TGv Closing Report – March 2007

Similar presentations


Presentation on theme: "TGv Closing Report – March 2007"— Presentation transcript:

1 TGv Closing Report – March 2007
January 2005 doc.: IEEE /xxxx September 18 TGv Closing Report – March 2007 DATE: March 2007 Author(s) Name Company Address Phone Pat R. Calhoun Cisco Systems, Inc 170 West Tasman Dr., San Jose, CA 95134 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdff>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at < Pat R. Calhoun, Cisco Pat R Calhoun, Airespace

2 Abstract Report of the meeting of TGv at the March 2007 session.
January 2005 doc.: IEEE /xxxx September 18 Abstract Report of the meeting of TGv at the March 2007 session. Pat R. Calhoun, Cisco Pat R Calhoun, Airespace

3 Goals for January 2007 September 18 Address Internal Review Comments (highest priority) Entertain new submissions Determine Letter Ballot Readiness Pat R. Calhoun, Cisco

4 Submissions Submissions for March Meeting September 18
v-tgv-objectives v-tgv-internal-review-comment-submissions v-normative-text-cid-251 v-comment-resolutions-cid293 v-comment-96-resolution v-tgv-draft-0-08-validation-review-comments v-admission-control-traffic-request v-normative-text-proposal-qos-aware-load-balancing v-comment-resolutions v-normative-text-fbms-termination v-normative-text-fbms-counter-id v-normative-text-tim-request v-dedicated-protection v-sta-location-capability-layer-management-normative-text v-e911-clarification v-normative-text-presferred-channel v-interference-diagnositcs v-normative-text-leader-based-multicast v-wake-wlan v-tgv-internal-review-comment-resolution-gv v-multi-level-power-control v-comment-77-resolution Pat R. Calhoun, Cisco

5 Chair Vote Which candidate would you prefer as chair of TGv?
September 18 Which candidate would you prefer as chair of TGv? Joe Epstein: 8 Dorothy Stanley: 21 None of the Above: 0 Pat R. Calhoun, Cisco

6 TGv Proposed Timeline The following time table will be used by TGv
September 18 The following time table will be used by TGv Base line accepted: January 06 (Completed) Submissions addressing objectives: Start in March 06 TG Ad-Hoc Draft Internal Review: October 06 (Completed) Internal review created 446 comments New Timeline Initial Working Group Letter Ballot: May 07 Re-circulation Working Group Letter Ballot: November 07 Form Sponsor Ballot Pool: July 08 Initial Sponsor Ballot: September 08 Re-circulation Sponsor Ballot: November 08 Final WG/EC Approval: May 09 Final WC Approval: July 09 RevCom/Standards Board Approval: September 09 IEEE Publish: October 09 Pat R. Calhoun, Cisco

7 Work completed September 18 Pat has left the building…Nominated Dorothy Stanley as new TGv chair All 446 internal review comments have been resolved The following comment resolutions have been accepted and will be integrated into the TGv 0.10 draft v-tgv-internal-review-comment-submissions v-normative-text-cid-251 v-comment-resolutions-cid293 v-comment-96-resolution v-tgv-draft-0-08-validation-review-comments v-comment-resolutions v-comment-77-resolution v-tgv-internal-review-comment-resolution-gv The following new submission normative text has been accepted and will be integrated into the TGv 0.10 draft v-normative-text-proposal-qos-aware-load-balancing v-normative-text-fbms-termination v-normative-text-fbms-counter-id v-STA-location-capability-Layer-Management-Normative-Text Pat R. Calhoun, Cisco

8 Output Documents D0.09 TGv Draft Specification
September 18 D0.09 TGv Draft Specification v-tgv-objectives v-tgv-internal-review-comment-submissions v-meeting-report-March-2007 v-closing-report-March-2007 (this document) v-minutes-tgv-orlando-meeting-mar-07 Pat R. Calhoun, Cisco

9 Goals for May TGv Proposals Review updated objectives draft
September 18 TGv Proposals E911/Location (Allan Thomson) – 30 mins AP Collaboration (Alex Ashley) – 30 mins Tim Broadcast (Menzo) – 30 mins Multi Level Power Control (Floyd Backes) – 30 mins Leader Based Multicast (Youngsoon) – 30 mins Power Saving (Emily Qi) – 45 mins Wake over WLAN (Emily Qi) – 45 mins Preferred Channel (Joe Kwak) – 30 mins Interference Diagnostics (Joe Kwak) – 30 mins Review updated objectives draft Letter Ballot Pat R. Calhoun, Cisco

10 Adjourn Meeting adjourned at xx:xx on March 15th, 2007 September 18
Pat R. Calhoun, Cisco