Presentation is loading. Please wait.

Presentation is loading. Please wait.

berasaskan Balanced Scorecard

Similar presentations


Presentation on theme: "berasaskan Balanced Scorecard"— Presentation transcript:

1 berasaskan Balanced Scorecard
Pelaporan & Penilaian Pencapaian UTM berasaskan Balanced Scorecard Pejabat Timbalan Naib Canselor (Pembangunan) (Tahun 2015)

2 KAI OWNER Timbalan Naib Canselor (Akademik & Antarabangsa)
Timbalan Naib Canselor (Penyelidikan & Inovasi) Timbalan Naib Canselor (Pembangunan) Timbalan Naib Canselor (Hal Ehwal Mahasiswa & Alumni) Pendaftar Bendahari Ketua Pustakawan Canseleri a) Pengarah Kanan, UTM International b) Pengarah, Pejabat Hal Ehwal Korporat c) Pengarah, UTM Technology Entrepreneurship Centre

3 Pencapaian UTM berasaskan Balanced Scorecard (Januari-Disember 2015)*
Pemunya KAI: Pejabat Timbalan Naib Canselor (Pembangunan) *Peratus pencapaian dikira menggunakan sasaran tahunan (Jan-Dis 2015) sebagai denominator. Quarterly reporting = a Biannual reporting = b Annual reporting = c Jumlah keseluruhan KAI = a + b + c Tahap Pencapaian Bilangan KAI Peratusan (%) ≥ 100% 6 55 90% - 99% 1 9 60% - 89% 3 27 < 60% Jumlah KAI Dilaporkan 11 100.00

4 Key Amal Indicators 2015 KAI Owner KEY AMAL INDICATOR TARGET 2015
Reporting Status Till Dec TNCP (OCS) S5.1: UI GreenMetric World University Ranking* 95 Annually 117 S5.2: Sistem Penilaian Kampus Rendah Karbon mengikut penilaian Low Carbon Cities Framework (LCCF)* BP2 BP3 TNCP (CICT) L2.3: Peratusan pencapaian piawaian ICT* 94% 90% L3.1: Peratusan Indeks Kepuasan terhadap Persekitaran Kerja 95% 68.7% TNCP (CCIN) S7.1: Bilangan projek komuniti berimpak tinggi 30 Quarterly 91

5 Key Amal Indicators 2015 KAI Owner KEY AMAL INDICATOR TARGET 2015
Reporting Status Till Dec TNCP (CCIN) P4.1: Bilangan projek baharu berasaskan industri* 30 Quarterly 37 P4.2: Jumlah geran/dana yang diterima untuk Projek Libat Sama Komuniti (CBPR) 2.5 juta 2.50 juta Pej. Bendahari & Pej. TNCP F 2.1 Pendapatan dalaman yang dijana daripada program/aktiviti berasaskan perkhidmatan akademik* RM145 juta juta Pej. TNCP & Unit Endowmen F 2.2 Endowmen (kumulatif) RM80 juta 85.40 juta F 2.3 Sumbangan entiti perniagaan* RM3 juta Annually RM 0.05 juta Pej. TNCP & Pej. Bendahari F 3.1 Pendapatan yang dijana daripada aktiviti unlocking of assets* RM20 juta 32.32 juta *KAI baharu bagi tahun 2015

6 Pencapaian UTM berasaskan Balanced Scorecard (Januari-Disember 2015)
Pejabat Timbalan Naib Canselor (Pembangunan) & OCS Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis 2015 (b) Peratusan Pencapaian (%) (b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 1. S5.1 UI GreenMetric World University Ranking* 86 95 117 81.20% Pemberitahuan oleh pihak urusetia yang hanya memaklumkan pengumpulan data dan mengemaskini data melalui lawan web urusetia. ( Terdapat sub-kriteria baru yang diwujudkan oleh pihak urusetia UI Greenmetric 2015 dan UTMCS telah mengenalpasti PTJ yang mempunyai maklumat berkenaan data tersebut. [Smart Building Programme, Total of carbon footprint, water recycling and Water Efficient programme, Average passengers of each campus bus, The approximate travel distance of a vehicle each day inside campus only ( in kilometers)] Kaedah pengumpulan data dari PTJ memerlukan follow-up beberapa kali sama ada melalui ataupun telefon. Pihak UTMCS telah memohon pihak urusetia membuat makluman secara rasmi melalui kepada pihak universiti tentang pengisian UI GreenMetric pada masa akan datang. Mengenalpasti inisiatif yang dilaksanakan di peringkat PTJ agar mendapat data yang lebih terperinci. Seperti contoh, pihak Pejabat HEMA melaksanakan inisiatif lestari di kolej kediaman dan pelaksanaan Green Data Centre oleh pihak CICT sebagaimana yang dicadangkan oleh MAMPU. Kerjasama yang diberikan oleh PTJ agar dapat memberi maklumbalas dengan segera tentang pengumpulan data-data tersebut.

