MPUG-GTA: 2005 EPM Jan Config 1 of 3: Planning EPM Feb
Config 2 of 3: Deploying EPM Mar Config 3 of 3: Managing EPM Apr SharePoint for EPM May Client App Boot Camp / Tips & Tricks Jun EPM Time Tracking Jul SQL Reporting Services for EPM Aug Customize Project (e.g. Project Guides) Sep Microsoft Project Future Direction Oct OLAP Cubes & Extensions Nov Resource Mgt with Project Server Dec Deployment Methodologies 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
3
MPUG-GTA: 2005 EPM 2005 Q1 Jan – Planning a Scaleable EPM Solution
Feb – Deploying an EPM Solution Mar – Managing an EPM Solution 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
4
MPUG-GTA: 2005 EPM Each Month:
Part 1: Review Microsoft Project Technical Briefing 2004 Part 2: Incorporates the appropriate Microsoft On-line Book Part 3: Discusses real client examples 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
5
And now for our feature presentation!
9/18/ :07 PM MPUG-GTA: 2005 EPM And now for our feature presentation! 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
6
Planning a Scaleable EPM Solution
Dave D’Silva VP MPUG-GTA © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
7
Planning a Scaleable EPM Solution
Part 1: DC320 Designing a scalable EPM Solution -- Theory / Gotchas min Part 2: Six Business/Technical EPM Scenarios -- Project Server 2003 Configuration Planning Guide (Microsoft On-Line Book) min Part 3: Real life scenarios min 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
8
Part 1 Overview: DC320 Designing a Scalable EPM Solution
Top 5 reasons a deployment doesn’t scale Understanding the EPM design process Building the implementation team Logical design of Project Server Key architecture factors for scalability Configuration scenarios 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
9
Top 5 Scalability Killers
9/18/ :07 PM Top 5 Scalability Killers Inadequate network infrastructure Inadequate database hardware No pilot Undefined project management practices Unrestricted access to data 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
10
EPM Initiative Development
Develop vision for EPM Stake-holder identification and buy-in Collect business requirements EPM strategy development THEN … Pick the appropriate EPM solution 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
11
EPM Design and Planning
9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
12
Implementation Team Large scale Project Server deployments
9/18/ :07 PM Implementation Team Large scale Project Server deployments Complex and require varied and enterprise level expertise System Administrator Server Install, Clustering, Network Configuration, Shared Storage, Active Directory, Domain Name Resolution, Security 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
13
Implementation Team Database Administrator Network Engineer
9/18/ :07 PM Implementation Team Database Administrator DBMS installation, Drive Configuration, Tuning, Backup and Recovery, Security Network Engineer Router and LAN configuration, load-balancing hardware, Firewall configuration, security 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
14
Capacity Planning Performance Metrics Scalability Factors
9/18/ :07 PM Capacity Planning Performance Metrics Scalability Factors Six Business Driven Configurations 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
15
Scalability Metrics Users per hour OLAP Cube build time
9/18/ :07 PM Scalability Metrics Users per hour Max number of times a specified set of user operations (workflow) can be completed per hour Focus on peak times such as weekly time reporting Dependant upon size and complexity of data Not a generalized or generic metric OLAP Cube build time On Line Analytical Processing Building multi-dimensional DB for pivot tables Views publishing throughput Converting project data to consumable data is time consuming 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
16
Key Scalability Factors
9/18/ :07 PM Key Scalability Factors Network performance Database server performance Project Server security usage Project Server data usage 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
17
Network Performance Most frequent bottleneck for most installations
9/18/ :07 PM Network Performance Most frequent bottleneck for most installations Indicated by poor performance or throughput with low cpu utilization on all tiers of the application Primarily the result of latency rather than bandwidth, and the overhead associated with each network “round-trip” 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
18
Network Performance corrective actions
9/18/ :07 PM Network Performance corrective actions Network Infrastructure 100mb minimum between servers 1Gb Ethernet or fiber between server components option. Network Interface Card Settings Avoid ‘hardware default’ On some systems consider 100mb/full setting instead of ‘auto-detect’ Test and consult your hardware vendor Hardware Options ‘NIC Teaming’ configurations Massively multi-processor box (e.g. 32 processors) 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
19
9/18/ :07 PM DB Server Performance Typical DB server performance analysis and tuning. Often will present as a bottleneck after resolving any network issues Solutions are simple but can be costly in terms of hardware. 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
20
DB Server Performance Corrective Actions
9/18/ :07 PM DB Server Performance Corrective Actions Data File Configuration Separate transaction log and data files on separate logical drives Use db optimization scripts to separate Project Server data and indexes into multiple file groups Place index and views file groups on separate logical drives than other Project Server file groups Disk I/O Hardware Use a larger number of physical disks per logical drive to ensure disk read/write activity is not bottlenecked on few physical drives Use hardware RAID controllers instead of Software RAID controllers Consult you hardware vendor 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
21
