Presentation is loading. Please wait.

Presentation is loading. Please wait.

Pedestrian Connectivity and Greenway Projects

Similar presentations


Presentation on theme: "Pedestrian Connectivity and Greenway Projects"— Presentation transcript:

1 Pedestrian Connectivity and Greenway Projects
Presented by Graham County STEP UP Diabetes Coalition October 2016

2 Robbinsville Pedestrian Connectivity Plan
Graham Revitalization Economic Action Team -GREAT Robbinsville Pedestrian Connectivity Plan

3 Develop Greenways & Parks
Graham Revitalization Economic Action Team -GREAT Develop Greenways & Parks

4 Graham Revitalization Economic Action Team -GREAT
RHS Greenway

5 Graham Revitalization Economic Action Team -GREAT
Greenway Volunteers

6 Graham Revitalization Economic Action Team -GREAT
Greenway View

7 Greenway Project Dedication
Graham Revitalization Economic Action Team -GREAT Greenway Project Dedication

8 Outdoor Classroom Project
Graham Revitalization Economic Action Team -GREAT Outdoor Classroom Project

9 Volunteers Helping with Project
Graham Revitalization Economic Action Team -GREAT Volunteers Helping with Project

10 Completed Outdoor Classroom
Graham Revitalization Economic Action Team -GREAT Completed Outdoor Classroom

11 SVC Site Master Design Project
Graham Revitalization Economic Action Team -GREAT SVC Site Master Design Project

12 SVC Nature Trail Play Park Project
Graham Revitalization Economic Action Team -GREAT SVC Nature Trail Play Park Project and Wind Garden

13 Collaboration is the Key to the Process
Graham Revitalization Economic Action Team -GREAT Collaboration is the Key to the Process


Download ppt "Pedestrian Connectivity and Greenway Projects"

Similar presentations


Ads by Google