American Military Engineers
Society of American Military Engineers 8 AUGUST 2013 CAPT Clifford Maurer, P.E., CEC, USN Commanding Officer, NAVFAC Southwest
2
Department of Navy Messages
CHINFO NOTES The Protect/Defend message is important, easy to understand and clearly conveys the basic message about the Navy Communications should consistently convey this basic message Reinforce the message with the “deployed around the world” and “ready to defend America” messages Are easily understood Boost understanding among target audiences Viewed as most important Every activity needs to be filtered through the prism of the Core and Supporting Messages Does it help to clearly communicate the messages? And here’s where we are. As you can see…very simple, straightforward language. Messages that capture what we want Americans to know about the Navy. If you’re asked…whether it’s during a media interview…or during a tour, visit or some other type of engagement, “What’s the Navy up to these days?” …these messages communicate what we want people to know and remember. You also need to know that – with Gallup’s helps - we tested them and made some tweaks/changes. For example, we had a message that said, “The Navy Fights and Wins America’s Wars at Sea.” The feedback we received was that 1) It wasn’t current….”I’m pretty sure the last battle the Navy had at sea was 80 years ago in WWII” was the exact language….”It sounds archaic” or “a bit 1945ish”…were other comments, and 2) Many didn’t like the reference to war. In the “Be Ready” message we initially had…”The Navy is ready to defend America anytime the Nation Calls.” The feedback was…”It makes me wonder what the Navy is doing the rest of the time, when the nation isn’t calling.”…”sounds like you’re on the sidelines waiting to be call.” So we changed it to “at all times.” So the message testing was helpful. Warfighting First The Navy protects and defends America on the world’s oceans. Operate Forward The Navy is deployed around the world, around the clock. Be Ready The Navy is ready to defend America at all times. 2 2
3
Department of Defense Design and Construction Agent
NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)“The Facilities and Expeditionary Combat Systems Command” Verbiage from Strategic Plan NAVFAC’s unique combination of skill sets define our contribution to our Nation’s defense as the: Department of Defense Design and Construction Agent Department of the Navy’s Acquisition and Technical Authority Facilities Engineering & Construction Maintenance & Facility Services / Weight Handling Equipment Facilities Planning & Real Estate Environmental Planning, Compliance, & Remediation Natural & Cultural Resources Management Anti-Terrorism/Force Protection Ashore Contingency Engineering Response Expeditionary Infrastructure, Systems & Equipment Logistics Over the Shore Ocean Facilities
4
NAVFAC SW Area of Responsibility
For cross-BL work on the IPT, functional areas are identified (ie CI, AM, ERN, NEPA, etc), team is assigned by pulling across all BLs and is consistent throughout the planning and execution of project. Co-workers share status so personnel can be interchangeable. The team is assigned at the BLTL level; AOPs/DAOPs have overall visibility/accountability, can facilitate issues and adjust priorities. Some examples: Pier 12 Replacement at Naval Base San Diego - AM reworked to include deep draft dredging; EV Planning prepared EA, coordinated sediment sampling and negotiations with ACOE & EPA on disposal, and obtained ACOE in-water permits; CI PM and DM coordinated design efforts of in-house personnel and AEs; AQ prepared solicitation documents and conducted full and open source selection. Applying lessons learned to NBPL Fuel Pier. Fuel Pier Replacement project at Naval Base Point Loma - AM assisted with project brochure, 1391 development, and is working real estate issues with private license holder; EV Planning is preparing EAs (test pile and pier construction), is coordinating sediment sampling and negotiations with ACOE & EPA on disposal, and will obtain ACOE in-water permits; CI PM and DMs is coordinating design efforts of in-house personnel and