7 UI Greenmetric Ranking

8 UTM’s Ranking Performance in UI Greenmetric 2013-2015
Categories UIGM Total Points 2013 2014 2015 Setting & Infrastructure 1500 649 718 769 Transportation 2100 962 1325 753 Education 507 652 Water 1800 750 600 390 Energy and Climate Change 1360 1025 Waste 1425 1575 Overall Ranking 99 86 117 *Universitas Indonesia Green Metric

9 Pencapaian UTM berasaskan Balanced Scorecard (Januari-Disember 2015)
Pejabat Timbalan Naib Canselor (Pembangunan) & OCS Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis 2015 (b) Peratusan Pencapaian (%) (b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 2. S5.2 Sistem Penilaian Kampus Rendah Karbon mengikut penilaian Low Carbon Cities Framework (LCCF)* BP1 BP 2 BP 3 150% Proses pengiraan Sistem Penilaian Kampus Rendah Karbon yang menggunakan sistem LCCF memerlukan data yang komprehensif. Kerjasama dari PTJ berkaitan pengumpulan data diterima terlalu lama sebelum dapat dihantar ke urusetia MGTC untuk proses penggredan Pengumpulan data akan dilaksanakan mengikut suku tahun agar data yang diterima dapat dihantar ke urusetia MGTC.

10 S5.2 Sistem Penilaian Kampus Rendah Karbon mengikut penilaian Low Carbon Cities Framework (LCCF)

11 Pencapaian UTM berasaskan Balanced Scorecard (Januari-Disember 2015)
Pejabat Timbalan Naib Canselor (Pembangunan) & CICT Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis 2015 (b) Peratusan Pencapaian (%) (b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 3. L 2.3 Peratusan Pencapian piawaian ICT - 94% 90% 95.74% -Kekurangan bajet selenggara peralatan komputer -Masalah bekalan peralatan ICT -Kekerapan bekalan elektrik UTM terputus. Pemantauan keperluan janakuasa elektrik (genset) untuk memastikan kesinambungan perkhidmatan IT di pusat data UTM. -Perkhidmatan CICT yang melibatkan pihak ketiga seperti YES WiFi di kolej kediaman -Bajet ICT diberi keutamaan untuk memastikan perkhidmatan ICT tidak terganggu -Pemantauan berterusan dan efektif -Kajian semula keberkesanan perkhidmatan yang ditawarkan oleh pihak YES dan cadangan penyelesaian jangka panjang

12 L2.3 Peratusan Pencapian Piawaian ICT Tahun 2015
Purata Keseluruhan 90% Security Incident (98%) Availability (99%) Customer Satisfaction (85%) Support Service - Penyelesaian dari ADU-IT (85%)

13 Pencapaian UTM berasaskan Balanced Scorecard (Januari-Disember 2015)
Pejabat Timbalan Naib Canselor (Pembangunan) & PHB Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis 2015 (b) Peratusan Pencapaian (%) (b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 4. L 3.1 Peratusan Indeks Kepuasan terhadap Persekitaran Kerja 71 95% 68.7% 72.3% Kajian Kampus Kondusif dilakukan secara manual dengan mengedarkan set soalselidik kepada PTJ dan pihak PTJ perlu mengedarkan semula kepada staf akademik dan staf bukan akademik. Soalselidik Kampus Kondusif (Pelajar) yang kurang mendapat maklumbalas. Set soalselidik akan dilaksanakan secara atas talian pada masa akan datang. Soalselidik akan diagihkan melalui pensyarah agar pelajar dapat mengisi set soalselidik Kampus Kondusif (Pelajar) bagi memudahkan pengumpulan set kajian tersebut.

