Presentation is loading. Please wait.

Presentation is loading. Please wait.

USDG Performance 2011/12 Proposal 2012/13 Parliament Portfolio Committee presentation 8 August 2012.

Similar presentations


Presentation on theme: "USDG Performance 2011/12 Proposal 2012/13 Parliament Portfolio Committee presentation 8 August 2012."— Presentation transcript:

1 USDG Performance 2011/12 Proposal 2012/13 Parliament Portfolio Committee presentation
8 August 2012

2 Status Quo Outline Strategy Outline

3 Sprinfield & North Coast Rd
Spatial Landscape Primary Employment Areas Verulam Phoenix Industrial CBD & Harbour South Durban Basin Pinetown Hammarsdale Cato Ridge / Harrison Flats Tongaat New Germany Sprinfield & North Coast Rd N3 N2 Informal Dwellings Rural Dwellings 3

4

5 Spatial Landscape: What strategy?
Housing & full package of services Coverage Existing Backlog (Households) as at 30 June 2011 Timeframe to address based on current funding/ delivery levels Housing 58% 40 to 80 years ( pa) Basic Service Coverage Existing Backlog (Households) as at 30 June 2011 Timeframe to address based on current funding/ delivery levels Water 92% 74 000 37 years (2000pa) Sanitation 75% 13 to 25 years ( pa) Electricity 65% 40 years (8000pa) Solid Waste 0 % 0 years Roads _ 1 138km’s 66years (17km pa) Subsidised hsg programme not sufficient + too much spend Servicing informal settlements: provide services to 5 hh for each house built 5

6 Development Agenda - Key
...service informal settlements as quickly as possible ...use well located land for higher intensity use …intensification of Nodes/Urban Centres and Corridor Segments: mixed use, higher density (viable PT, LED, better QoL) …efficient PT between main Sending & Attracting Nodes (major formal employment fixed) …promote regional integration where warranted (esp the 4 key rural nodes thru surfacing PT routes & providing social facilities) …Switch to IT networks to reduce need for physical movement Promote social integration thru mixed use & income projects In long term aim to make ‘walkable’ or short hop’ communities where bulk of needs can be met. Even aim for self sustainability from employment perspective.

7 Metro Spatial Agenda: P T
Primary Employment Areas Verulam Phoenix Industrial CBD & Harbour South Durban Basin Pinetown Hammarsdale Cato Ridge / Harrison Flats Tongaat New Germany Sprinfield & North Coast Rd N3 N2 Informal Dwellings Rural Dwellings IRPTN 7

8 Metro Spatial Agenda Focusing devt (in particular higher density devt) in town centres. Gap & affordable hsg & Rental

9 Metro Spatial Agenda Use connectivity to overcome fragmentation.
To achieve required densities –Focus first on areas where base for sustainability in place

10 USDG Spend

11 USDG Spend Summary

12 Densification Top-Up KwaMashu Pinetown South CBD Mpumalanga Inanda
Umkomaas Tongaat Umlazi KwaXimba

13 Sites Serviced to Muni Standard

14 Strategic Land Acquisitions
KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas Tongaat Umlazi KwaXimba

15 Ablution Blocks KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas
Tongaat Umlazi KwaXimba

16 Interim Services KwaMashu Pinetown South CBD Mpumalanga Inanda
Umkomaas Tongaat Umlazi KwaXimba

17 Zone Plans KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas
Tongaat Umlazi KwaXimba

18 Major Bulk Infrastructure

19 Major Bulk Infrastructure
KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas Tongaat Umlazi KwaXimba

20 Minor Bulk Infrastructure

21 Minor Bulk Infrastructure

22 Minor Bulk Infrastructure
KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas Tongaat Umlazi KwaXimba

23 USDG Budget

24 USDG Budget Summary

25 Densification Top-Up KwaMashu Pinetown South CBD Mpumalanga Inanda
Umkomaas Tongaat Umlazi KwaXimba

26 Sites Serviced to Muni Standard
KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas Tongaat Umlazi KwaXimba

27 Land Search Areas at Key Stations
Fom North to South… Tongaat Verulam Ottowa Bridge City Thembalihle KwaMashu Town Centre Pinetown Umgeni Road Berea Road Umlazi KwaMnyandu

28 Ablution Blocks

29 Ablution Blocks KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas
Tongaat Umlazi KwaXimba

30 Interim Services

31 Interim Services

32 Interim Services

33 Interim Services KwaMashu Pinetown South CBD Mpumalanga Inanda
Umkomaas Tongaat Umlazi KwaXimba

34 Zone Plans KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas
Tongaat Umlazi KwaXimba

35 Bulk Infrastructure

36 Major Bulk Infrastructure
KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas Tongaat Umlazi KwaXimba

37 Minor Bulk Infrastructure
KwaMashu Pinetown South CBD Mpumalanga Inanda Umkomaas Tongaat Umlazi KwaXimba

38 End


Download ppt "USDG Performance 2011/12 Proposal 2012/13 Parliament Portfolio Committee presentation 8 August 2012."

Similar presentations


Ads by Google