Download presentation
Presentation is loading. Please wait.
Published byanswersheet help1346 Modified over 6 years ago
1
Business Environment Dr. Aravind Banakar 9901366442 – 9902787224
2
Business Environment CASE STUDY (20Marks) The Three Gorges Dam in China is one of the world's largest hydroelectric dams, providing energy for millions of people. However, the dam's construction forever altered the Yangtze River ecosystem and the lives of local residents. In this case study, students explore the complex and interrelated issues associated with large eco system maltering projects like dams and develop a persuasive argument for or against their construction. Do the benefits from a dam outweigh the ecological, economic, and social costs? Answering this question is difficult, since the benefits and costs are not directly comparable.
3
How do you compare the loss of endemic species to the increased safety from flooding? How do you weigh a relocated family's social and economic costs in comparison to the benefits of a sustainable and renewable energy source? Although this case was developed for an undergraduate course in fisheries management, it would also be directly applicable to courses in ecology, environmental engineering, or global issues.
4
Answer the following question. Q1. Discuss and evaluate information related to ecological, economic, or social aspects of dam construction. Q2. Debate a persuasive argument for or against dam construction.
5
Global Study Solutions Dr. Aravind Banakar aravind.banakar@gmail.com www.mbacasestudyanswers.com 9901366442 – 9902787224
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.