AEs; AQ is preparing solicitation documents and will conduct full and open source selection. JSF at MCAS Yuma- Planning interpreted 1391s, NEPA (Central) interpreted EIS, coordinated with CI PM and DMs on issues, etc. Coordinated with AQ to develop different acq strategies to meet aggressive award timelines. Applying lessons learned to Navy JSF sites. Skaggs Island/Centerville Beach (non-BRAC closed bases in northern California) - Required coordination between ERN, real estate, NEPA and CI to clean-up property for successful property transfers. P822, FY14/15 MILCON for Utah Test and Training Range- will involve planning, real estate, CI and NEPA, tight timeframe. Marine Corps BEQ Program - CI, NEPA, AM, and ACQ worked closely to develop sound acquisition strategies for the $1.5B program. CI and Environmental coordinated with Camp Pendleton for site selections. Water and Wastewater Program at Camp Pendleton - AM interpreted 1391s, NEPA developed EIS and coordinated with base environmental services, coordinated technical requirements with CI PM and DMs, and applied lessons learned with each project within the program. Coastal IPT Staff FY $410 M FY $400 M Desert IPT Staff FY $238 M FY $180 M Central IPT Staff FY $450 M FY $280 M PWD Coronado PWD San Diego PWD Point Loma NMC Balboa PWD Ventura County SCI SNI
5
NAVFAC Commitment to Safety
Foster a culture of safety where every team member integrates ORM into their actions. FY10 to FY11 to FY12 reduced the DART rate from 1.89 to 1.50 to A reduction of 25% in 2 years. FY13: Contractor DART rate is 0.52 with 19 DART cases through July 2013. 12 of 18 offices finished FY12 DART free Fatality on MCAS Miramar Hangar MILCON – 01 Nov 2012 Fatality on MCB Camp Pendleton FSC tree trimming – 03 Jan 2013 Photo represents similar equipment
6
CLIENTS/SUPPORTED COMMANDS FY12 BUSINESS VOLUME = $3,145.1M
7
Challenging Regulatory Climate
The CATEX numbers listed are from FY11. FY12 for NRSW is 800, a good talking point on work increasing. Four of the five EISs are NBC Coastal Campus; China Lake Land Withdrawal Renewal; Hawaii-Sothern California Training and Test; and F-35 Joint Strike Fighter Home Basin. The fifth is at Fallon and should not be mentioned as the Navy has not released a Notice of Intent yet. If asked, the Navy is in the planning process for another EIS and should be releasing a Notice of Intent in the next couple of months. EAs, some examples that can be presented include a new fuel pier at NBPL, multiple EAs for updates to Installation Integrated Natural Resource Plans (INRMP), and Range Expansion out at Fallon. These have already gone out for public review. Agency Inspection Days by Region NEPA/Environmental Planning SW has greatest combined media total regulatory inspection days on site FY13 Navy In Progress: 5 EISs, 2 NRSW 24 EAs, 16 NRSW Regulatory program emphasis differs from Region to Region Conservation and Resource Management Cultural Resources 47 Federally Listed Species NPS Monterey - 4 NWS Seal Beach - 9 NAS El Cento – 2 NAWS China Lake - 3 NB Ventura County – 14 NAS Lemoore – 1 San Diego Metro / San Clemente Island – 35 60 State Listed Species and Species of Concern 80% of Navy’s Biological Opinions annually Critical Habitat for San Diego Fairy Shrimp at NB San Diego and Peninsular Bighorn Sheep at NAF El Centro
8
Environmental Contract Capacities
** Data contained herein is based on the best available information and is subject to change As of 30 March, ENV has awarded/executed approximately $65.7M of the planned $233M. BRAC has executed $31.5M, ERN has executed $16.5M and EQ has executed $17.7M. The FY13-15 Planned Solicitation values represent procurements that are in progress or planned (and are not included in the Current Contract Capacity). As contracts are awarded, capacity will be added to the Current Contract Capacity column (and subtracted from the FY13-15 Planned Solicitation column at the same time). The planned solicitation totals represent upcoming contract awards to contractors...aka the opportunity for new work. The values on this slide are accurate as of the end of March. The Current Contract Capacity will be updated again at the end of April (to reflect changes based on project awards), and the FY13-15 Planned Solicitation column will be updated as necessary (contracts aren't awarded monthly). The FY13-15 contract awards are a mix of MACs, RACs, A-E and single award. Environmental Contract Capacities PROGRAM FY12 Execution FY13 Planned Execution Current Contract Capacities FY13-15 Planned Solicitations Restoration/BRAC $217M $159M $1,027M $270M Compliance/ORC $93 M $73M $156M $200M NEPA/NCR $15M $22M $51M $165M TOTALS $325M $254M $1,309M $635M
9
