Airport-ANSP Growth & Efficiency ACDM-CATFM
2
Daily Operations - AOCC
Daily Operations - AOCC
3
AGENDA Airport Capacity Airport Collaborative Decision Making CATFM
Growth Plans Challenges Airport Collaborative Decision Making KIA Perspective CATFM Airport Expectation
4
Airport Capacity Growth Plans Traffic Forecasting
Identify Capacity requirements Evaluate Options Costing and Consultations Finalize Concept Design
5
Challenges Unpredictable Nature of Business
Long gestation period for Capacity Creation Huge Capital Investments Stakeholder resource augmentation Sustaining Operations in the interim
6
A-CDM Objectives Improve Predictability Improve On Time Performance
Reduce Ground Movement Cost Optimise Use of ground handling resource Optimise Use of Airport infrastructure Reduce ATFM slot wastage Flexible pre departure planning Reduce Apron and Taxiway congestion Daily Operations - AOCC
7
Daily Operations - AOCC
KIA A-CDM CATFM Daily Operations - AOCC
8
Core Elements Consecutive implementation
6. Collaborative Management of Flight Updates INFORMATION EXCHANGE WITH CATFM ADVERSE CONDITION OPERATION 5. CDM in Adverse Conditions 4. Pre-Departure Sequencing ESTABLISH OFF BLOCK SEQUENCE Consecutive implementation CALCULATED AFTER ANALYSIS AND PUBLISHED 3. Variable Taxi Time SITUATIONAL AWARENESS 2. Milestone Approach 1. Information Sharing DATA EXCHANGE Daily Operations - AOCC
9
Daily Operations - AOCC
Information Flow Daily Operations - AOCC
10
Milestones Improve Predictability Improve On Time Performance
Reduce Ground Movement Cost Optimise / enhance use of ground handling resource Optimise/ enhance use of stands/ Gates. Optimise use of airport infrastructure and reduce congestion Reduce ATFM slot wastage Flexible pre departure planning Reduce Apron and Taxiway conggestion Daily Operations - AOCC
11
How 1 GAP ANALYSIS – Process Analysis as per Euro Control Standards
GAP ANALYSIS – System Analysis as per A-CDM Requirements 2 System Up gradation to accommodate A-CDM requirements User Requirement Document for the Upgraded System 3 NEED TO ACHIEVE- Enhanced level of predictability on ground. Linking all Ground Operations together 4 WHAT IS REQUIRED – TOBT from Airlines/GHA WHAT IS REQUIRED - Variable Taxi Time; EXIT/EXOT at KIA WHAT IS REQUIRED – TSAT and TTOT from ATC > Pre-Departure Sequencing
12
TRAININGS MEETINGS TOBT MATRIX TOBT TRIALS AMENDMENTS INTG. TRIALS
In-Depth A-CDM Awareness Sessions for External & Internal Stakeholders 150+ staffs trained 10 Meetings of A-CDM Working Groups; to define process, data integration from ATC & deliverables from every Stakeholders, defining TOBT, Variances , KPIs etc. Aligning stakeholder’s processes with Airport process, to predict an accurate Aircraft Ready Time or TOBT. TOBT prediction trials conducted from Sep’2012 onwards till date with Stakeholders in a phased manner First BIA A-CDM Integrated Trials from 18-22nd March with ATC giving TSAT and TTOT – Manual Calculation. 86% of flights followed the sequence (sample size 30) Stakeholder were shown results of their TOBT Prediction Second BIA A-CDM Integrated Trials from 1st July th July 2013. 72% of flights followed Pre-Departure Sequence (sample size 173) Amendment in the processes / tolerances as per the results & feedback agreed through WG Meetings UFIS 5.1 sessions for Internal / External Stakeholders Regular meeting with ATC We have identified, mapped and documented all required SELEX messages for arrival and departure updates into UFIS 5.1 Airlines defined their TOBT Matrix Trials to validate the agreed TOBT process with each stakeholders.
13
DEFINED VARIANCES PARAMETER1 PARAMETER2 DEFINED VARIANCE TOBT ARDT
+/- 4 MINUTES TSAT ASRT +/- 3 MINUTES AOBT TTOT ATOT +/- 5 MINUTES AIBT ACGT SAME VALUE AEGT
14
Daily Operations - AOCC
AIRLINE TOBT MATRIX Daily Operations - AOCC
15
Continuous Stakeholder Engagement
All Airlines & GHA’s Update TOBT (All flights of all Airlines) Difference between TOBT defined by GHA/Airlines and AOBT Acceptable Variance within +/- 4 minutes Regular meetings & follow up’s with Airline’s / GHA’s by showing their individual Quality Matrix and sharing TOBT month on month Trend prediction graph to improve TOBT predictability
16
TOBT Prediction Airlines below 60 % are KA, MK, SV & WY
17
Gap Analysis Nov’13 to Jan’14 Feb’14 to Aug’14 Remarks PARAMETER
No of Flights (Sample Size) 15255 36717 Target Landing Time Variance 1:22 01:36 Difference between ALDT and TLDT No of Flights without TLDT value 389 1611 4.37% of Total Flights TMO Variance 4:04 04:03 Difference between ALDT and TMO No of Flights without TMO Value 415 814 2.22% of Total Flights EXIT Variance for the flights 01:09 Difference between the AIBT and EIBT
18
KIA-ACDM Implementation
KIA ACDM Progress Dec‘ 11 Jan'12 Feb'12 Mar'12 Apr'12 May'12 Jun'12 Jul'12 Aug'12 Sep'12 Oct'12 Nov'12 Dec'12 Jan'13 Feb'13 Mar'13 Apr'13 May'13 Jun'13 Jul'13 Aug'13 Sep'13 Oct'13 Nov'13 Dec'13 Jan‘ 14 Feb'14 Mar‘14 Apr‘ 14 May'14 Jun‘ 14 Jul‘ 14 Aug'14 Sep‘ 14 INTIAL PHASE CONCEPTUALISATION PHASE TRAINING PHASE TRIALS PHASE TESTING & SYSTEM IMPLEMENTATION PHASE PROCESS FORMALIZATION PHASE - AIP Completed KIA-ACDM Implementation On Going Nearing Completion System generated TSAT or Manual (Ongoing)
19
CATFM-Airport Expectation
Capacity determination Compatibility for System Interfaces FUM-DPI Message Exchange Collaboration during all phases Post Operation Analysis – Airports Daily Operations - AOCC
20
Daily Operations - AOCC
Thank You Daily Operations - AOCC