US26: Cornelius Pass Rd -185th Ave
Mandatory Pre-Bid Meeting August 15, 2016 Prime Contractors Must Sign-In on Pre-Bid Meeting Attendance Sheet Presentation will begin at 10:05
2
Introductions ODOT’s Project Manager’s Construction Management Team
Prospective Prime Contractors Name, Title, and Company Subcontractors and MWESB Subcontractors Name and Company Brief description of work your company does
3
Agenda Contractor Networking/Sign-in Introductions
Project Overview, Staging, Sequence Discipline Specific Work Office of Civil Rights Questions and Answers Prime/Sub Contractor Connection Opportunity
4
Project Overview Cornelius Pass Interchange with U.S. 26
U.S. 26 Widening Rock Creek Bridges Replacements & VMS New Sound walls Project Overview Washington County Highway 26 - Sunset N
5
Project Overview Cornelius Pass Interchange with U.S. 26
U.S. 26 Widening Rock Creek Bridges Replacements & VMS New Sound walls Project Overview Washington County Highway 26 - Sunset N
6
Project Overview Cornelius Pass Interchange with U.S. 26
U.S. 26 Widening Rock Creek Bridges Replacements & VMS New Sound walls Project Overview Washington County Highway 26 - Sunset N
7
Project Overview Cornelius Pass Interchange with U.S. 26
U.S. 26 Widening Rock Creek Bridges Replacements & VMS New Sound walls Project Overview Washington County Highway 26 - Sunset N
8
Project Overview Cornelius Pass Interchange with U.S. 26
U.S. 26 Widening Rock Creek Bridges Replacements & VMS New Sound walls Project Overview Washington County Highway 26 - Sunset N
9
ITS Work Sheets ITS-2207 Through ITS-2279
10
Cornelius Interchange with U.S. 26
Staging see sheet 2C-15 Interim Completion date December 31, 2017 Work to be completed detailed in (h-2) of the Special Provisions Weekend Work Defined by f of the Special Provisions Six Phases Up to 3 weekend closures per Phase
11
Cornelius Interchange with U.S. 26
Stage I – C Stage II – C Stage III – C Stage IV – C Stage V – C Stage VI – C Stage I-C (Up to 3 Weekends of Work) See Sheet 2C-16 Remove existing island and traffic separator on west side of intersection Construct new channelizing island and portions of pavement leveling Construct ramp widening on US26 WB to Cornelius Pass Rd SB Loop Exit Ramp CPE Ramp – WB Exit Loop Ramp to SB Work Area
12
Cornelius Interchange with U.S. 26
Stage I – C Stage II – C Stage III – C Stage IV – C Stage V – C Stage VI – C Stage II-C (Up to 3 Weekends of Work) See Sheet 2C-17 & 18 Close one lane SB Cornelius Pass Rd Bikes to share roadway during construction lane closures Construct SB right-turn lane and third SB through lane on Cornelius Pass Rd SB Cornelius Pass Rd Widening Work Area
13
Cornelius Interchange with U.S. 26
Stage I – C Stage II – C Stage III – C Stage IV – C Stage V – C Stage VI – C Stage III-C (Up to 3 Weekends of Work) See Sheet 2C-19 Install temporary striping SB Cornelius Pass Rd to include two through lanes, right-turn lane and bike lane Construct grading behind curb and guardrail Install permanent guardrail Remove curb and guardrail in NW corner of intersection Construct pavement leveling and curb return in NW corner of intersection and widening of north side of US 26 WB entrance ramp CPA line - WB entrance ramp to US 26 Work Area
14
Cornelius Interchange with U.S. 26
Stage I – C Stage II – C Stage III – C Stage IV – C Stage V – C Stage VI – C Stage IV-C See Sheet 2C-20 Construct traffic separator between US26 WB entrance ramp and loop exit ramp Construct ramp widening on south side of US 26 WB entrance ramp Maintain single lane US 26 WB to Cornelius Pass Rd SB loop exit ramp CPA line - WB entrance ramp to US 26 Work Area
15
Cornelius Interchange with U.S. 26
Stage I – C Stage II – C Stage III – C Stage IV – C Stage V – C Stage VI – C Stage V-C See Sheet 2C-21 Restripe Cornelius Pass Rd and ramps to final configuration Reconstruct median on Cornelius Pass Rd using inside lane closures Close and detour NB left-turn as required and as shown on sheet 2C-2 Cornelius Pass Rd median closure Work Area
16
Cornelius Interchange with U.S. 26
Stage I – C Stage II – C Stage III – C Stage IV – C Stage V – C Stage VI – C Stage VI-C: Phase 1 See Sheets 2C-22 through 2C-24 Shift US 26 WB to inside using temporary striping as necessary Construct US 26 WB outside widening East and West of the Cornelius Pass Rd exit ramps All ramps to remain open to traffic US 26 Westbound shoulder closures Work Area
17
Cornelius Interchange with U.S. 26
Stage I – C Stage II – C Stage III – C Stage IV – C Stage V – C Stage VI – C Stage VI-C: Phase 2 See Sheets 2C-25 through 2C-26 Shift US 26 WB to inside using temporary striping Construct portion of US 26 WB outside widening between the Cornelius Pass Rd exit ramps All ramps to remain open to traffic US 26 WB exit ramp shoulder closure Work Area
18
Cornelius Interchange with U.S. 26
Stage I – C Stage II – C Stage III – C Stage IV – C Stage V – C Stage VI – C Stage VI-C: Phase 3 See Sheet 2C-27 Grind and inlay paving on Cornelius Pass Rd Install striping on Cornelius Pass Road SB and US 26 WB exit ramps and deceleration lane per final configuration Complete permanent signal at US 26 WB ramps and Cornelius Pass Rd intersection Cornelius Pass Road and US 26 WB loop ramp permanent striping Work Area
19
