Download presentation
Presentation is loading. Please wait.
1
PROJECT PLANNING MEETING
Agenda STATE HIGH PROJECT PLANNING MEETING October 28, 2013 Revised Option 1 Floor Plans Site Plan Revised Option 2 Project Examples Option 1 vs. 2 Characteristics Preliminary LEED Checklist Crabtree, Rohrbaugh & Associates, Architects
2
State High - Option -1 Composite Floor Plan
3
State High - Option -1 Composite Floor Plan Renovation
New Construction Composite Floor Plan
4
State High - Option -1 Potential Potential
5
State High - Option - 2 Composite Floor Plan
6
State High - Option - 2 Renovation New Construction
7
State High - Option -2 Potential Potential
8
Option Characteristics
State High Option - 1 State High Option - 2 Area of Demolition near equal. Area of Renovation near equal. Anticipate Option 2 will be more efficient.
9
Project Commons
10
Large Group Instruction
11
Food Court / Cafe
12
Food Court / Cafe
13
Outdoor Student Spaces
14
State High - Option -1 Concentrates construction to grass area
Impact to play field area Program adjacency distance Building organization Simplified Phasing Larger building area / sf Does not accommodate loop road
15
State High - Option -2 Concentrates construction to parking area
Impact to parking Preferred program adjacency Optimum building organization Comparable Phasing Smaller building area Site circulation achieves connection between North and South, Community Fields Continuous loop road for buses
16
Preliminary LEED Checklist
17
Community Connectivity
18
Questions and Comments
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.