Mission Overview
3
Predicted Results
4
Predicted Results
5
Design Overview Design Specs: 16 cm sided cube
UV-B diode and ozone sensors at topmost four corners Other hardware has been placed along internal walls Heater has been separated into 3 components to distribute heat.
6
Design Overview
8
Design Overview How does it work? Major differences from the proposal
Box size: 20 cm cube to 16 cm cube 6 batteries vs. 8 batteries Split the heater element
9
Results and Analysis Launch Touchdown
Orientation changed due to rolling Burst
10
Relative Humidity Touchdown Launch Burst
12
Atmospheric Pressure Launch Touchdown and Recovery Burst
13
Internal Temperature Launch Burst Tropopause
14
Ozone Concentration Just entering Ozone layer
15
Ultraviolet Radiation
Breaking Cloud Cover
16
Failure Analysis External Temperature Sensor Camera Shutdown
Electrical Short Camera Shutdown Battery Death Protoshield Malfunction Loose connection
17
Conclusion Ozone values indeed increase as a function of altitude
UV-B intensity is also proportional to altitude Ozone and UV-B data correlation
18
Ready to Fly Again Payload without the ozone and UV-B sensors can be stored in dry, room temp environment Ozone sensor should be stored as to reduce oxidation Diode should be stored safely away from electrostatic discharge
19
Lessons Learned Done differently
Entire team should know the programming aspect Fly multiple diodes Secure internal components better
20
Compliance Matrix Description 0.1 0.2 0.3 0.4 0.5
Require-ment # Description Measure concentrations of ozone and UV-B radiation as a function of altitude 0.1 Reach an altitude of 30 km 0.2 Maintain an internal temperature above -10 ° C 0.3 Abide by a weight and monetary budget of kg and $250, respectively 0.4 Maintain safe working condition and ensure the general safety of the team members through out the project 0.5 Morpheus must be in pre-flight conditions with in 24 hours after it is retrieved
21
Budgets : Mass and Monetary
22
Message to Next Semester