SW EV Procurements Currently Underway
** Data contained herein is based on the best available information and is subject to change SW EV Procurements Currently Underway Contract Type Scope Location of Work Contract Capacity/ Duration Type RFP Date Projected Award Date Environmental Restoration Remedial Action Contract (RAC) – Single Award IDIQ; Cost Plus Award Fee Restoration SW AOR $100M/ 5 yrs Small Business June 2011 1st Qtr FY14 Environmental Compliance A-E Compliance Single Award IDIQ; Fixed Price Storm Water- incidental potable water, wastewater, groundwater, water quality NAVFAC Wide $30M/ 8(a) CERCLA/RCRA Compliance $20M/ March 2013 3rd Qtr FY14 NEPA A-E Single Award IDIQ; Fixed Price NEPA Infrastructure August 2012 NEPA In-Land Desert 5yrs October 2012 2nd Qtr FY14 - Awarded RAC VI, $100M 5 years Unrestricted Awarded Desert NR MASC May 2013, $10M 3 yrs Small Business Cancelled Desert CR MASC, $10M 3 yrs Small Business As of:8/1/2013
10
SW EV Planned Procurements
** Data contained herein is based on the best available information and is subject to change SW EV Planned Procurements Contract Type Scope Location of Work Contract Capacity/ Duration Type RFP Date Projected Award Date Environmental Compliance / Restoration Operational Range Sustainment EMAC Restoration SW AOR $100M/ 5 yrs Small Business 1st Qtr FY14 4th Qtr FY14 Restoration 8(a) EMAC $50M/ Restoration SB EMAC 1st Qtr FY14 NEPA/Natural/Cultural Resources Natural Resources MASC; Fixed Price Natural Resources Conservation and Regulatory Compliance Natural Resources IDIQ; Fixed Price Habitat Restoration $40M/ Exotic Pest Plant Species Eradication $20M/ 4th Qtr FY13 3rd Qtr FY14 Cultural Resources MASC; Fixed Price Cultural Resources and Regulatory Compliance A-E Single Award IDIQ; Fixed Price NEPA In-Water Coastal $30M/ TBD 2nd Qtr FY14 1st Qtr FY15 9/20/2018
11
Secure Automated Microgrid Energy Systems (SAMES)
Energy Program Smart Power Partnership Initiative (SPPI) Mission: Reduce costs, increase energy security, and integrate renewable energy through mutually beneficial power partnerships (industry, academia, other government agencies and field offices) and advanced utilities systems integration Focus Areas: Develop enterprise solutions to reduce costs and increase energy security through: 1) Expansion & Integration of Industrial Control Systems (ICS) 2) Integration of renewable energy and regulatory engagement 3) Microgrid Strategy Development for DoN Application DRECP - desert renewable energy conservation plan Rule 21 - we are participation in a group(rule 21 working group) for the rewrite of rule 21 - rules on how customers interconnect to the utility RMI - Rocky Mountain Institute - CAPT Maurer and Bernie Lindsey are members of their eLab - think tank on transforming the electricity industry UESC ~$11M RMe ~$56M Other ~$7M MILCON ~$110M ESPC ~$35M eMMRP ~$14M ECIP ~$53M ARRA ~$2M Planned FY 13-16 Energy Program ~ $286M Investment Energy Reduction Initiatives – FY-13 & Beyond Long History of execution Energy Projects Much of the “low-hanging” opportunity harvested Continued Pursuit of Financed Energy Projects 5 UESC projects planned for FY Execution 3 ESPC projects under development Region/ Installation Energy Plans Strategy to meet Regulatory, Legislative, E.O, DoD, and SECNAV energy goals Secure Automated Microgrid Energy Systems (SAMES) Create and operate a secure micro-grid cluster Composed of single circuits on 3 installations Demonstrate the feasibility to: Manage energy use Maximize value of renewable energy sources Participate in energy markets w/o affecting mission readiness Data Fidelity Investing in infrastructure, granular view of consumption Energy Culture / Community Continue to grow highly skilled Energy engineering staff Leverage expertise across all products and services Strategic Partnerships State & local gov't, industry, PUCs, Grid Operators, Utility Companies, Universities, Labs Interconnect Agreements, Rule 21, SB843 / SB43, DRECP, RMI UEOC NBC NBPL NBSD