14 THE CONDUCIVE LEVEL AT UTM JOHOR BAHRU CAMPUS
Main Factor Value Level of Conducive Level of Conducive Factor 1 : Ecosystem Environment in Campus 0.682 Moderately Conducive Factor 2 : Food & Beverage Outlets 0.699 Factor 3 : Indoor Environment for Class & Office. 0.611 Factor 4 : Transportation Facility in Campus 0.636 Factor 5 : Environment of External Building 0.731 Factor 6 : Sport Facility 0.764 Level of Conducive (Percentage) 0.687 (68.7%) Conducive Achievement 2015 (Based on Percentage of Balanced Scorecard Achievement University) 72.13% - Table 1: The level of conduciveness Pearson Correlation Coefficient (ρ) Pearson Category Swiscow criteria (1997) Level of Conduciveness 0 – 0.39 Weak Weak correlation Not Conducive 0.40 – 0.59 Moderate Moderate correlation Less Conducive 0.60 – 0.79 Strong Strong correlation Moderate Conducive 0.80 – 1.0 Very Strong Very Strong correlation Conducive

15 Pencapaian UTM berasaskan BSC (Januari – Disember 2015)
PTJ Pejabat Timbalan Naib Canselor (Pembangunan) & CCIN Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis 2015 (b) Peratusan Pencapaian (%) (c = b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 5. S7.1 Bilangan projek komuniti berimpak tinggi 21 30 91 303.3% No current utilisation of CE Impact rating established across stakeholders and type of programme Poor identification of CBPR projects across generic research based projects Poor understanding and drive for embedded teaching and learning CE to all faculties Lack of sustainable CE projects implemented for Johor Poor strategic and sustainably planned o stakeholder engagement with local authorities Establish CE impact rating with respective stakeholders Clear dissemination and knowledge understanding of CBPR projects Embedding CE projects across CBPR, teaching and Learning and Outreach across the newly proposed Johor Strategic Management Centre Conduct more strategic level stakeholder engagement across Local Authorities.

16 University & Community 2015
91 Community Engagement Projects 36 CBPR Projects RM2.5mil Fund received for CE programmes 33 Community Outreach programmes 22 Service Learning projects

17 Pencapaian UTM berasaskan BSC (Januari – Disember 2015)
PTJ Pejabat Timbalan Naib Canselor (Pembangunan) & CCIN Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis 2015 (b) Peratusan Pencapaian (%) (c = b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 6. P4.1 Bilangan projek baharu berasaskan industri* - 30 37 123.3% 1. Non available marketing kits across economic clusters 2. Lack of ICOE entrance across economic clusters 3. Synergized engagement across economic clusters HEK to develop marketing kits across economic clusters comprising of RA expertise Industry-based strategic engagement to increase IL across research, teaching and learning and outreach via prioritized economic clusters Energizing AICC cluster engagement with anchor companies ICOEs

18 P 4.1 Bilangan Projek Baharu Berasaskan Industri (Januari-Dis 2015)
No. Fakulti/COE Project title Industry partner 1 Ibnu Sina Institute for Scientific & Industrial Research Modelling and Optimization of Product Related to Clay for Cleansing Method in Islam MIFF Marketing (M) Sdn. Bhd 2 Fakulti Kejuruteraan Kimia Modelling and Optimization of Product Design of Off Grid Decentralised Power Generation Using Biogas from Palm Oil Mill Effluent (POME) Green & Smart Sdn. Bhd 3 Infrared Technology for Detecting VOC by Ganoderma Bionense Agri Diagnostic Sdn. Bhd 4 Fakulti Kejuruteraan Elektrik Diagnostic Tool for Sophisticated Thermal Camera Reliacraft Engineering Sdn Bhd 5 Quality Control for Bull Semen Putra Al Mawashi Genetics Sdn Bhd 6 Institut Pembangunan Bioproduk Production and Optimisation of Palm Kernel Shell (PKS) as Biocharcoal Bio Arang Resources Sdn Bhd 7 Fakulti Komputeran Blueprint sistem bersepadu agihan zakat MAIM (Majlis Agama Islam Melaka) dan perundingan aplikasi MyAsnaf Gates IT Solution Sdn. Bhd. 8 UTM Razak School Perkhidmatan menjalankan kerja pemetaan teresstrial laser scanning (TLS) di terowong ppergau, Setesen Janakuasa Pergau, Jeli Kelantan TNB Research Sdn. BHD

