Download presentation
Presentation is loading. Please wait.
Published byสาวิทย์ สโตเกอร์ Modified over 6 years ago
1
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
Dane Batema Benoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John Tapee Carlos Vergara Team 1:
2
Organization Weekly All-hands Meeting Monday @ 5:30 PM
Individual concentration teams add meetings to Calendar Utilize Yahoo! Groups website for scheduling, communication and meeting reminders AAE 451 Team 1
3
Task Assignments Benoit Kyle Patricia Drew Leader: Kyle Ryan
Co-Lead: John Tapee AAE 451 Team 1
4
Milestones Aerodynamics Airfoil shape choice Drag polar curve
Wing geometry Tail geometry Mathematical model AAE 451 Team 1
5
Milestones Structures Geometric layout of wing
Wing, fuselage, tail material choice Balsa vs. Foam Manufacturability & Weight efficiency test By 2nd PDR (10/12) Landing gear location and materials Weight estimation AAE 451 Team 1
6
Milestones Propulsion Engine choice Propeller Appropriate Battery
Gearbox Study Speed Controller Propeller Optimal for chosen motor & mission Aerodynamic properties Appropriate Battery AAE 451 Team 1
7
Milestones Dynamics & Controls Control Surface sizing Tail location
CG optimization Servos Placement Functionality Ground control AAE 451 Team 1
8
Component Trade Studies
Landing Gear Fairings vs. thin carbon composite disk w/ aluminum strut Manufacturability and effect on drag Wingtips Raked vs. cutout vs. nothing Structural attachment complication and weight vs. aerodynamic benefit AAE 451 Team 1
9
Timeline Team Gantt Chart – 9/11-10/01 AAE 451 Team 1
10
Timeline Team Gantt Chart – 10/01-10/31 AAE 451 Team 1
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.