1 Engineering Projects Update Al Moro, P.E. Chief Harbor Engineer
January 20, 2010

2 Dredging and In-Water Projects
1 Main Channel II – ACOE Remedial - IR Site 7 Pier G Landfill Removal of Intake Structure 2 4 3 4 3 1 2

3 EIR Consideration 1 3 2 3 2 1 4 4 Pier S Marine Terminal
Back Channel Bottom widening GD Bridge Replacement On-Dock Rail Support Yard Terminal Island Rail Improvements 1 3 2 3 2 1 4 4

4 Roadway Projects 3 2 4 1 2 1 3 4 Traffic Signal at Harbor Scenic
(Complete) Shoemaker Bridge - Barrier Repairs and Deck Sealing Anaheim and Santa Fe Ocean Blvd over LA River and Harbor Scenic 1 2 1 3 4

5 Rail Infrastructure Projects
Track Realignment at Ocean Blvd. On Dock Rail Support Yard* Terminal Island Rail Infrastructure* *Pending EIR

6 Shore Power Projects Pier A Pier C Pier T Pier G Pier J Middle Harbor

7 SCE Coordination Maintain Essential Use Status
Negotiating a New Portwide Service Agreement Negotiating Competitive Electrical Rate Rule 18 Deviation (sub meter shore to ship power) Method of Service High Voltage Tariff Rate

8 Portwide Infrastructure
Water Facilities Assessment Study Sewer Assessment Study Pavement Management Plan

9 Marine Oil Terminals Engineering and Maintenance Standards (MOTEMS)

10 Thank You