19 P 4.1 Bilangan Projek Baharu Berasaskan Industri (Januari-Dis 2015) samb…
No. Fakulti/COE Project title Industry partner 9 FGHT Pengukuran titik kontrol dan RTK detail untuk projek bekalan air luar bandar ulu layar, betong Sarawak Saland Survey Services Perkhidmatan Ukur Saland Kuching Sarawak 10 FKA Soil investigation works for proposed site at Sedeli Kechil Aneka Alunan Sdn. Bhd. 11 AIS Basic Security Training Mega MHS Holdings Sdn. Bhd. 12 FKK Conducting waste characteristics Study at Bali Denpasar, Indonesia JFE Engineering Corporation, Singapore 13 Production of Rubber-based Dampers for Construction Industry in Malaysia Doshin Rubber Products (M) Sdn. Bhd. 14 NatureKiss Nature Kiss Sdn Bhd 15 IBD Commercialization of rejuvenating products based on VCO, Mas Cotek, Kacip Fatimah Phyto Biznet Sdn. Bhd. 16 Building Automation System at Wisma TV Angkasapuri STT Technologies Sdn Bhd 17 UTSB PLUS Menora-Meru Tunnel (SCADA) & Energy Management SystemPhase 2 Teras Technology Sdn Bhd (a subsidiary company of PLUS) 18 (Enhancement Of Biogas Production And Utilization Of Bioxcell) Malaysian Bio-Xcell Sdn Bhd 19 Enhance Pusat Darah Negara Capabilities Using Online Database And Mobile Applications) Pusat Darah Negara 20 (Kaedah Pendekatan Pendidikan Holistik Dalam Pengajaran Dan Latihan Kemahiran Di Jabatan Penjara Malaysia Jabatan Penjara Malaysia 21 Pembangunan Kolej Kediaman pelajar di Hab Pendidikan Tinggi Pagoh Tunas Selatan contruction sdn. Bhd

20 P 4.1 Bilangan Projek Baharu Berasaskan Industri (Januari-Dis 2015) samb…
No. Fakulti/COE Project title Industry partner 22 IBD Kerjasama dalam bidang penyelidikan dalam membangun dan dan memproses bahan asas bagi membuat baja organik All Cosmos Industries Sdn Bhd 23 RMC Penyelidikan bertajuk 'New Method development for cappilary electrophoresis in environmental monitoring' Allied Chemists Laboratory Sdn Bhd 24 Penyelidikan bertajuk 'pre-clinical studies of synacinn polyherbs as diabetes herbal supplement ' Proliv Life Sciences Sdn Bhd 25 WCC / FKE Frequency Front -End System For Wireless Local Area Network ,Point To Point Link TECHCARE INNOVATION SDN. BHD. 26 FKK / IPASA A Microwave Irradiation Method For Producing Polyethersulfone Membrane MEMPEC PLT 27 FKK / Prospect 1. Optimal Heat-Software for the Rapid and Efficient Automation of Heat Recovery in Process Plants 2. Optimal Water-Software for Maximum Water and Energy Reductions in Industrial and Urban Buildings 3.Optimal Audit-A Software for Energy, Wastewater and Gas Emission Audit and Analysis OPTIMAL SYSTEMS ENGINEERING SDN. BHD. 28 FKM joint research, joint publications, teaching and training, students and staff attachment, consultation projects, turbocharger design and application other related fields in future Advance Turbo Sdn Bhd 29 R&D&C halal cleaning and sanitary products MIFF Marketing (M) Sdn Bhd 30 FBB Kerjasama bertujuan penyelidikan, perkongsian pengalaman, pengetahuan dan membangunkan dalam bidang makanan kesihatan berasaskan herba dan homeopati Farmina Bio Plus Industries and Consultants Sdn Bhd

21 P 4.1 Bilangan Projek Baharu Berasaskan Industri (Januari-Dis 2015) samb…
No. Fakulti/COE Project title Industry partner 31. FKE Enhancement of signal parameters estimation for RF power sensors in the presence of 1/f noise Collaboration Research in Engineering, Science & Technology Centre (CREST) & Keysight Technologies Microwave Products (M) Sdn Bhd 32. Evaluating the Potential use of Accident Sludge (SW204) IFFCO (Malaysia) Sdn Bhd 33.  FKK Pre-clinical Studies of Synacinn Polyherb as Diabetes Herbal Supplement Proliv Life Sciences Sdn Bhd 34. Rural Electrification using POME Biogas as Renewable Resource Green & Smart Sdn Bhd 35. FKK Ship Emissions Analysis at Pasir Gudang Port Lembaga Pelabuhan Johor, Pasir Gudang 36. Ship Emissions Analysis at Tanjong Pelepas Lembaga Pelabuhan Johor, Tg. Pelepas 37. FKM Air Traffic Management System in Malaysia Advanced Air Traffic Systems (M) Sdn Bhd

