1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION

2 PROJECTS IN THE PIPELINE IN SR
GENERATION EVACUATION PROJECTS KOODANKULAM APP NEYVELI TS-II EXPANSION KAIGA STAGE -II

3 LINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORES
NEW PROJECTS ON THE ANVIL KUDANKULAM TRANSMISSION SYSTEM( 2000MW) LINES : = 950 Km. ESTIMATED COST = 1710 CRORES KUDANKULAM-TIRUNELVELI 2 X 400 KV D/C LINES WITH QUAD (108 & 83 Km.) TIRUNELVELI-UDUMALPET D/C LINE WITH TWIN MOOSE (300Km) KARNATAKA T N KERALA LILO OF BOTH CIRCUITS OF MADURAI-TRIVANDRUM LINE AT TIRUNELVELI ( 2 X 55 Km) EDAMON-MUVATTUPUZHA D/C LINE QUAD (150Km) TIRUNELVELI-EDAMON 400KV D/C LINE (110Km). MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH QUAD CONDUCTORS (90Km)

4 NEW PROJECTS ON THE ANVIL
KUDANKULAM TRANSMISSION SYSTEM( 2000MW) SUB-STATIONS NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, MUVATTUPUZHA AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S SUPPLEMENTARY TRANSMISSION SYSTEM LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT KARAIKUDI (TAMILNADU) LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT HASSAN.(KARNATAKA)

5 MYSORE-KOZHIKODE D/C LINE
NEW PROJECTS ON THE ANVIL KAIGA 3 & 4 TRANSMISSION SYSTEM COST ESTIMATE : 512 CRORES LINES : 413 Kms MYSORE-KOZHIKODE D/C LINE LILO OF KOLAR-SRIPERUMBADUR AT MELAKOTTAIYUR (40KM) NARENDRA-DAVANGERE D/C LINE SUB-STATION : 2 Nos. New K E R A L NEW 400/220KV SUBSTATION AT KOZHIKODE & MELAKOTTAIYUR 2ND 315MVA TRANSFORMER AT HIRIYUR S/S. BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) & HIRIYUR.

6 NEW PROJECTS ON THE ANVIL
NLC-TS-II EXPANSION TRANSMISSION SYSTEM COST ESTIMATE : 721 CRORES LINES : 467 Km. 2 NOS. 400KV S/C LINES FROM NEYVELI-TS-II (EXISTING) TO NLC TS-II (EXPAN) (8 KM). KARNATAKA NEYVELI-PUGALUR D/C LINE T N PUGALUR-MADURAI D/C LINE K E R A L UDUMALPET-ARASUR D/C LINE LILO OF NEYVELI-SRIPERUMBU- DUR LINE AT PONDY. SUB-STATION NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & PONDICHERRY.