1 ACS news Circulator TCU: control tests in progress All cavity racks
cabling: DONE bugs in AFT software All cavity racks Daniel’ s equipment being installed Racks Cleaning: DONE Arc detectors: klystron, circ, load, WG: ok WG (platform, couplers): Feb Lead detectors installed & cabled: DONE Klystron & WG RF cabling in progress PLC software upgraded & tested (WG switches etc): DONE HV tests: HV bunkers tests (crowbar, 60kV on all klystrons): DONE HV cables polarity: DONE RF- PO intlk tests started Spare power converter to be re-cabled (AB/PO) Software tests to be done RF cabling final connection campaign ACS (FSU) Water cooling Procedure defined: DONE tests...next week

2 ADT news MUX (Andy) Connect RF cables: Eric&Wolfgang (when?)
Define patch panels Install equipment New cables?? Connect RF cables: Eric&Wolfgang (when?) Install Predriver: Eric Control Upgrade of PLC software: DONE implement new internet addresses: DONE FIP network ready (SR4&tunnel): DONE Intlk&io tests: starting next week

3 Faraday Cages Cabling (who?) – needed for klystron tests in Feb
Connect all flexwell cables to patch panels Install 1 missing patch panel Missing cables? VME chassis & ventilation units Install equipment (Luca & FSU) – wk5 Remote reboot to be recabled (Luca) Doors (contact & key)?

4

5 Platform HOM loads RF cables Directional couplers
new solution proposed by DV RF cables CavFWD cables cut to correct length (JCP) mount connectors CavRFL cables install cables Directional couplers Install couplers Arc detectors (C.Nicou) Pull cables Install equipment Zone cleaning clean all zone after TS/CV chilled water installation

6 InterWall region CavRFL cables (C. Nicou) WG
identify new cables mount connectors WG Install spacers between HOM cables & WG Pull new Arc Det cables

7 RUX45 WRL installation in progress ACS Modules
MC Couplers mount MC couplers mechanics (starts next wk) cable MC couplers connect to WG Install and cable Arc detectors CALIBRATE ANTENNA CABLES - Ph. B./JCP Vacuum chassis – Billy ? Ionic pumps off on two modules! Bend antenna cables?

8

9 RB’s ADT, APW Install amplifiers (Eric) Q7-Q9-ADT
prepare and install patch panels (Eric): STARTED install ADT electrical distrib box (TS/EL – wk4) water cooling connections (Eric) replace/repair few RF cables check connection to earth

10 SR4 Install GPS antenna – in progress Produce DIC: ASAP False floor
Install chassis Cleaning (zone, racks)

11 General ACS RF cables calibration (JCP, Ph. B): when??
Samy’DB (provide patch panel doc for cryo) MTF Water pressure tests: procedure defined TS/EL work: almost finished UX45 roof installation: end Feb Vacuum activity: close RF sector in February Magnet transport ongoing..

12 Planning January: February: March HV local tests, HV cable tests: DONE
SR4 DIC Water tests WRL installation: in progress February: Antenna calibration & RF cables calibration HV bunkers: fireproof, green light from SC Power Converter Tests: STARTED FESA2.9 + expert appl. implemented Vacuum installation March all work in RUX45 & RB’s and interwall region finished start klystron tests  need RF cables connected & calibrated end March: start of cryo tests