22 Pencapaian UTM berasaskan BSC (Januari –Disember 2015)
PTJ Pejabat Timbalan Naib Canselor (Pembangunan) & CCIN Bil. Key Amal Indicator Pencapaian 2014 Sasaran Tahun 2015 Sasaran 2015 (a) Pencapaian Jan-Dis 2015 (b) Peratusan Pencapaian (%) (c = b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 7. P4.2 Jumlah geran/dana yang diterima untuk Projek Libat Sama Komuniti RM2.244 juta RM2.5 juta RM 2.50 Juta 100.33% Silo and lack of synergy across CE bidding process Poor local authorities engagement with researchers/academics Strategic engagement across CE clusters Need to strategize to get global CE funds Poor relationship with global CE funders/corporations/grant organisers Lack of strategic CSR engagement with Directors Increase CSR engagement with industry partners which we have current linkages Development of the cluster-based CE engagement council with local authorities for the Skudai Innovation Valley (SIV) Establishment of the CENi (Community Engagement Innovation Network) across SIV Clusters Get in touch with UNESCO, UNICEF, MERCY, IDB for potential global CE projects Conduct CSR engagement and market UTMs Community-based projects with GLCs more rigourously

23 P4.2 Jumlah geran/dana yang diterima untuk Projek Libat Sama Komuniti (Jan- Dis 2015)
 Bil Nama Projek Kos 1 Development of interactive mobile courseware for slow learner children 40,000.00 2 pengajaran Al-Qurankepada pelajar-pelajar kategori masalah pembelajaran melalui ICT 15,000.00 3 Program juruteran bersama masyarakat 4 Pemindahan teknologi kertas nenas (pinapaper) 50,000.00 5 Penyelidikan RTC 6 Duta Universiti 150,000.00 7 RTC - MesHELP 29,000.00 8 HEWM 200,000.00 9 Penghasilan baja dan makanan haiwan melalui pengurusan sisa kanji 34,000.00 10 Transformasi kediaman flat menjadi persekitaran kediaman kondusif melalui penglibatan komuniti 35,000.00 11 Projek penanaman pokok Tin menggunakan kaedah sistem fertigasi 12 We Are Family 500.00 13 SPE-UTM SC International Charity to Philippines 14 SPE UTM Charity Month [UTM Top Bidder 2015] 15 Sehati Sejiwa : Bebaskan Mimpimu Warnai Jiwamu 200.00 16 Lambaian Di Bawah Bayu [UTM Top Bidder 2015] 4,000.00 17 Hidup Penuh Erti [UTM Top Bidder 2015] 1,000.00 18 Serve Love Care With Us 2015 (SeLcUs'15) 19 Khidmat Masyarakat Perkampungan Orang Asli 2014 (KIMPOS'14) 3,000.00 20 The Conquerance : Future of Women in Engineering Field 21 Malaysia Anti Corruption Social Responsibility (MACSR) 2,000.00 22 Jalinan Kasih Bersama Anak Autism 300.00 23 COMMITTEE HUNTER PROGRAM 24 NANGAN TERINDAH KASIH TERCIPTA 25 BAKTI SISWA

24 P4.2 Jumlah geran/dana yang diterima untuk Projek Libat Sama Komuniti (Jan- Dis 2015) samb...
 Bil. Nama Projek Kos 26 Bakti Amal 2015 200.00 27 A COMMUNITY-BASED STUDY ON THE EFFECTIVENESS OF FLOOD EMERGENCY WARNING SYSTEM IN MALAYSIA 46,200.00 28 DESIGN OF AFFORDABLE HOUSE SYSTEM FOR DISASTER AFFECTED AREA AND FOR GENERAL COMMUNITY. 65,000.00 29 Modelling and Optimization of Product Related to Clay for Cleansing Method in Islam 30,000.00 Misi Bantuan Pasca Banjir I 5,000.00 30 Misi Bantuan Pasca Banjir II 31 International Forum on Political and Economic Trend in South East Europe 10,000.00 32 Hapuskan Denggi - Gotong Royong I 2,000.00 33 Hapuskan Denggi - Gotong Royong II 1,500.00 34 Community - CEBA'15 39,826.00 35 A Day with SMILE 36 Ihya Ramadhan 5,310.27 - Sahur Perdana - Buka Perdana - Qiamulai - Bersamamu (Gelandangan) - Agihan Bubur Lambuk 37 e-Marketing 31,250.20 38 Community 40,651.00 39 Warung Halal - Komuniti bersama Selebriti 40 Hapuskan Denggi - Gotong Royong III 2,500.00

