Presentation is loading. Please wait.

Presentation is loading. Please wait.

Concrete and Masonry Construction 29 CFR 1926, Subpart Q

Similar presentations


Presentation on theme: "Concrete and Masonry Construction 29 CFR 1926, Subpart Q"— Presentation transcript:

1 Concrete and Masonry Construction 29 CFR 1926, Subpart Q
12/07/16 Concrete and Masonry Construction 29 CFR 1926, Subpart Q

2 General overview of the OSHA regulation
12/07/16 General overview of the OSHA regulation Definitions General requirements Load placement Impalement hazards Post-tensioning operations Concrete buckets Hazards of working with concrete 1a

3 Equipment and Tools Bulk cement storage Concrete mixers
12/07/16 Equipment and Tools Bulk cement storage Lockout/Tagout Concrete mixers Power concrete trowels Concrete buggies 2a

4 Equipment and Tools Concrete pumping systems Tremies Bull floats
12/07/16 Equipment and Tools Concrete pumping systems Tremies Bull floats Masonry Saws 2b

5 Cast-in-place concrete requirements
12/07/16 Cast-in-place concrete requirements General requirements for formwork Support without failure Drawings and plans 3a

6 Cast-in-place concrete requirements
12/07/16 Cast-in-place concrete requirements Shoring and reshoring Inspection of equipment Damaged equipment strength requirement Inspection of erected equipment 3b

7 Cast-in-place concrete requirements
12/07/16 Cast-in-place concrete requirements Shoring and reshoring Strength requirements after erection Firm contact and security Eccentric loads Tiered single post shores Reshoring requirements 3c

8 Cast-in-place concrete requirements
12/07/16 Cast-in-place concrete requirements Vertical slip forms Rods and pipes Form design Scaffold work 3d

9 Cast-in-place concrete requirements
12/07/16 Cast-in-place concrete requirements Vertical slip forms Jacks, vertical support, and rated capacity Holding devices Form structure Rate of lift 3e

10 Cast-in-place concrete requirements
12/07/16 Cast-in-place concrete requirements Reinforcing steel Rebar support Rolled wire mesh 3f

11 Cast-in-place concrete requirements
12/07/16 Cast-in-place concrete requirements Formwork removal Conditions for removal Reshoring removal 3g

12 Precast concrete Adequate support Lifting inserts Employee safety 4a
12/07/16 Precast concrete Adequate support Lifting inserts Employee safety 4a

13 Lift-slab Operations Professional design and plan
12/07/16 Lift-slab Operations Professional design and plan Detailed instructions and sketches Lateral stability 5a

14 Lift-slab Operations Jacking equipment Protection of employees
12/07/16 Lift-slab Operations Jacking equipment Load and overload Equipment includes Protection of employees 5b

15 Masonry construction requirements
12/07/16 Masonry construction requirements Limited access zone requirements Dimensions Placement Restricted area Requirements for removing 6a


Download ppt "Concrete and Masonry Construction 29 CFR 1926, Subpart Q"

Similar presentations


Ads by Google