Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jim Munro Chairman IECEx Panel of Assessors

Similar presentations


Presentation on theme: "Jim Munro Chairman IECEx Panel of Assessors"— Presentation transcript:

1 Jim Munro Chairman IECEx Panel of Assessors
Feedback from assessments of ExCBs and ExTLs – Areas where difficulties are experienced Jim Munro Chairman IECEx Panel of Assessors

2 Scope of presentation This training session will:
Look at some common problems and how to overcome or avoid them Discuss IECEx and other documents ExCBs and ExTLs need to consider Discuss some of the approaches that can be used to help bodies be accepted

3 Problems?

4 Types of issues/problems
Applying IECEx Procedures System issues related to ISO/IEC Guide 65 and 17025 Technical issues Other Issues

5 Applying IECEx Procedures - ExCB
IECEx 02 IECEx Scheme rules of procedure OD/003 IECEx Assessment procedures OD/005 Quality System requirements for manufacturers OD/009 Issuing of CoCs, ExTRs and QARs ExMC/161/CD Management of assessment and surveillance programs for manufacturers OD/017 Drawing and documentation guidance Other ODs

6 Applying IECEx Procedures – ExTL
IECEx 02 IECEx Scheme rules of procedure OD/003 IECEx Assessment procedures IECEx Operational Document OD/009 Issuing of CoCs, ExTRs and QARs Other ODs IECEx Technical Guidance Documents (TGDs) ExTAG Decision Sheets

7 Applying IECEx Procedures -
Use of data, subcontracting and off site testing New OD024V1 Use of ‘Other Testing Laboratories’ A Manufacturer Testing Laboratory An End-User Testing Laboratory For third party laboratories - hierarchy: IECEx IECEE Local accreditation No accreditation Assessment and Control

8 Applying IECEx Procedures -
Appeals – to IECEx Manufacturing surveillance Adjustment where local system is different (not a Type 5 Scheme) Ensuring QARs are issued ExTRs Blanks in completed ExTRs Lack of supporting data Referencing to ATEX component certificates – see Decision Sheets 2004/006 and 2006/002

9 Applying IECEx Procedures -
Clear delineation of responsibilities of people within ExCB and ExTL, including: Who makes certification decision Who signs what Deputies where necessary

10 Guide 65 and 17025 Using uncontrolled pieces of paper:
For recording results For useful data such as conversion lookup tables Capturing and retaining original data Internal audits - Not always done to schedule Calibration Instruments not in calibration Extending calibration periods

11 Technical Issues Technical issues related to: Equipment Procedures
Competency

12 Technical Issues –IP Testing
Dust testing – keeping dust in circulation Humidity - heating Vibrators – rappers – hoses Slope of hoppers Viewing windows Water testing – Temperature differential - control temperature or use of pressure balance Nozzle calibration

13 Technical Issues –Intrinsic Safety
Intrinsic safety assessment Lack of guidance material OD021V2 Spark test apparatus Inductors and capacitors Temperature classification Measurement Assessment Small component ignition

14 Technical Issues – Flameprooof
Flameproof pressure determination systems Understanding Calibration approaches Gas measurement

15 Technical Issues – Temperature Measurement
Lack of attention to measurement techniques Thermocouple and system calibration Thermocouple attachment Hot spot location

16 General issues Use of latest 17025 – 1 June 2007
Unusual test equipment Accreditation Use of pre-assessments

17 Conclusion Despite the seeming long list of issues here – everyone seems to get there in the end!


Download ppt "Jim Munro Chairman IECEx Panel of Assessors"

Similar presentations


Ads by Google