Presentation is loading. Please wait.

Presentation is loading. Please wait.

Preparing for Phase Delivery

Similar presentations


Presentation on theme: "Preparing for Phase Delivery"— Presentation transcript:

1 Preparing for Phase Delivery
©Chronos Technology: COMPANY PROPRIETARY

2 ©Chronos Technology: COMPANY PROPRIETARY
Agenda Preparing for Phase Delivery GNSS fit for PRTC A Network fit for Phase distribution The right Partnerships 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

3 ©Chronos Technology: COMPANY PROPRIETARY
Why prepare for Phase? Phase must be supported… When TDD technology is deployed When some LTE-A services are to be offered Our industry does not expect this to be as trivial as supporting Frequency over PTP proved to be Phase to the edge at 500ns / 1 microsecond is tough If you don’t prepare Delays to the roll out of LTE-A services The network performance requirements not met Customer satisfaction affected 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

4 ©Chronos Technology: COMPANY PROPRIETARY
We can help ….. GPS/GNSS Equipment Design Piloting In-Service Support Futures You prepare existing GPS installations Evaluate new equipment Design the phase delivery network - Network elements / system planning Piloting and dimensioning the network Bring new equipment and services in to operation Support co-existing legacy and modern timing systems 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

5 PhaseReadyTM – It’s a state of mind
Support Audits Installation Source of Time Network Timing Client + […. nS] […. ns] Phase budgets Nano seconds count EVERYWHERE 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

6 Our updated and new solutions
An updated service portfolio of services to help you Identify your state of readiness to support Phase Assess the risks associated with Phase synchronisation Solve the issues in your control before you go live Frequency Ready Services Sync AuditTM (Frequency) For legacy networks Sync MasterclassTM Phase Ready Services Phase Ready ‘Core Audit’ Phase Ready ‘Network Audit’ For 4G / LTE-A networks 2008 Stoop: BT – Mike Gilson Doughnut Stoop ‘08 Today ‘15 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

7 Let’s look at these Phase budgets
Source of Time […. ns] Satellite System Atmosphere or “Space Weather” GPS/GNSS Sub-system Receiver GM 100 ns Timing Client + […. ns] Packet Buffering & Processing Algorithm Precision & Efficiency Oscillator Stability & Holdover <500 ns Network + […. ns] Number of Hops Traffic Engineering Switch Fabric & Buffering Redundancy & Resilience 900 ns Nano seconds count EVERYWHERE 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

8 ©Chronos Technology: COMPANY PROPRIETARY
When it works GPS Phase Max Uncertainty 50ns Phase Master Clock Overall delay budget is maintained. TDD operation and/or COMP, MIMO, eICIC, eMMBS operate as expected Network GPS Phase Error @500ns Max Uncertainty 50ns Phase Error @200ns Master Clock 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

9 When it goes wrong: Core site
GPS Phase 400ns Max Uncertainty 300ns Phase 900ns Master Clock Overall delay budget is NOT maintained at one Core site. TDD operation and/or COMP, MIMO, eICIC, eMMBS will be compromised Network GPS Phase 900ns Max Uncertainty 100ns Phase 400ns Master Clock 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

10 When goes wrong: Network
GPS Phase 400ns Max uncertainty 100ns Phase 900ns Master Clock Overall delay budget is NOT maintained at one part of the network. TDD operation and/or COMP, MIMO, eICIC, eMMBS will be compromised Network GPS Phase 1100ns Max uncertainty 100ns Phase 400ns Master Clock 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

11 When it goes wrong: Core & Network
GPS Phase 400ns Max uncertainty 100ns Phase 900ns Master Clock Overall delay budget is NOT maintained at one part of the network. TDD operation and/or COMP, MIMO, eICIC, eMMBS will be compromised Network GPS Phase 1100ns Max uncertainty 300ns Phase 400ns Master Clock 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

12 When it goes wrong (or does it?): Core & Network
GPS Phase 400ns Max uncertainty 300ns Phase 900ns Master Clock While the two cells are nearly in Phase with each other, will a mobile device talking to other adjacent cell sites perform as expected? Network GPS Phase 1100ns Max uncertainty 100ns Phase 400ns Master Clock 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

