Presentation is loading. Please wait.

Presentation is loading. Please wait.

RINGrid project use case survey

Similar presentations


Presentation on theme: "RINGrid project use case survey"— Presentation transcript:

1 RINGrid project use case survey
RISGE-RG meeting Ischia, Italy / Costas Kotsokalis, GRNET on behalf of RINGrid consortium

2 RINGrid information EU design study
What are the requirements for integrating instruments with the Grid? Use case survey Experimental activities Ended up with a model use case and (what we tried to be) OGSA-relevant recommendations 10/04/2008 INGRID'08, Ischia, Italy

3 Questionnaire Challenge: Make it domain-independent
Information solicited Correspondent details: Name, , education, discipline, level of expertise Type of instrument Summary of experiment & Duration info Exclusive access indicator Known technical limitations Steps of the experiment Goal: Come up with superset of all possible activities 10/04/2008 INGRID'08, Ischia, Italy

4 Collected use cases 10/04/2008 INGRID'08, Ischia, Italy

5 Collected use cases (2) Evaluating the effects of noise and fading over a video transmission performed on a wireless channel Measurement of ultra high energetic cosmic rays with fluorescence detector telescopes and a Cherenkov detector-based ground array Running and processing 1D NMR spectra 8 bit AD/DA Experiment (hF) Acid-Base Valuation Determination of freezing temperature for specific types of meat Wireless sensor networks in indoor environment Global network of robotic telescopes Detection experiment of the type Ic supernova 2007gr Moessbauer spectra measurement 10/04/2008 INGRID'08, Ischia, Italy

6 Use case (1) Actors Primary Secondary Scientist
On-site equipment operator (collaborator) Maintenance engineers / technicians Site security manager Input provider Instrument / infrastructure owner 10/04/2008 INGRID'08, Ischia, Italy

7 Use case (2) Scope Stakeholders
RII (instrument, network, computing, storage) Stakeholders Scientist Equipment owner (owner?) Technicians / maintenance engineers Site security manager Input provider 10/04/2008 INGRID'08, Ischia, Italy

8 Use case diagram 10/04/2008 INGRID'08, Ischia, Italy

9 Activity diagram 10/04/2008 INGRID'08, Ischia, Italy

10 Flowchart 10/04/2008 INGRID'08, Ischia, Italy

11 Recommendations (1) Network-level
QoS provisioning: VPNs, BoD, cross-domain traffic engineering Wide IPv6 use Assess access-networks transfer capability Emphasis on satelite links 10/04/2008 INGRID'08, Ischia, Italy

12 Recommendations (2) QoS provisioning on the service level
An appropriate service definition implementing instrument functional and manageability interfaces (the “BES” of instruments) Inclusion of instrument resources in information models such as GLUE Suggested topics for further investigation Relation between digital libraries and experimental data Ontologies and semantic web concepts for the description of instruments 10/04/2008 INGRID'08, Ischia, Italy

13 Questions? 10/04/2008 INGRID'08, Ischia, Italy


Download ppt "RINGrid project use case survey"

Similar presentations


Ads by Google