Mars Surface To Air Recovery System Group Status Report
Patrick Boston Jarrod Griffith Anthony Riddle Christopher Spencer Brandon Weiler 3/30/2016
2
Introduction Overview Timeline: Previous two weeks
Background Problem Definition Timeline: Previous two weeks Gantt Chart Milestones Progress Conclusion and Future Work
3
Overview: Background NASA sends rovers to Mars to collect samples for return to Earth by 2020 Deploy multiple rovers to cover a large area Fixed base location for sample analysis and transport to Earth Need exists to connect rovers to the analysis base
4
Overview: Problem Definition
Solution for this need is a fixed wing UAV Fulton Surface-To-Air Recovery (STAR) system Developed in the 1960's by the U.S. Army and Air Force Skyhook secured the lift line Hooked to a recovery winch Project Purpose: Develop a modified Fulton STAR system integrated in a vision-based unmanned aerial vehicle
5
Timeline: Gantt Chart
6
Timeline: Gantt Chart
7
Timeline: Milestone Progress
Intended Milestones Redesign Catch and Reel Mechanism Build Test
8
Timeline: Milestone Progress
Redesign Catch and Reel Mechanism
9
Timeline: Milestone Progress
Redesign Catch and Reel Mechanism
10
Timeline: Milestone Progress
Redesign Catch and Reel Mechanism
11
Timeline: Milestone Progress
Build
12
Timeline: Milestone Progress
Build
13
Timeline: Milestone Progress
Test
14
Conclusion and Future Work
Project Purpose: Develop a modified Fulton STAR system integrated in a vision-based unmanned aerial vehicle Intended Milestones Redesign Catch and Reel Mechanism Build Test Complete controlled test flight Modify and install in UAV Complete test flight and recover a sample payload