Presentation is loading. Please wait.

Presentation is loading. Please wait.

Nuclear Power - a reliable partner

Similar presentations


Presentation on theme: "Nuclear Power - a reliable partner"— Presentation transcript:

1 Nuclear Power - a reliable partner
India Energy Forum -9th Nuclear Energy Conclave 27th Oct’17 Nuclear Power a reliable partner

2 Amongst world’s few who have the capability to manufacture the entire type / range of power equipment- be it Thermal, Gas, Nuclear, Hydro or Solar ABOUT US 17 manufacturing units + 2 repair units + 8 service centers

3 Have proven turnkey capabilities for executing power projects from concept-to-commissioning for a wide range of unit sizes up-to 1000 MW and for wide variety of fuels. Over 180 GW capacity installed globally BHEL supplied sets have exhibited world class performance Manufacture 180 products in 30 major product groups Over 50 years of rich experience Have strong presence in domestic market and references in over 80 countries ABOUT US Power Industry Transmission Transportation Defence Industrial Products Oil & GAS Renewable Energy

4 Industry Expectations Industry preparedness
Equipment Industry Expectations Industry preparedness Capability Building measures Steam Generators Bulk ordering 38 Steam Generators already supplied to NPCIL (36 nos. in service) Transition from development mode to Production mode Gearing up for supply of Steam Generator within 24 months Creation of additional manufacturing centres Deployment of additional resources

5 Industry Expectations Industry preparedness
Equipment Industry Expectations Industry preparedness Capability Building measures End Shields Bulk ordering 6 nos. for 236 MWe NPPs already supplied to NPCIL. Augmentation of manufacturing facility at Bhopal is underway Reactor Headers 60 nos. Reactor Headers supplied Gearing up for supply of 8 Reactor Headers per annum Other Primary Side Equipment Advance sharing of Technical Specification of equipment We can do it all with the huge manufacturing prowess existing within the organisation

6 Industry Expectations Industry preparedness
Equipment Industry Expectations Industry preparedness Capability Building measures Turbine Island Package Standardise & go for Bulk ordering 12 out of 22 Reactors of NPCIL are equipped with BHEL Steam Turbines. BHEL is having enormous Technology depth and manufacturing expertize. For long term sustainability & support services, BHEL is the most reliable partner. Our EPC model is based on maximum in-house manufacturing strength. Other Packages Power Transformers Primary Piping Common Services Plant Water system, etc. We can do it all with the huge manufacturing prowess existing within the organisation

7 Thanks !


Download ppt "Nuclear Power - a reliable partner"

Similar presentations


Ads by Google