Download presentation
Presentation is loading. Please wait.
1
Future Communications Infrastructure – An update
V1.0 Future Communications Infrastructure – An update ACP WGM Meeting May 17th, 2010 Nikos Fistas SWP15.2
2
Agenda SESAR FCI projects P15.2.4 P15.2.6 P15.2.7
3
New Data Links Considered
Multilink Concept Airport surface: C band General terrestrial: L Band Satellite: Oceanic + Continental
4
SJU WBS SESAR Programme WP B WP C WP D
15/09/2018 SJU WBS SESAR Programme WP B WP C WP D Target Concept & Architecture Maintenance Master Plan Maintenance ATM Network R&D Programme WP 3 WP 16 Validation Infrastructure R&D Transversal Areas WP 7 WP 5 WP 8 WP 14 W 11 WP 15 WP 13 Network Operation TMA Operation Information Management SWIM F/WOC CNS Network Information Management Systems (NIMS) SWIM Thread WP 4 WP 6 WP 10 WP 12 En Route Operation Airport Operation WP 9 En-route APP ATC Systems Airport Systems Aircraft Enter here your Presentation Title
5
FCI: ATM Communications in 2020+ and SJU projects
15/09/2018 FCI: ATM Communications in and SJU projects 9.21/9.22 REFERENCE MATERIAL VHF NETWORK New Terrestrial System(s) 9.20/9.24/15.2.8 9.44/9.49 15.2.6 9.19 15.2.4 15.2.7/9.16 Enter here your Presentation Title
6
Project P15.2.4: Future Mobile Data Link
15/09/2018 Project P15.2.4: Future Mobile Data Link Partners: Alenia, Airbus, DFS, DSNA, EUROCONTROL, Frequentis, Honeywell, INDRA, NORACON, and Thales “Logistic” split into two groups of activities: Early Tasks (Feb 2010 to Feb 2011) Follow on (full) Project (Feb 2011 to 2015?) Enter here your Presentation Title
7
Project P15.2.4: Interactions with other activities
15/09/2018 Project P15.2.4: Interactions with other activities ESA/Iris US/FAA activities ICAO Other regions S-JU Wireless COM study P Project WRC12 SESAR Projects WP9 WP14 WP15 FP7 SANDRA Enter here your Presentation Title
8
Project P15.2.4: Full Project Activities
15/09/2018 Project P15.2.4: Full Project Activities Task 1: Operational requirements (refined COCR) Task 2: Transport layer management specification Task 3: Recommendation for the terrestrial a/g data link system Task 4: Description of work for Phase 2 (development of terrestrial a/g data link) REFERENCE MATERIAL Enter here your Presentation Title
9
P15.2.4: Early Tasks Activities (links to Full Project Tasks)
15/09/2018 P15.2.4: Early Tasks Activities (links to Full Project Tasks) EWA1: Operational requirements refinement (T1) EWA2: Multilink Operational Concept - COM Architecture (T1, T2 and T3) EWA3: Upper layers and QoS mechanisms (T2) EWA4: LDACS selection facilitation activities (T3) REFERENCE MATERIAL Enter here your Presentation Title
10
Project P15.2.4 ET: Schedule 15/09/2018
Enter here your Presentation Title
11
Key activities linked to ICAO
15/09/2018 Key activities linked to ICAO EWA02: Multilink Operational Concept EWA03: QoS management EWA04: LDACS evaluation criteria EWA01: Future ATM data link services characterization Enter here your Presentation Title
12
Current Status Work is progressing
15/09/2018 Current Status Work is progressing Initial deliverables are expected in September 2010 Enter here your Presentation Title
13
Project P15.2.6: Future Satellite System
15/09/2018 Project P15.2.6: Future Satellite System Partners: Airbus, AENA, ALENIA, EUROCONTROL, FREQUENTIS, INDRA, NORACON and THALES Project Duration: May 2010 to 2014 Future Satellite System Developments ESA IRIS SESAR P15.2.6 Enter here your Presentation Title
14
Project P15.2.6: Main objective
15/09/2018 Project P15.2.6: Main objective ESA Iris Programme aims to design, develop, validate a satellite-based communication system for ATM safety Coms supporting the future ATM Concept of Operations for 2020 and beyond. P aims to develop requirements, perform complementary activities of validation and support standardization. Enter here your Presentation Title
15
Project P15.2.6 Specific objectives