13 Phase budget - Core site
[…. ns] […. ns] + […. ns] + Source of Time Timing Client Network Satellite System Atmosphere or “Space Weather” + GPS/GNSS Sub-system […. ns] Receiver (GM) 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

14 PhaseReadyTM “Core Audit”
Suitability of site to become a PRTC Typically 1 day for each full site audit Local health and safety rules can restrict audit scope Service deliverables GPS system time of day delay data Physical assessment of existing GPS system / GM hardware Assessment of collocated GPS systems and their possible impact on Phase deliver Support for updating clock configuration Verification of clock performance Phase Ready ‘Core Audit’ 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

15 + + + Phase budget - Network […. ns] […. ns] […. ns] Source of Timing
Time Timing Client Network Number of Hops Switch Fabric & Buffering + Engineering Induced mis-configuration […. ns] Redundancy & Resilience 3rd Party Backhaul – Many unknowns for the mobile operator 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

16 PhaseReadyTM “Network Audit”
Suitability of network to support require phase budget Each project is scoped individually with you Typical service deliverables Application requirements review Normal operating conditions Under failure conditions Allowances review and testing as required Network allowance Routers, Switches, Boundary Clocks transfer function testing Hop by hops or link by link testing and analysis PTP Slave allowance Transfer function testing Results and recommendations Phase Ready ‘Network Audit’ 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

17 Metrics – which one(s)? One way path delays Sync Performance metrics
For accurate and meaningful metrics, all must be collected with accurate time references (typically GPS/GNSS) GPS TimeError TE/TIE/MTIE/TDEV Path Delay TE PDV FPP, MinTDEV, MAFE PTP GPS 1PPS ToD GM Network OC BC SyncE Freq Confidential – Released under NDA 2014 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

18 Referenced & unreferenced metrics
To compare metrics collected at different points each of those collection points must have the same reference Probes provide; An independent reference An independent view of performance 2-5% of sites equipped with GPS/GNSS referenced SyncWatch or SyncBOX-u units to provide accurate metrics datum GPS NTU/IADs/Cell site aggregators Independent probes provide “control” for un-referenced metrics delivered by NTU/IADs/Cell site aggregators Many IADs / NTUs do not support the addition of a GPS reference input GPS GPS GPS GM GPS 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

19 ©Chronos Technology: COMPANY PROPRIETARY
Sync MasterClassTM Standard public classes 2 day course Customer specific classes Standard 2 day course Tailored 1 and 2 days courses Can be supplemented by practical / hands on training on request Modular course architecture Select modules to select from to match your audience Sync MasterClassTM 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

20 Partnerships ensuring end to end timing excellence
Most networks are multi-vendor technology Sync & timing increasingly supported by the network elements Chronos increasingly partnering with NE vendors To deliver end to end solutions for network operators GPS/GNSS systems, Sync testing & measurement, Sync design & planning, system installation and commissioning Vendor 1 Vendor 2 Vendor 3 Vendor 4 PTP Synchronisation GPS BC GM/BC 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

21 PhaseReadyTM – Get connected
LinkedIn …. Blog … Twitter … 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

22 Summary: Why Chronos? The Mast Graphic To be
29 years in time and timing Delivering to the Telecom, Power and Finance industries New PhaseReadyTM offerings New/strengthened industry partnerships Experienced Deployment and support of entire timing networks for network operators Global experts in industrial grade GNSS/GPS systems Developer of world renowned Sync MasterClassTM Developer of the original Sync AuditTM service Developer of boutique sync equipment SyncPORT, SyncBOX-u, CTL42xx Series Developer of test and measurement tools TimePortTM and SyncWatchTM The Mast Graphic To be placed here? Nano seconds count EVERYWHERE 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

23 ©Chronos Technology: COMPANY PROPRIETARY
Questions 17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY

24 ©Chronos Technology: COMPANY PROPRIETARY
17/09/2018 ©Chronos Technology: COMPANY PROPRIETARY


Download ppt "Preparing for Phase Delivery"

Similar presentations


Ads by Google