Project Overview Cornelius Pass Interchange with U.S. 26
U.S. 26 Widening Rock Creek Bridges Replacements & VMS New Sound walls Project Overview Washington County Highway 26 - Sunset Next we will look at the Rock Creek Bridges Replacement N
20
U.S. 26 Widening and Rock Creek Bridges Replacement
21
U.S. 26 Widening and Rock Creek Bridges Replacement
Stage I - (Sheets 2C-28 Through 2C-30) Stage I Stage II Stage III Stage IV Stage V Shift US 26 EB and WB traffic to outside with temporary striping Remove existing VMS sign Construct the medial crossover ± 2800 ft and WB crown correction Construct median bridge Construct sound walls (access available through temporary barrier this stage only) This is an accelerated bridge construction with majority of members being precast. Be sure to have enough lead time for fabrication/testing/shipping/Installation. Precast deck panel / precast bent cap /precast end panel / precast wing wall / steel diaphragms are all used on this bridge. Precast deck panels also need to be prestressed and are specified in Sec Also, UHPC (ultra-high performance concrete) and steel diaphragms are used on this project. Contractor is not familiar with accelerated construction and extra requirements on UHPC. Please pay special attention to the testing requirements on UHPC and plant Proper deck super elevation will be achieved by adjusting deck panel leveling devices and ground-off of panel top surface. assembly requirements on deck panel in Sec
22
U.S. 26 Widening and Rock Creek Bridges Replacement
Stage II - (Sheets 2C-31 Through 2C-34) Stage I Stage II Stage III Stage IV Stage V Shift WB traffic to median Structure Demolish WB bridge with work containment (above OHW) and optionally construct scour protection (below OHW during in water work window) Construct WB rock creek bridge, median bridge closure pour and barrier
23
U.S. 26 Widening and Rock Creek Bridges Replacement
Stage III - (Sheets 2C-35 through 2C-39) Stage I Stage II Stage III Stage IV Stage V Shift WB traffic to new WB bridge and shift EB traffic to median bridge Demolish existing EB bridge with work containment above (OHW) Optionally construct scour protection (below OHW during in water work window) Construct EB bridge and median bridge closure pour and permanent barrier
24
In Water Work – 2017/2018 or both Install temporary water management
July 15 – Sept 30 Install temporary water management Demo bridge support columns below OHW Build access road Install scour protection Remove temporary water management
25
U.S. 26 Widening and Rock Creek Bridges Replacement
Stage IV - (Sheets 2C-40 through 2C-44) Stage I Stage II Stage III Stage IV Stage V Median Crossover Constructed in Stage 1 Full construction in median completed in Stage I
26
U.S. 26 Widening and Rock Creek Bridges Replacement
Stage IV - (Sheets 2C-40 through 2C-44) Stage I Stage II Stage III Stage IV Stage V Median Crossover Constructed in Stage 1 Full Reconstruction Construct Tall Barrier Construct remaining median widening and median barrier Work Zone located in median
27
U.S. 26 Widening and Rock Creek Bridges Replacement
Stage IV - (Sheets 2C-40 through 2C-44) Stage I Stage II Stage III Stage IV Stage V Median Crossover Constructed in Stage 1 Full Reconstruction Construct Tall Barrier Shoulder Widening Construct shoulder widening with guardrail (west) and cable barrier (east) Complete by June 14, 2018
28
U.S. 26 Widening and Rock Creek Bridges Replacement
Stage V - (Sheets 2C-45 through 2C-49) Stage I Stage II Stage III Stage IV Stage V US 26 at 185th Work Zones US 26 at Cornelius Pass Work Zone Construct ramp/gore reconstruction US26 EB at Cornelius Pass Rd entrance ramps Construct remainder of ramp/gore reconstruction US26 EB at NW 185th Ave Ramps Construct widening on NW 185th Ave WB Exit and Entrance ramps Shift Traffic to Final Configuration by June 14, 2018 Final Signing, Pavement Markings, and Landscaping
29
New Sound Walls See Sheets GD-14 through GD-17 2 Types of Wall
Sound wall #1 (West) 2815 ft – Masonry Block 203 Drilled Shafts Sound wall #2 (East) 1541 ft – Precast Concrete Panels 114 Drilled Shafts Utility Constraints (See cross section and letter of clarification) Minor Grading Work (See cross section)
30
New Sound Walls Utility Constraints From Sheet GD-15
31
New Sound Walls Grading Work From Sheet GD-17
32
Contaminated Soil Management
Contaminated Soil Designated Fill Sites – Placement – Sheet GL Follow Site Sequence 1 → 5 in order
33
Contaminated Soil Management
Contaminated Soil Designated Fill Sites - Contours – Sheet GN
34
Environmental Requirements
Trail and Rock Creek both protected status Limited closures listed in Special Provisions Stop and hold 10 mins daytime; 20 mins night (SP ) Require work containment Bike/Pedestrian Considerations High congestion area Existing Rock Creek Trail
35
Existing Rock Creek Trail
36
Anticipated Project Schedule
Overall
37
Anticipated Project Schedule
In Water Work
38
Further Considerations
Safety Roadway Structures Geotechnical Hydrology Hazmat Utilities Community Affairs
39
Beaverton Project Manager’s Office
Questions? Contact: Project Manager Ron Larson, P.E. Assistant Project Manager Vidal T. Francis questions to Ron Larson Beaverton Project Manager’s Office 6000 SW Raab Road Portland OR, 97221