Evacuation, Complete or Partial Facility
Table Top Exercise Evacuation, Complete or Partial Facility
2
Tabletop Exercise Introduction
Introduction of players How the exercise will be played Questions and answers
3
Narrative There is a construction project in process at your facility. Upon digging ruptured the operator ruptures the hospital water main, causing your facility’s basement to flood.
4
Scenario Event 1 The power to the building has been interrupted.
5
Scenario Event 2 Alarms are going off in the ICU.
6
Scenario Event 3 Generators are in a flood section of the basement and have been rendered unusable.
7
Scenario Event 4 Pharmacy services and the lab have been affected by the flooding.
8
Scenario Event 5 The media arrive at the facility and are demanding information
9
Scenario Event 6 Family members are calling stating their loved one isn’t answering their phone and demanding to know where they are.
10
Please return promptly
Break 10 minutes Please return promptly
11
Scenario Event 7 Several concerned family members are trying to enter through loading doc.
12
Scenario Event 8 Several supply areas were damaged by the water, rendering equipment unusable.
13
Scenario Event 9 The ruptured pipe has been repaired and should be a full capacity within an hour.
14
Hot wash Player’s feedback Evaluator feedback Group discussion
Suggestions for improvement