Download presentation
Presentation is loading. Please wait.
1
Overview and first analysis of the IC register
Peeter Nõges Wouter van de Bund L. Cheimaditida, Greece Photo: E.S. Papastergiadou
2
Final draft IC register
Data downloaded from the server on 15.09 1498 sites from 27 countries (897 R, 379 L, 184 C, 38 T) Overloading of the system towards the end of the submission period IE and LV re-submitted their coastal sites during last week WG 2A meeting, 7-8 Octpber 2004, Ispra
3
Promised vs submitted More than promised
WG 2A meeting, 7-8 Octpber 2004, Ispra
4
OK Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra
5
Sufficient but still less than promised
Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra
6
Announced that do not provide lakes
Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra
7
Promised vs submitted No promises no sites
WG 2A meeting, 7-8 Octpber 2004, Ispra
8
Promised vs submitted No sites received
WG 2A meeting, 7-8 Octpber 2004, Ispra
9
Withdrawn Promised vs submitted WG 2A meeting, 7-8 Octpber 2004, Ispra
10
Changes compared with draft IC register
Lakes January 04 September 04 Sites % Countries RO +DK +GR GIGs LEC –LBA Types WG 2A meeting, 7-8 Octpber 2004, Ispra
11
Lake GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra
12
22 countries WG 2A meeting, 7-8 Octpber 2004, Ispra
13
WG 2A meeting, 7-8 Octpber 2004, Ispra
14
WG 2A meeting, 7-8 Octpber 2004, Ispra
15
Compliance with WFD method in lakes
Y N WG 2A meeting, 7-8 Octpber 2004, Ispra
16
H/G and G/M lakes WG 2A meeting, 7-8 Octpber 2004, Ispra
17
Changes compared with draft IC register
Rivers January 04 September 04 Sites % Countries DK +BG GIGs –RBA Types WG 2A meeting, 7-8 Octpber 2004, Ispra
18
River GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra
19
27 countries WG 2A meeting, 7-8 Octpber 2004, Ispra
20
WG 2A meeting, 7-8 Octpber 2004, Ispra
21
WG 2A meeting, 7-8 Octpber 2004, Ispra
22
Compliance with WFD method in rivers
Y N WG 2A meeting, 7-8 Octpber 2004, Ispra
23
H/G and G/M rivers WG 2A meeting, 7-8 Octpber 2004, Ispra
24
Changes compared with draft IC register
Coastal January 04 September 04 Sites % Countries GIGs CBL Types WG 2A meeting, 7-8 Octpber 2004, Ispra
25
Coastal GIGs WG 2A meeting, 7-8 Octpber 2004, Ispra
26
20 countries WG 2A meeting, 7-8 Octpber 2004, Ispra
27
WG 2A meeting, 7-8 Octpber 2004, Ispra
28
Changes compared with draft IC register
Transitional January 04 September 04 Sites % Countries IE +ES +IT +LT +PT GIGs CBA +CBL Types WG 2A meeting, 7-8 Octpber 2004, Ispra
29
9 countries WG 2A meeting, 7-8 Octpber 2004, Ispra
30
WG 2A meeting, 7-8 Octpber 2004, Ispra
31
Problems encountered in the database
Wrong GIGs or types Loch Sgealtair LNO L-A1 Torrente Boite RAL R-M1 Fiumi Albegna RAL R-M3 Fiume Arno RAL R-M3 R. Alaw at Llanfigael RCE R-N1 Torrente Noce-Pejo RME RAL Arnego-ARN1AG RCE R-N3 Lazna Struga REC R-C1 R. Irvine REC R-C4 Fiume Sercio Ripafratta RME R-E3 WG 2A meeting, 7-8 Octpber 2004, Ispra
32
Problems encountered in the database
Coordinates xxxxx,xx Lon & lat mixed up (R-LU, R-LT) 1111,xx R-SE Missing values 0.0 Dummy entries WG 2A meeting, 7-8 Octpber 2004, Ispra
33
Problems encountered in the database
Numeric entries Commas instead of decimal points Additional characters > < % Explanatory text Ranges instead a single value Obviously wrong units (TP) WG 2A meeting, 7-8 Octpber 2004, Ispra
34
Further steps A clean-up of the database will be carried out within next weeks at the JRC Experts will be contacted to solve remaining uncertainties Register will be submitted to Article 21 Committee for approval at their next meeting on 28 October WG 2A meeting, 7-8 Octpber 2004, Ispra
35
Thank you! WG 2A meeting, 7-8 Octpber 2004, Ispra
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.