25 P4.2 Jumlah geran/dana yang diterima untuk Projek Libat Sama Komuniti (Jan- Dis 2015) samb...
 Bil. Nama Projek Kos 41 FIESTA'15 26,880.90 - Derma Darah & Pemeriksaan Kesihatan - Summer Camp (Anak Yatim) - Pameran POLIS, JPAM, IJN - Sukan bersama Komuniti & Mahasiswa - Jualan Gerai - Forum PERDANA 42 Program Khidmat Masyarakat Pej. Pendaftar 10,000.00 43 Community Transformation Through Social Entrepreneurship 11,440.00 44 Enhance Pusat Darah Negara Capabilities Using Online Database And Mobile Applications - Pusat Darah Negara 126,000.00 45 Kaedah Pendekatan Pendidikan Holistik Dalam Pengajaran dan Latihan Kemahiran Di Jabatan Penjara Malaysia - Jabatan Penjara Malaysia 82,000.00 46 Enhancement Of Biogas Production And Utilization Of Bioxcell (Nusajaya) 197,000.00 47 Projek Komuniti di Kemboja 30,000.00 48 Projek Sungai Bunus Education Centre - River of Life Public Outreach Programme 884.00 49 Pembangunan Pusat Tapak Baja Kompos 117,000.00 50 Production of Rubber-based Dampers for Construction Industry in Malaysia 153,000.00

26 P4.2 Jumlah geran/dana yang diterima untuk Projek Libat Sama Komuniti (Jan- Dis 2015) samb...
 Bil. Nama Projek Kos 51 Projek Rintis Pendidikan, Pengurusan & Transformasi Sisa Organik Taman Hutan Bandar 5,000.00 52 Program Khidmat Pendidikan 1 Malaysia 1,000.00 53 Program Khidmat Komuniti "Hidup Penuh Erti' 3,000.00 54 Lawatan Sambil Belajar & Khidmat Komuniti 2,350.00 55 Program Khidmat Komuniti 492.00 56 Program Eksplorasi Kepimpinan 57 Program Sejambak Kasih Semurni Insan 3,500.00 58 Aktiviti Riadah Dan BBQ Seksyen 3 200.00 59 Program Sehari Bersama Pegawai Perlihitan 2,565.00 60 Aktiviti Lawatan Pembelajaran Berinteraksi Seni Warisan 61 Program Mahasiswa Bersama Masyarakat 1.0 62 Program Jelajah Komuniti 6,000.00 63 Program Budi Penyayang UTM-Calvary Challenge Home 1,800.00 64 Program Latihan Ujian Praktikal & Khidmat Masyarakat 65 Program Bersama Komuniti Warga Emas 66 Program Perkhidmatan Kelab Suka Belajar (Aktiviti Pendidikan) 2,500.00 67 Program "We Love Community" 68 Pembangunan laman web inisiatif kerjasama universiti 30,000.00 69 Pembekalan sistem rawatan air mudah alih osmosis balikan bagi mangsa banjir 100,000.00