12
Integrated Product Teams (IPTs): Coastal IPT, Desert IPT, Central IPT
NAVFAC SW Summary Integrated Product Teams (IPTs): Coastal IPT, Desert IPT, Central IPT Field Offices: 10 PWDs; 9 ROICCs OICC MCI-West Business Lines: Capital Improvements Public Works Environmental Asset Management Strategic Drivers: ENERGY – Independence and Security GROWTH – Net Gain/Pacific Mission Focus INFRASTRUCTURE – Pressing Demands FY13 Business Volume Pre-Furlough ($2.67B) Coronado Travis Pt Loma SF Bay San Diego CP Hosp Seal Beach CAMPEN Ventura 29 Palms China Lake Barstow Lemoore Bridgeport Fallon Yuma Monterey Mirmar El Centro FY13 Business Volume Furlough ($2.14B)
13
Long Range Acquisition Forecast - SB
** Currently under review at higher HQ levels as to the thresholds for set-asides ** P1132 Controversy - it is ~ $70M project and it will be set aside for small business since through the mentor-protégé (MP) program there are technically qualified firms and adequate competition. PCO sent a letter vetted through legal saying you can't protest a pre-solicitation notice (31 Jan 2013) AQ Determination: - the (MP) could meet the requirements - Offerors relied on JV LB partner's experience - Current factor reads "Offerors who fail to submit experience for all JV partners may be rated lower." Additional notes: our source selection factor conflicts with the 8(a) MPP regulations. Within that program, there is no expectation that the 8(a) protégé must have the same experience as the mentor on a procurement - the whole point of the program is to help the 8(a) firm grow through the MP relationship. Secondly, under the JV arrangement, the 8(a) firm must perform 40% of the prime's (JV's) effort. So, if the JV indicates it plans to perform 15% of the work (minimum required under limitations on subcontracting for general construction) then the 8(a) protégé must perform 40% of the 15% (Example: $75M procurement; if JV is going to perform 15% that equals $11.250M; 40% of $11,250M is $4.5M which is what the 8(a) protégé must perform). 13
14
Mechanical Engineering
SW AE IDIQ Contracts Range Type Discipline Planned Capacity Planned Award Status Pending AE IDIQ Contracts $1M max. UR Surveying and Mapping $7.5M Aug 13 Negotiating rates $5k - $1.5M Waterfront 8(a) Mechanical Engineering Final report in review $5k - $500k Civil Engineering Sep 13 Prelim Report review $500k - $3.5M $30M Jan 14 Synopsis in review $200K - $5MM SOF Complex Aug 14 $5k - $3.5M TBD Fuels $20M Mar 14 Planned AE IDIQ Contracts Multi-Disciplinary Nov 14 Planned Fire Protection Sep 14 Structural ** Data contained herein is based on the best available information and is subject to change As of: 29 Jul 2013
15
Regional Multiple Award Construction Contracts
TO Range Type Description Aggregate Capacity Planned Award Status Pending Regional MACCs $3M - $9M SA HUBZone/SDVOSB $99M Apr 14 PH 1 report in review $15M - $50M UR C&I MACC $240M Sep 14 PH 1 submittal review in progress $500k - $20M Airfield Paving PH II issued 24 Jul – due 27 Aug $7k - $15M SB MACC Jul 14 Acq Plan & SSP in review $500k - $30M TBD Heavy Horizontal PH 1 plan issue – 16 Aug $200k - $30M Fuels Analyzing market research $50k - $ 5M HVAC May 14 $500k - $3.5M 8a Gen Construction Dec 14 Planned Regional MACCs Fire Protection FY15 Planned Waterfront Dry Utilities Wet Utilities Painting ** Data contained herein is based on the best available information and is subject to change As of: 29 Jul 2013
16
Regional Opportunities – FY13 QTR4
17
Regional Opportunities – FY14 QTR1
18
Link to detailed future workload… Go to http://www.navfac.navy.mil
19
Learn more about NAVFAC …
1. Visit our webpage at: 2. Go to “Organization” Tab 3. Select desired NAVFAC component 4. Go to “Contact Us/Visitors”
20
We Never Forget Who We’re Working For
21
Questions?
