Presentation is loading. Please wait.

Presentation is loading. Please wait.

CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee

Similar presentations


Presentation on theme: "CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee "— Presentation transcript:

1 Chae Sub, Lee Chae-sub.lee@ties.itu.int
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee Telecommunications Technology Association

2 Contents Future plan after the FG IPTV Proposed Plan for the IPTV-GSI
CJK Views

3 1. Future Plan of FG IPTV Finalization Plan for FG IPTV (COM13-R32)
May 2007 Full Focus Group meeting to progress Output Documents and agree this work plan with the Focus Group July 2007 Full Focus Group meeting – last meeting for the acceptance of new material into Service Requirements and Architecture doc. July – Sep. Review period for Service Requirements and Architecture doc. Sep NGN-GSI reviews deliverables and transfers final comments to the Focus Group October 2007 Full Focus Group meeting; Final review and approval of Service Requirements and Architecture documents. Last meeting at which new material will be accepted for all other documents Oct – Dec Review period for remaining documents. Requirements and Architecture team to work on Gap analysis December 2007 Full Focus Group meeting; Final review and approval of all documents. Final report and documents submitted to SG13 for review and approval January 2008 SG13 reviews final report, allocates deliverables for ongoing work within SG13 and other SGs according to IPTV-JCA plan

4 1. Future Plan of FG IPTV Future Plan for FG IPTV Deliverables
FGWG Document number Title Target Q/SG [Note 1] Associated Q/SG [Note 2] Approving SG [Note 3] 1 FG IPTV-DOC-0114 IPTV services requirements Q2/13  SG11, Q9/9, Q22/16, Q9/17, Q12/17 SG13 FG IPTV-DOC-0115 IPTV architecture Q3/13  Q9/9, Q21/16, Q9/17 FG IPTV-DOC-0116 Service scenarios for IPTV Q1/13  Q9/9, Q8/13, Q2/13, Q22/16, Q12/17 FG-IPTV-DOC-0117 Gap analysis [Note 5] 2 FG IPTV-DOC-0118 Quality of experience requirements for IPTV SG12 Q2/9,Q4/13, Q24/16 [Note 6] deleted FG IPTV-DOC-0119 Traffic management mechanism for the support of IPTV services Q4/13  SG11 FG IPTV-DOC-0120 Application layer reliability error recovery mechanisms for IPTV Q23/16 SG12, Q4/13, Q14/17 SG16 [Note 6] FG IPTV-DOC-0121 Performance monitoring for IPTV Q14/9, Q4/13, Q24/16, Q14/17 [Note 6] deleted 3 FG IPTV-DOC-0122 IPTV security aspects  SG17 Q3/9, Q15/13, Q13/16, Q25/16, SG17 Note 1: This is the question / study group that will lead the ongoing work on the deliverable. Note 2: These are the questions / study groups also interested in the work. Note 3: This is the SG that will handle the approval of the recommendation(s) resulting from the FG deliverable Note 4: To be decided which SG should lead the work and handle the approval of recommendation(s) resulting from the FG deliverable. Only one SG can do this but it can be done in association with other SGs. Note 5: To be allocated. Note 6: To be confirmed

5 1. Future Plan of FG IPTV Future Plan for FG IPTV Deliverables FGWG
Document number Title Target Q/SG [Note 1] Associated Q/SG [Note 2] Approving SG [Note 3] 5 FG IPTV-DOC-0125 Aspects of IPTV end system – terminal device Q13/16  Q5/9 SG16 FG IPTV-DOC-0126 Aspects of home network supporting IPTV services Q21/16  Q10/9, Q9/17 [Note 6] deleted 6 FG IPTV-DOC-0127 Working Document: IPTV Middleware, Applications, and Content Platforms Q4/9, Q13/16 [Note 4] Q2/13 FG IPTV-DOC-0128 Working Document: Toolbox for Content Coding Q23/16 FG IPTV-DOC-0129 Working Document: IPTV Middleware FG IPTV-DOC-0130 Working Document: Service Navigation System FG IPTV-DOC-0131 Working Document: IPTV Metadata Q9/17, Q10/17 FG IPTV-DOC-0146 Working Document: IPTV Multimedia Application Platforms Q4/9, PL FG IPTV-DOC-0132 IPTV vocabulary of terms [Note 5]

6 2. Proposed Plan for the IPTV-GSI
Overall direction from SG Chairmen’s meeting September ITU-T SG Chairmen meeting agreed to adopt the arrangements that we have put in place for the NGN work and to use these for the coordination and planning of the IPTV work during 2008 Agreed to establish an IPTV GSI and set up an IPTV TSR (to be coordinated by Ghassem Koleyni). The IPTV-JCA will be expanded to include representatives from other SDOs who have been involved in the IPTV Focus Group. The roles and functions of the IPTV-JCA and the IPTV TSR will be modelled on those we have established for the NGN work. The first IPTV GSI event will be held in association with the January NGN GSI event and study group meetings in Korea. Three further IPTV GSI events are provisionally planned for 2008 in association with the Study Group 9 and Study Group 16 meetings in April, the NGN GSI event in September and the Study Group 15 meeting in December.

7 2. Proposed Plan for the IPTV-GSI
Proposed Overall Time plan for IPTV-GSI Meeting Option Date Place Coinciding with the meeting of First Confirmed January Seoul (Korea) NGN-GSI event SGs 11, 13 & 19 Second *1 30 April – 7 May Geneva SGs 9 & 16 2 22 – 29 April SG 16 3 5 - 9 May SG9 4 12-16 May Not Yet (Geneva) Third 1 – 5 September September Forth 1 – 5 December SG15

8 3. CJK Views Relationship between IPTV-GSI and NGN-GSI?
Relationship FG IPTV deliverables and NGN Recommendations and drafts? How to handle new work items on IPTV (beyond FG IPTV deliverables)? How to handle IPTV FG deliverables into Recommendation: as they are or possibly combined with other drafts? Any others?


Download ppt "CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee "

Similar presentations


Ads by Google