Moving to Phase II: Watershed Implementation Plans
DRAFT Moving to Phase II: Watershed Implementation Plans MACO Cambridge, MD January 7, 2011 DRAFT
2
Implications The Chesapeake Bay TMDL was primarily a technical exercise, admittedly on a much larger scale than ever before completed. The implications are in the implementation of the TMDL, and specific plans needed to achieve the wasteload and load allocations.
3
Glossary Allocations: Maximum allowable load; WLA and LA.
Basins: Five major basis in Maryland: Potomac, Susquehanna, Patuxent, Western Shore, and Eastern Shore.
5
Glossary Contingencies: “Plan B” If a strategy does not achieve the projected load reduction a contingency must be in place to make up the deficit. Two Year Milestones: part of the accountability framework. Goals will be assessed and contingencies imposed at two year intervals. Sectors: Point sources, agriculture, stormwater, septics, forest. Strategies: Best management practices, programs or approaches that reduce nutrient loads. WIP: Watershed Implementation Plan.
6
What is the WIP? Watershed Implementation Plan.
Provides “reasonable assurance” for the TMDL, including reductions from non-regulated sectors. Creates the foundation for an implementation schedule and milestones. Provides the basis for accountability. Establishes the strategies and practices that will be used to reach the interim goal of 70% of the total reductions by 2017.
7
Basic Background Court Settlement: Ches. Bay TMDLs by December 2010
Agreement by Executive Council in 2000 to clean up Bay or do a TMDL by 2010. EPA Led a Regional/Watershed-wide TMDL Development Process Region is entire Bay drainage up to and including NY, WV, DE, in addition to PA, VA, DC and MD.
8
Basic Background Watershed Implementation Plans:
Allowed States to Allocate Loads to WLA and LA Support “Reasonable Assurance” of Implementation Part of new federal “Accountability Framework” to Ensure Results Clean up now required under federal Clean Water Act
9
More Background Federal “Accountability Framework”
Bay TMDLs Watershed Implementation Plans (WIPs) 2-Year Implementation Milestones (due by end of 2011). Tracking & Evaluating Progress Federal “Consequences” or “Backstops.” EPA made it clear from the TMDL backstops for inadequate WIPs that they were serious this time.
10
Phase I WIP Accomplishments
DRAFT Phase I WIP Accomplishments Set equitable allocations by sector and basin. Provided legal basis for stricter permits to accelerate progress. Provided a “default” implementation plan that can be used “as is” or modified during Phase II. Started the discussion. DRAFT
11
Growth in Loads
12
Offsetting Growth All growth adds to the nutrient load, but not equally, e.g., ENR plant vs. septics Areas will be classified as high, medium or low per capita impact Impose highest offset requirements (more than the added load) where loads per capita are high and least where loads are low There will be competition for scarce offsets Once offsets are used up, growth will be curtailed
13
Goals of Phase II Assign responsibility for load reductions
Federal facilities and municipalities Stormwater, e.g., State Highways Increased emphasis on cost and cost effectiveness. Develop more cost effective and lower cost strategies. Develop funding approaches. Trading/offsets
14
Goals of Phase II Refinement of Phase I. Respond to model changes
Finalize local allocations and refine strategies Provide greater geographic resolution for allocations Respond to model changes Changes in land use will have significant implications Changes in how model addresses manure management also key issue.
15
Key Outcomes of Phase II
Will determine at local level: Who’s responsible for how much implementation Implementation costs to each source sector How much growth/economic development can fit, where, and at what costs
16
Who gets allocations? Any entity that generates significant loads and has authority or is required to control them. Examples: Local governments: wastewater, stormwater, septics. Soil Conservation Districts: agriculture. State Highways: stormwater Federal Facilities: stormwater, wastewater Other major facilities, e.g., airports, parks, etc.
17
What will change in Phase II?
Strategies will be adjusted: Model will be modified with respect to land use and manure management Local governments can redistribute allocations among sectors Increased geographic specificity Increased sector specificity
18
Process and Approach Work at the county scale. Includes:
Municipalities SCDs SHA Federal Facilities Other Major Facilities (e.g., airports) Start with revised allocations based on Model revision, using same equity rules as in TMDL. Revise via negotiation to achieve greater cost effectiveness and feasibility.
19
Time Frame Current schedule calls for submission by June 2011 – an extension has been requested. Regardless of extension, two year ( ) milestones must be ready by December, 2011. Final model (5.3.2) and allocations may not be available until April – we cannot wait for final numbers to begin working!
20
Critical First Steps Meetings in January and February for elected officials. Regional training workshop in January for staff. Identify county, municipal, SCD contacts. Identify liaison to each county. Identify lead staff in each local Department and organize a coordination structure. Draft a preliminary workplan and begin work with interim allocations until final allocations are available. State to provide technical assistance.
21
Critical Next Steps Workplan for 2011-2013 milestones.
“Infrastructure” priorities: Funding Staffing: Admin and Technical Tracking and Reporting Sector priorities: SW, Septics, Ag, WWTPs Geographic priorities Begin development of offset policy working with State agencies.
22
Pilot Experiences It can be done! Substantial effort for everyone.
Communication is paramount. State or local can lead, but the Phase II Plan must meet State and EPA requirements. Build on WRE, existing TMDLs, Water and Sewer Plans, comp plans. Control your destiny.
23
Phase III 2017-2020 May be preceded by revised TMDL.
DRAFT Phase III May be preceded by revised TMDL. Expectation is that there will be new and innovative practices that can be applied at that time. Full implementation of what is needed to achieve water quality standards, by 2020. DRAFT