15/09/2018 Project P Specific objectives Define operational concept for future Satellite system in a multilink environment Identify and characterise interfaces and interoperability aspects of the satellite component within the overall SESAR infrastructure. Develop elements of Test-Beds for end-to-end validation and integration with other tests beds developed in Iris project and other SESAR WPs in accordance with SESAR Operational Concept. Validate the Iris development from an end-to-end point of view, verifying the compliance between the EATM Performance Target and the SATCOM system Concept of Operation in a simulated real time environment. Support and promote satellite communication system standardization process in regional international standardizations bodies (EUROCAE, ICAO etc.) REFERENCE MATERIAL Enter here your Presentation Title
16
Current Status Project has just started (May 2010)
15/09/2018 Current Status Project has just started (May 2010) Activity 5 (standardisation support) work plan is being discussed with partners ECTL NEXUS group is planned to be used to facilitate input to ICAO Enter here your Presentation Title
17
Project P15.2.7 and 9.16: AeroMACS
15/09/2018 Project P and 9.16: AeroMACS Partners: P15.2.7: AENA, DSNA, INDRA, NATMIG, Selex, Thales Airbus and ECTL P9.16: AIRBUS, Selex, Thales and ECTL Duration: March 2010 to 2013 Enter here your Presentation Title
18
Project P15.2.7 and 9.16: Overall Aim and Structure
15/09/2018 Project P and 9.16: Overall Aim and Structure Define, validate and demonstrate a technical profile and architecture for a new airport surface communication system (AeroMACS) based on e IEEE standard by studying, developing, integrating and testing system prototypes Project covers overall system aspects and ground component Project 9.16 covers airborne component REFERENCE MATERIAL Enter here your Presentation Title
19
REFERENCE MATERIAL Project P15.2.7 scope
15/09/2018 Project P scope Overall system functional and performance definition Definition of a new specific profile Development of validation plans and scenarios Specification of test objectives and procedures Specification and development of (prototype) ground segment Analysis, simulations and test campaigns addressing interoperability (multiple manufacturers) in laboratory and real airport environments Security and safety analysis Coordination with standardization bodies (RTCA and EUROCAE) REFERENCE MATERIAL Enter here your Presentation Title
20
REFERENCE MATERIAL Project P9.16 scope
15/09/2018 Project P9.16 scope System requirements and architecture definition for the airborne side Specification and development of airborne prototype for mainline aircraft Specification of test objectives and procedures for airborne side. Integration of the airborne prototype in a representative mainline aircraft environment Testing in real environment (on airport, using a/c representative platforms, and up to integration in a real flight test a/c), Advanced studies (limited effort): MIMO studies, integrated antennas, WiMAX evolutions (e.g m) REFERENCE MATERIAL Enter here your Presentation Title
21
Planned Testing P15.2.7 P9.16 Aircraft Thales GS-MS Local integration
15/09/2018 Planned Testing Thales GS-MS Local integration In Thales lab Indra GS-MS In Indra lab Selex GS-MS In Selex lab Thales GS with Indra+Selex MS Interoperability Indra GS and MS Tests with cars On Alicante Airport Thales GS Thales MS Indra GS Indra MS Selex GS Selex MS Integration in A/C environment At Airbus lab Thales GS and MS On Toulouse Selex GS and MS Tests with A/C Aircraft P9.16 P15.2.7 Indra GS with Thales+Selex MS Selex GS with Indra+Thales MS Enter here your Presentation Title
22
15/09/2018 Current Status Ongoing work on system requirements and profile definition (based on common and TDD WiMAX standard parts) Need for simulations and prototype testing Support EUROCAE WG82 / RTCA SC224 activities Project aim for a joint EUROCAE / RTCA Draft Profile Doc by end September 2010. Enter here your Presentation Title
23
Other COM projects Project : Civil-Military Data Link Interoperability Project : Terrestrial communication infrastructure - SWIM backbone
24
Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.