22
Back-up Slides
23
Typical Acquisition Approach
NAVFAC LANT Standard Slide – SW modified Full and Open Competition Set-Aside for Small Businesses Multiple Award Construction Contracts Small Business set-aside within MACC (at Contracting Officer discretion) Fair Opportunity within MACC Indefinite Delivery Indefinite Quantity A&E Contracts Follow-on Task Orders are negotiated Indefinite Delivery Indefinite Quantity Construction Contracts Paving, Roofing, Painting, Utilities, other specialty trades Facility Support Service Contracts Vehicle Rental, Maintenance, Custodial, Grounds, etc.
24
FY-13 Military Construction
Chart is a summary of the FY13 MCON program. Detailed list in back-up Project Type Project Location # of Projects Prog Amt ($000) Pavement MCB CAMP PENDLETON CA 1 $ 4,790 MCAS YUMA AZ $ 15,093 Training & Operations 2 $ 78,400 NB CORONADO CA 5 $ 129,416 MCRD CA $ 11,095 MCAS MIRAMAR CA $ 26,339 NB POINT LOMA CA $ 84,385 NB SAN DIEGO CA $ 56,117 NB SEAL BEACH CA $ 28,885 NB VENTURA COUNTY CA $ 12,076 MCAGCC TWENTYNINE PALMS CA $ 27,400 3 $ 18,825 Totals 19 $ 492,821 ** Data contained herein is based on the best available information and is subject to change
25
FY13 Military Construction
P# INSTALLATION Project Title Prog Amt $000 313 MCRD CA Entry Control Point (Gate 5) 11,095 1132 CAMP PENDLETON CA MCB CIS OPS Facilities 74,492 1176 San Jacinto Road Extension 4,790 123 YUMA AZ MCAS Reserve Training Facility 5,068 378 Security Operations Facility 12,558 566 Combat Aircraft Loading Apron 15,093 113 MV-22 Aviation Simulator Building 3,908 181 MIRAMAR CA MCAS Hangar 5 Renovations & Addition 26,339 500 SAN DIEGO CA NB LCS Training Facility 56,117 730 CORONADO CA NB Bachelor Quarters 71,817 909 H-60S Simulator Training Facility 2,340 229 SEAL BEACH CA NB Strategic Systems Evaluation Lab Consolidation 28,885 900 VENTURA CA NB BAMS MAINTENANCE TRAINING FACILITY 12,076 ** Data contained herein is based on the best available information and is subject to change
26
FY13 Military Construction
P# INSTALLATION Project Title Prog Amt $000 Q876 CORONADO CA NB SOF INDOOR DYNAMIC SHOOTING FACILITY 31,170 Q888 SOF CLOSE QUARTERS COMBAT SHOOTING FACILITY 13,969 Q915 SOF MOBILE COMMUNICATIONS DETACHMENT FACILITY 10,120 134 YUMA AZ MCAS CONSTRUCT TANK TRUCK UNLOADING FACILITY 1,199 1306 POINT LOMA CA NB REPLACE FUEL PIER 84,385 2808 TWENTYNINE PALMS CA MCAGCC MEDICAL CLINIC REPLACEMENT 27,400 Total: 19 Projects $ 492,821 ** Data contained herein is based on the best available information and is subject to change
27
MACC Contract Acquisition Strategy
Sep14 May14 Mar15 May 14 Apr 14 Awarded as of 31 July 13 Planned T.O. Remaining Capacity (Awarded) Future Capacity (Un-Awarded) 1 7/31/2013
28
AE IDIQ Contract Acquisition Strategy
$M Aug 13 Mar 14 Jan 14 Oct 13 Awarded as of 31 July 13 Planned T.O. Remaining Capacity (Awarded) Future Capacity (Un-Awarded) 1 7/31/2013
29
EVBL FY12 Project Execution Overview
Total FY12 Project Execution $325M BRAC $154M ER $63M EQ $108M EQ Breakout CR $15.1 NR $23.3 EC $69.6M Southwest EVBL Execution accounts for 50% of LANT’s Total
30
EVBL FY13 Planned Project Execution Overview
Total FY13 Project Execution $253.5 M CR $6.5 NR $16.0 EQ Breakout EC $72.5M