Presentation is loading. Please wait.

Presentation is loading. Please wait.

Overview and first analysis of the IC register

Similar presentations


Presentation on theme: "Overview and first analysis of the IC register"— Presentation transcript:

1 Overview and first analysis of the IC register
Peeter Nõges Wouter van de Bund L. Cheimaditida, Greece Photo: E.S. Papastergiadou

2 Final draft IC register
Data downloaded from the server on 15.09 1498 sites from 27 countries (897 R, 379 L, 184 C, 38 T) Overloading of the system towards the end of the submission period IE and LV re-submitted their coastal sites during last week WG 2A meeting, 7-8 Octpber 2004, Ispra

3 Promised vs submitted More than promised
WG 2A meeting, 7-8 Octpber 2004, Ispra

4 OK Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra

5 Sufficient but still less than promised
Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra

6 Announced that do not provide lakes
Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra

7 Promised vs submitted No promises no sites
WG 2A meeting, 7-8 Octpber 2004, Ispra

8 Promised vs submitted No sites received
WG 2A meeting, 7-8 Octpber 2004, Ispra

9 Withdrawn Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra

10 Changes compared with draft IC register
Lakes January 04 September 04 Sites % Countries RO +DK +GR GIGs LEC –LBA Types WG 2A meeting, 7-8 Octpber 2004, Ispra

11 Lake GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra

12 22 countries WG 2A meeting, 7-8 Octpber 2004, Ispra

13 WG 2A meeting, 7-8 Octpber 2004, Ispra

14 WG 2A meeting, 7-8 Octpber 2004, Ispra

15 Compliance with WFD method in lakes
Y N WG 2A meeting, 7-8 Octpber 2004, Ispra

16 H/G and G/M lakes WG 2A meeting, 7-8 Octpber 2004, Ispra

17 Changes compared with draft IC register
Rivers January 04 September 04 Sites % Countries DK +BG GIGs –RBA Types WG 2A meeting, 7-8 Octpber 2004, Ispra

18 River GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra

19 27 countries WG 2A meeting, 7-8 Octpber 2004, Ispra

20 WG 2A meeting, 7-8 Octpber 2004, Ispra

21 WG 2A meeting, 7-8 Octpber 2004, Ispra

22 Compliance with WFD method in rivers
Y N WG 2A meeting, 7-8 Octpber 2004, Ispra

23 H/G and G/M rivers WG 2A meeting, 7-8 Octpber 2004, Ispra

24 Changes compared with draft IC register
Coastal January 04 September 04 Sites % Countries GIGs CBL Types WG 2A meeting, 7-8 Octpber 2004, Ispra

25 Coastal GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra

26 20 countries WG 2A meeting, 7-8 Octpber 2004, Ispra

27 WG 2A meeting, 7-8 Octpber 2004, Ispra

28 Changes compared with draft IC register
Transitional January 04 September 04 Sites % Countries IE +ES +IT +LT +PT GIGs CBA +CBL Types WG 2A meeting, 7-8 Octpber 2004, Ispra

29 9 countries WG 2A meeting, 7-8 Octpber 2004, Ispra

30 WG 2A meeting, 7-8 Octpber 2004, Ispra

31 Problems encountered in the database
Wrong GIGs or types Loch Sgealtair LNO L-A1 Torrente Boite RAL R-M1 Fiumi Albegna RAL R-M3 Fiume Arno RAL R-M3 R. Alaw at Llanfigael RCE R-N1 Torrente Noce-Pejo RME RAL Arnego-ARN1AG RCE R-N3 Lazna Struga REC R-C1 R. Irvine REC R-C4 Fiume Sercio Ripafratta RME R-E3 WG 2A meeting, 7-8 Octpber 2004, Ispra

32 Problems encountered in the database
Coordinates xxxxx,xx Lon & lat mixed up (R-LU, R-LT) 1111,xx R-SE Missing values 0.0 Dummy entries WG 2A meeting, 7-8 Octpber 2004, Ispra

33 Problems encountered in the database
Numeric entries Commas instead of decimal points Additional characters > < % Explanatory text Ranges instead a single value Obviously wrong units (TP) WG 2A meeting, 7-8 Octpber 2004, Ispra

34 Further steps A clean-up of the database will be carried out within next weeks at the JRC Experts will be contacted to solve remaining uncertainties Register will be submitted to Article 21 Committee for approval at their next meeting on 28 October WG 2A meeting, 7-8 Octpber 2004, Ispra

35 Thank you! WG 2A meeting, 7-8 Octpber 2004, Ispra


Download ppt "Overview and first analysis of the IC register"

Similar presentations


Ads by Google