27 P4.2 Jumlah geran/dana yang diterima untuk Projek Libat Sama Komuniti (Jan- Dis 2015) samb...
 Bil. Nama Projek Kos 70 Membina Asas Matematik Murid Berkeperluan Khas Dengan Kit Pembelajaran Numicon 509,000 71 Mudah Membaca Bagi Kanak-Kanak Disleksia Dengan Menggunakan Buku E dan Ko Qr 72 Aplikasi Membaca Mudah Alih Untuk Kanak-Kanak Down Sindrom di Persatuan Sindrom Down Syndrome KL 73 Pembangunan Kelestarian Kesihatan dan Kecergasan Pusat Jagaan Orang Tua Nur Hasanah, Beranang, Selangor 74 Membangunkan Mikro Turbin Banki Secara Lestari Bagi Mempertingkatkan Taraf Hidup Serta Eko-Pelancongan di Kg. Sungai Tiang, Taman Negeri Royal Belum 75 Water Supply For Underprivileged Community in Endau, Johor 76 Kelestarian Transformasi Pembangunan Sosio-Ekonomi Penduduk Kg. Sg. Tiang, Hutan Royal Belum 77 Program Penghasilan Pengisi (Filler) Daripada Sekan dan Jerami Padi di Kampung Semaloi, Endau, Mersing, Johor 78 Pembangunan Semula Persekitaran SMK Dabong, Kuala Krai, Kelantan Melalui Pendekatan Penglibatan Komuniti 79 Penubuhan Skuad Asatizah Muda dari Kalangan Kanak-Kanak Jalanan Kg. Periok – Chow Kit untuk Komuniti Anak-Anak Istimewa 80 Membaik Pulih Projek Sistem Penuaian Air Hujan, Kg. Air Papan, Mersing, Johor 81 Projek transformasi komuniti melalui keusahawanan sosial 9,000 82 83 Projek baja dan composting 10,000 84 Ekspedisi saintifik Kundasang Kesedaran bencana 60,000 JUMLAH KESELURUHAN 2,508,349.37

28 Pencapaian UTM berasaskan Balanced Scorecard (Januari-Disember 2015)
PTJ Pejabat Timbalan Naib Canselor (Pembangunan) & Bendahari . Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis 2015 (b) Peratusan Pencapaian (%) (c = b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 8. F 2.1 Pendapatan dalaman yang dijana daripada program/aktiviti berasaskan perkhidmatan akademik* juta 145 juta juta 73.4% -Pengurangan mahasiswa undergraduate -Kutipan yuran berdasarkan garis panduan KPM dan kelulusan universiti. -Seminar dan program yang dilaksanakan tidak menyeluruh dari setiap fakulti. Sasaran dipantau rapi melalui jawatankuasa Financial Sustainablity.

29 RINGKASAN PENDAPATAN BERASASKAN AKADEMIK JAN – DIS 2015
KAI Detail Sodo Bajet NOV 2015 F 2.1 1 Fees UG & PG (H / H89003) Yuran Pelajaran H72004 U (Mengurus) 54,966,979.37 Yuran Pendaftaran H72005 207,771.34 Yuran Pengajian Sem 3 H72007 820,629.96 Yuran Perkhidmatan H72008 8,249,792.51 Yuran Seminar/Kursus H89003 1,650.95 2 Courses & Workshop - gross A (Amanah) 2,138,700.69 3 Seminar & Conferences 2,117,851.66 4 Consultancy COE 5,395,508.74 5 Lab Services Fees 1,235,079.61 Hasil Pengujian H89005 1,162,854.11 7 Sumbangan UTM AIS E14081 451,993.00 8 Sumbangan UTM Razak School E14082 1,685,853.14 9 Sumbangan UTM IBS E14083 1,929,570.96 10 Peruntukan Program H89006 26,054,251.18 15,000.00 JUMLAH KESELURUHAN 106,433,487.22

30 Pencapaian UTM berasaskan BSC (Jan - Disember 2015)
PTJ Pejabat Timbalan Naib Canselor (Pembangunan) & Unit Endowmen Bil. Key Amal Indicator Pencapaian 2014 Sasaran Tahun 2015 Sasaran Jan - Dis (a) Pencapaian Jan - Dis (b) Peratusan Pencapaian (%) (c = b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 9. F2.2 Endowmen (Kumulatif) RM 49 juta RM 80 juta 80 juta 85.40 juta 106.75% Tiada dana untuk menjalankan aktiviti-aktiviti/ promosi bagi meningkatkan dana endowmen Menubuhkan Tabung Pengurusan Endowmen di mana 10% daripada semua pulangan pelaburan dijadikan sumber kewangan tabung ini.

31 RM 5,000,000 RM 20,471,579 RM 30,000,000 RM 9,463,505 RM 2,270,875

32 F2.2 Endowmen (Kumulatif)

33 F2.2 Endowmen (Kumulatif) samb...

34 Pencapaian UTM berasaskan Balanced Scorecard (Januari-Disember 2015)
Pejabat Timbalan Naib Canselor (Pembangunan) & Bendahari Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis (b) Peratusan Pencapaian (%) (b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 10. F 2.3 Sumbangan entiti perniagaan 0.46 juta 3 juta 0.05 juta 1.6% Sumbangan adalah berdasarkan prestasi kewangan tahunan anak syarikat. *Penyumbang yang dinyatakan adalah dari pihak UTSB sebanyak RM 50k Kajian semula tentang perjanjian perkongsian keuntungan antara UTM dan anak syarikat.

