Download presentation
Presentation is loading. Please wait.
1
EXCALIBUR 4500 m3 Ethylene Carrier www.mediterraneanav.it
17 September September 2018
2
17 September September 2018 Excalibur
3
Technical characteristics
17 September September 2018 Technical characteristics Lenght overall mt. 104,0 Lenght between perpendiculars mt. 96,0 Breadth mt. 16,0 Moulded depth (from keel to main deck) mt. 8,40 Summer draft mt. 7,50 D.W.T. tonn
4
Technical characteristics
17 September September 2018 Technical characteristics Cargoes Two different products loaded, contained and discharged contemporarily providing that only one requires cooling. Acetaldehyde, Anhydrous Ammonia (max -20), Butadiene, Batane (Iso/normal), Butylene, Butane/Propane mixture, Propane, Commercial Propane, Prolylene, Vynil Chloride monomer, Isoprene, Ethane, Butadiene Hydrocarbon mixture (C4), Ethylene.
5
Technical characteristics
17 September September 2018 Technical characteristics Segregated ballast capacity Cum Bunker capacity High f.o. m3 450 – gasoil m3 100 at 100% MAIN ENGINE 4000 Kw at 720 rpm Service speed 15,8 knots at 85% with 15% sea margin Max speed 17,4 knots Nitrogen generator 450 Ncum /h at 99% Alternative propulsion System Green Star notation Two deck tanks 25m3
6
The fastest ethylene carrier in the world!!!
17 September September 2018 Points of STRENGHT Max speed 17,4 knots Low consuption design 25 years life design High manoeuvrability Bow thruster High bridge visibility 2 deck tanks for commercial flexibility & change of cargo Green star notation Shaft generator kw suitable for cooling down in navigation Alternative propulsion system The fastest ethylene carrier in the world!!!
7
EXCALIBUR under construction at Bach Dang Shipyard
17 September September 2018 EXCALIBUR under construction at Bach Dang Shipyard Hull completed
8
Tanks Cargo tanks on barges at Shipyard Cargo tank installation
17 September September 2018 Tanks Cargo tanks on barges at Shipyard Cargo tank installation
9
Bottom view during cargo tank installation
17 September September 2018 Tanks Bottom view during cargo tank installation Cargo tank installation
10
Up-to-date Overview Superstructures Side overview
17 September September 2018 Up-to-date Overview Superstructures Side overview
11
Mooring winches / windlass
17 September September 2018 Fore manouvering area Manifold area Mooring winches / windlass
12
Canopy Deck overview Deck tanks for gassing up www.mediterraneanav.it
17 September September 2018 overview Deck tanks for gassing up
13
Bridge Navigation Bridge Bridge radio station www.mediterraneanav.it
17 September September 2018 Bridge Navigation Bridge Bridge radio station
14
Crew mess room Smoking room Officer mess room www.mediterraneanav.it
17 September September 2018 Crew mess room Smoking room Officer mess room
15
Accomodations Master bedroom / Master day room /
17 September September 2018 Accomodations Master bedroom / Master day room / Chief engineer bedroom Chief engineer day room
16
Accomodations Officer cabin Double crew cabin www.mediterraneanav.it
17 September September 2018 Accomodations Officer cabin Double crew cabin
17
Cargo control room Engine control room www.mediterraneanav.it
17 September September 2018 Cargo control room Engine control room
18
Pantry Ambulatory - hospital www.mediterraneanav.it
17 September September 2018 Pantry Ambulatory - hospital
19
Engine Room Servo valve power pack generators main engine
17 September September 2018 Engine Room Servo valve power pack generators main engine
20
Workshop Purifiers room Sterring gear room www.mediterraneanav.it
17 September September 2018 Purifiers room Sterring gear room
21
Delivery www.mediterraneanav.it www.mediterraneanav.it
17 September September 2018 Delivery
22
17 September September 2018 Delivery
23
“THE END” MEDITERRANEA di NAVIGAZIONE S.p.A.
Piazza Caduti sul Lavoro n.3 48122 Ravenna Italy 17 September September 2018
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.