Download presentation
Presentation is loading. Please wait.
1
MACo Winter Conference
Anne Arundel County MACo Winter Conference January 7, 2011
2
Chesapeake Bay TMDL Pollutants of Concern
Nitrogen Phosphorus Sediment
3
TMDL Allocation and Gap Determination
Existing Conditions Without BMP’s Credit for existing BMPs + Retrofits Current Conditions 2009 Progress Gap Required Reduction Pollutant Load Reducible Load Bay TMDL Allocation E3 (Limit of Technology) 2009 2025 3
4
Chesapeake Bay TMDL Allocation
Anne Arundel County Chesapeake Bay TMDL Allocation Total Nitrogen = million lbs/yr Total Phosphorus = million lbs/yr Sediment = TBD
5
Pollutant Source Sectors
Wastewater Treatment Plants (WWTPs) Septic Systems Stormwater Runoff Agriculture
6
Pollutant Source Sector Actors
Actors Where County Assumes Responsibility County WWTPs Privately Owned Septic Systems County Stormwater Runoff Actors Where County Does Not Assume Responsibility Minor Municipal WWTPs Minor Industrial WWTPs Major Industrial WWTPs Fort Meade WWTP Federal Lands – Stormwater Runoff State Lands – Stormwater Runoff City of Annapolis – Stormwater Runoff Agricultural Lands – Stormwater Runoff
7
Anne Arundel County Core Implementation Strategy
(1) WWTPs Upgrading WWTPs to Enhanced Nitrogen Removal Capacity (2) Septic Systems Sanitary Sewer Extensions and Satellite Cluster Systems (3) Stormwater Retrofits Stormwater Outfall Restoration Stormwater Pond Restoration (4) Headwater Stream Erosion Prevention Stream Channel Restoration Ephemeral Channel Restoration
8
Point Source WWTP Participants
County Government WWTPs (≈ $270,000,000) Federal Government WWTPs Private Sector WWTPs
9
Septic System Participants
County Sanitary Sewer Extensions and Satellite Cluster Systems (≈ $800,000,000) Private Sector Septic Systems
10
Stormwater Retrofit Participants
County Government (≈ $400,000,000) State Government Federal Government City Government Agriculture Privately Owned Land
11
Headwater Stream Erosion Prevention Participants
County Government (≈ $400,000,000) State Government Federal Government City Government Agriculture Private Sector
12
Degraded Stream Conditions
12
13
Ultimate Goals Restored Stream Stability
Restored Hydrology within Floodplains and Streams Restored Biological Health of Streams Compliance with Water Quality Standards
14
Step Pool Stormwater Conveyance (SPSC) Restoration Strategy
14
15
What is the Potential Cost to Anne Arundel County?
County WWTPs (≈ $270,000,000) Sanitary Sewer Extensions and Satellite Cluster Systems (≈ $800,000,000) Stormwater Retrofits (≈ $400,000,000) Headwater Stream Erosion Prevention (≈ $400,000,000) TOTAL ESTIMATED COST: $1.87 Billion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.