35 Pencapaian UTM berasaskan Balanced Scorecard (Januari-Disember 2015)
PTJ Pejabat Timbalan Naib Canselor (Pembangunan) & Bendahari Bil. Key Amal Indicator Pencapaian 2014 Sasaran 2015 (a) Pencapaian Jan-Dis (b) Peratusan Pencapaian (%) (b ÷ a × 100%) Isu Pelaksanaan (Jika Ada) Cadangan Tindakan Pembetulan/ Pencegahan (Jika Berkenaan) 11. F3.1 Pendapatan yang dijana daripada aktiviti unlocking of assets* 30.36 juta 20 juta 32.32 juta 161% Pulangan kewangan keatas pembangunan tanah hanya akan berlaku setelah pembangunan disiapkan dan bermula operasi atau aktiviti perniagaan. Cadangan pembangunan tanah dari pemaju lebeh cenderung kepada penjualan tanah. Perkara berkaitan pentadbiran tanah seperti nilai, status dan syarat guna tanah banyak mempengaruhi Model Bisnes pembangunan tanah dan menyebabkan tempoh masa lama untuk mencapai persetujuan / perjanjian dan mula pembangunan di tapak. Pembangunan tanah yang mempunyai unsur komersil perlu melibatkan PBT serta agensi luar lain dan memerlukan masa untuk kelulusan perancangan dan pembangunan. Proses perancangan dan tawaran atau perundingan pembangunan perlu di cekapkan dan cepatkan. Perundingan kaedah pembangunan atau Model Bisnes perlu dilaksanakan dengan lebih berkesan termasuk persediaan fakta dan maklumat lengkap lebih awal dan melibatkan mereka yang mahir dengan skop pembangunan atau bisnes yang ingin dilaksanakan. Peningkatan kompetensi staf sedia ada dan kerjasama berkesan dengan pakar dalaman serta mengguna khidmat pakar luar atau perunding. Meningkatkan rangkaian dan persefahaman serta sokongan dengan PBT dan semua agensi luar yang berkaitan. Menyediakan Pelan Induk Pembangunan (Fizikal) Kampus. Perlu pastikan ianya bertepatan dan memenuhi keperluan Pelan Strategik Universiti.

36 F3.1 : PENDAPATAN YANG DIJANA DARI AKTIVITI UNLOCKING OF ASSETS
Bil. Hasil Umum Mengurus (RM) Tabung Amanah (RM) 1. Sewaan Kenderaan 162,418.05 26,000.05 2. Sewa Perumahan Universiti 594,221.00 31,461.16 3. Sewa Jangka Panjang (CIMB / AFFIN / SHELL) 61,090.80 44,316.00 4. Sewa Bangunan / Kondominium 30,727.81 3,252,585.36 5. Sewa Tempat Rekreasi 9,553.79 88,473.12 6. Sewa Kemudahan Telekomunikasi 509,593.02 90,246.43 7. Sewa Ruang Iklan 14,314.73 1,156.61 8. Sewa Ladang 128,545.29 - 9. Sewa Dewan dan Bangunan Utama 120,756.89 214,757.28 10. Sewaan Tanah Pajakan 328,301.88 11. Sewa Dewan Kuliah / Makmal 29,664.44 191,926.13 12. Sewa Kolam Renang 16,926.22 13. Yuran Asrama 15,110,938.98 3,829,786.62 14. Jualan Buku 260.00 1,597,796.47 15. Hasil Klinik Mahasiswa 1,101,458.74 1,241,776.47 16. Sewa Arked Pelajar 408,605.23 24,287.13 17. Sewa Kantin Asrama 71,952.80 18. Sewa Ruang Umum 652,956.99 981,819.54 19. Sewa Lain-lain Kemudahan 700,369.81 29,334.93 20. Sewa Dewan Serbaguna dan Kemudahan Sukan 623,400.76 JUMLAH 20,035,730.25 12,286,050.28 JUMLAH KESELURUHAN 32,321,780.53

37 If only……………………

38


Download ppt "berasaskan Balanced Scorecard"

Similar presentations


Ads by Google