Presentation is loading. Please wait.

Presentation is loading. Please wait.

U.S. ATLAS Testbed Status Report

Similar presentations


Presentation on theme: "U.S. ATLAS Testbed Status Report"— Presentation transcript:

1 U.S. ATLAS Testbed Status Report
Kaushik De Univ. of Texas at Arlington BNL Workshop, May 2002

2 Outline 2 week assessment Goals Planning Work organization
teams details recent accomplishments SC2002: 6 month plan 12 month plan

3 Assessment Testbed Strengths Testbed Weaknesses
Excellent package manager Information service plans ready Advanced grid portal Database manager ready Lots of existing hardware Experienced people Testbed Weaknesses Middleware outdated - Globus 1.1.3 Waiting for other middleware No applications, no interfaces 8 independent sites Need concrete plans for deployment Need concrete short term goals

4 Testbed Goals Demonstrate success of grid computing model for HEP
in data production in data access in data analysis Develop & deploy grid middleware and applications layered structure ease of deployment Evolve into fully functioning scalable distributed tiered grid

5 Testbed Plans UTA Workshop as launch-pad SC2002 as milestone
for testbed middleware upgrade to identify tasks & organize effort + resources SC2002 as milestone demonstrate real working HEP grid applications demonstrate middleware and tools developed for HEP component integration demonstrate inter-operability among experiments

6 UTA Workshop 21 talks, 8 discussion sessions 8 page tasklist
21 talks, 8 discussion sessions 8 page tasklist

7 Testbed Tasklist Middleware deployment Physics application deployment
OS, Globus, Condor... Physics application deployment Information services (MDS) Middleware development Data production & access Integration & testing Analysis tools Success must be measured by ease of deployment and usefulness to physicists

8 Hardware 8 gatekeepers - ANL, BNL, LBNL, BU, IU, UM, OU, UTA
Farms - BNL, LBNL, IU, UTA +Multiple R&D gatekeepers - iVDGL GIIS - ATLAS GIIS atlas10/14 - EDG testing - glue schema heppc17/19 - GRAT devel @iu - Grappa portal ? - iVDGL-2 testbed

9 Fabric Software Jason Smith, Saul Youssef, KD, Eric Myers
Use kickstart for OS upgrade Upgrade to RH 7.2  Pacman to distribute software First stage deployment Globus, cernlib  JS & KD joined VDT team last week to facilitate use in ATLAS Second stage deployment Magda, GDMP, Condor...

10 Applications Team Horst Severini, KD… Start with Athena-atlfast
afs based package - requires standard ATLAS distribution  Sandbox atlfast - generic site  Build sandboxed DC1 application package Released GRAT version 0.1 on 4/12/02  version 0.2 on 4/22/02  version 0.3 on 5/7/02

11 MDS Team Dantong Yu, Patrick McGuigan, KD, Nurcan Ozturk
publish BNL acas information  hierarchical GIIS server  pacman information provider GridView upgrade Glue schema testbed  iVDGL GIIS server 

12 Middleware and Application Teams
Pacman - Saul Youssef Grappa - Shava Smallen Magda - Wensheng Deng Gripe - Rob Gardner GridView - Patrick McGuigan GridExpert - Mark Sosebee Analysis tools - Horst Severini ...

13 Integration Teams EDG - Ed May, Jerry G.
Virtual Data - Sasha Vaniachin, Pavel Nevski,… ATLAS distributions - Alex Undrus, Shane Canon, Iwona Sakrejda Networking - Shawn McKee, Rob Gardner Data management - Wensheng Deng, Ed May, David Malon CAS, ...

14 SC2002 Plans ATLAS-CMS demo (FNAL/SLAC) Monitoring demo (BNL)
Rick Cavanaugh & KD preliminary schedule agreed ATLAS users have access to CMS sites atlfast running at CMS sites Monitoring demo (BNL) Rich Baker & Dantong Yu conceptual plan agreed iVDGL-2 demo Rob Gardner & Ruth Pordes plan under discussion Grappa demo (IU/ANL) Magda/testbed demo


Download ppt "U.S. ATLAS Testbed Status Report"

Similar presentations


Ads by Google