Antique wooden step ladders
2
The electrician has his name on everything including these folding chairs used for their lunches
3
Duct tape to maintain the chairs
4
Were going to install three new windows in the link
5
The brick has been cut to accommodate the windows
6
Strothers came to cut the old brick out of the link to open up the kitchen access
7
The electrician and the bricklayer on site
8
Angle iron to hold up the upper brickwork
9
Sliding garage doors removed
10
Kubota on site, Oscar is confused
11
Finished with the wet saw on the brickwork
12
Three new windows installed
13
The girls are watching the progress
14
Everything has Prest Electric written on it
15
cleaning
16
Prest Electric clock with protective covering
17
I thought Id write not property Prest Electric on this piece of plywood used for a proposal
18
Everything chained together overnight
19
This is starting to get a bit nuts
20
Getting ready for the entrance system
21
Installation process
22
Where do you want this wire?
23
I need the wiring completed before I can proceed
24
Wires and lighting everywhere
25
Its getting sorted out
26
Someone blew snow on the shed roof, Pete removes it
27
Heat duct for the porch being installed
28
Propane tanks being delivered and installed
29
Electrical inspection finished now we insulate and poly
30
Seal end of joists
31
Red tuct tape used to seal joints in the poly – acoustic sealant for the other joints
32
A slow but necessary process
33
Lots of corners and wires in the road
34
6 mil poly for the main floor ceiling
35
Acoustic seal along the seams
36
Ceiling first, then the walls
37
The Building Inspector can examine the work
38
Now its time to do the walls, insulation is in place
39
Tim delivers the drywall
40
Oscar would like a cookie
41
Which one is mine?
42
Thats west of Carlow – Tim got lost (bad directions)
43
Weve hung the drywall on the main floor, dust on the lens
44
More drywall to install downstairs
45
Supply of drywall is slowly going down
46
Choose carefully – little waste
47
Back at it the next morning – nice sunrise
48
We install the grid ceiling
49
The link is drywalled as well
50
East end of the living area
51
Cove inside the squares
52
Attic blown insulation going in
53
Two man job
54
The phone number says it all
55
Ken and Oscar share lunch
56
Oscar is gentle when feeding on my lunch