case 6-1 pages 205-210
Send 17,000 lbs of arch supports from St. Jo to Green Bay. By rail: UFC Item Boot or shoe arch supports LCL rating 100 CL rating 70 (over 20,000 lbs) Freight Tariff Rate Bases:St. Jo to Green Bay 579 Class Rates at LCL 349 cents per cwt

2 Case 6-1 Cont’d Should we ship “wind”? at LCL 349 cents per cwt
349 cents/cwt = $3.49/cwt 17,000 lbs = 170 cwt $3.49*170 = $593.30 Should we ship “wind”? at CL 244 cents per cwt 244 cents/cwt = $2.44/cwt 20,000 lbs = 200 cwt $2.44*200 = $488

3 Case 6-1 Cont’d Interest Rate 15%/year $21,000 value LCL takes 10 days
4 days interest on $21,000 15%/365*21000 = $8.63 daily interest 4 days interest is $34.52

4 Use Truck? $0.85/mile 588 miles 2 days Cost to Green Bay = $499.80
Saves additional 4 days interest or $34.52 So the relative cost is $ which is less than CL But…?

5 From St. Louis Freight Tariff Rate Bases:St. Louis to Green Bay
458 Class Rates at LCL 307 cents per cwt 307 cents/cwt = $3.07/cwt 17,000 lbs = 170 cwt $3.07*170 = $521.90

6 Case 6-1 Cont’d Should we ship “wind”? at CL 215 cents per cwt
215 cents/cwt = $2.15/cwt 20,000 lbs = 200 cwt $2.15*200 = $430


Download ppt "Review for Exam 1 Case 6-1 pages"

Similar presentations


Ads by Google