DB Server Performance Corrective Actions
9/18/ :07 PM DB Server Performance Corrective Actions Server Hardware Carefully test hyper-threading configurations and SQL Server settings related to threading and fibers Consider faster processors and increased number of processors Partition Project Server data onto multiple DB Servers 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
22
Project Server Security
9/18/ :07 PM Project Server Security What data a given user has access to impacts the amount of data retrieved and transported throughout the system Use of restrictive permissions to limit the amount of data available to Project Professional users is recommended. RBS based security is optimal 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
23
Project Server Data Usage
9/18/ :07 PM Project Server Data Usage Project Management process and standards impact the way data is grouped in the system. Find a balance between the number and size of projects. When project sizes exceed ~ 2000 tasks consider phasing these into separate projects. Use ‘View in MS Project Professional’ feature from Project Center and enterprise outline codes to work with ‘partitioned’ projects efficiently. Avoid PM Practices that require a large number of project baseline saves. Consolidate non-project or Administrative tasks into a small number of Administrative projects 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
24
Front-End Configuration
9/18/ :07 PM Front-End Configuration 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
25
Clustering Options No Cluster Single Cluster Dual Clusters WSS PS
9/18/ :07 PM Clustering Options No Cluster Project Server WSS Single Cluster Project Server WSS Project Server WSS Dual Clusters WSS PS WSS Project Server WSS Project Server 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
26
Clustering Factors WSS and Project usage balance
9/18/ :07 PM Clustering Factors WSS and Project usage balance Availability requirements Future growth 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
27
Front-End Hardware RAM and Network
9/18/ :07 PM Front-End Hardware RAM and Network 1 GB of RAM recommended 2 GB if using Portfolio Modeling features 2 to 4 processor commodity web servers SQL Standard can handle up to 4 processor Hyper-threading is ok for client app Not OK in some situations (e.g. views server) HW accelerator cards can help in SSL implementations 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
28
Middle-Tier Configuration
9/18/ :07 PM Middle-Tier Configuration 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
29
View Processing Options
9/18/ :07 PM View Processing Options All on One Project Server Views Processor Dedicated Project Server Views Processor DB-Based Project Server DB Server Views Processor 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
30
View Processing Factors
9/18/ :07 PM View Processing Factors Size of typical projects Number of Project Managers Frequency of Publish Frequency of OLAP Cube build 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
31
View Processing Hardware
CPU and Network Fast single processor speed Disable Hyper-threading High-speed link to DB server 9/18/2018 MPUG-GTA 2005
32
Session Manager Options
9/18/ :07 PM Session Manager Options All on One Project Server Session Mgr Dedicated Project Server Session Mgr Multiple Project Server Session Mgr Session Mgr 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
33
Session Manager Factors
Number of concurrent users Front-end clustering Availability 9/18/2018 MPUG-GTA 2005
34
Session Manager Hardware
9/18/ :07 PM Session Manager Hardware 1 GB RAM + recommended Minor impact on processor utilization 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
35
Database Configuration
9/18/ :07 PM Database Configuration 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
36
Database Options (Split)
9/18/ :07 PM Database Options (Split) All on One PS Database Two-Way Split PS Core Database PS Views Database Three-Way Split PS Web Database PS Projects Database PS Views Database 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
37
Database - Factors Size of typical project Number of project managers
Frequency of publish and OLAP Cube build LOB or Custom Integration 9/18/2018 MPUG-GTA 2005
38
Database Hardware Typical SQL Server behavior CPU, RAM, Disk I/O speed
9/18/ :07 PM Database Hardware Typical SQL Server behavior CPU, RAM, Disk I/O speed 1 GB RAM per CPU for rule of thumb Hyper-threading is ok (for some components) Memory configuration Maximize memory available to SQL Avoid large amount of memory configured for fail-over 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
39
Database Highlights Scaling Upwards
9/18/ :07 PM Database Highlights Scaling Upwards Windows 2000 /2003 Server (SE or EE) WSS requires Windows 2003 Server Memory (1Gb – 2Gb) Network Adapter (2 x 100Mps) Processor ( 1 – 4) (900Mhz – 1.5 Ghz) 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
40
Planning a Scaleable EPM Solution
Wrap up Part 1: DC320 Designing a scalable EPM Solution -- Theory / Gotchas min 5 minute break 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
41
Planning a Scaleable EPM Solution
Part 1: DC320 Designing a scalable EPM Solution -- Theory / Gotchas min Part 2: Six Business/Technical EPM Scenarios -- Project Server 2003 Configuration Planning Guide (Microsoft On-Line Book) min Part 3: Real life scenarios min 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
42
Planning EPM: Six Scenarios
Configuration Scenario* Supported Users Business Value 1 (pdf goto 61 for p.51) 835 Medium sized org (1K-5K) or dept needing portfolio mgt (e.g. Nortel) 2 (pdf goto 66 for p.56) 725 Medium sized professional services organization with small short term projects (e.g. small insurance firm) 3 (pdf goto 74 for p.64) 20,400 Large portfolio management organization geographically distributed across time zones (e.g. Microsoft) 4 (pdf goto 79 for p.69) 15,000 Large professional services (e.g. banks) 5 (pdf goto 83 for p.73) 10,800 Resource Management centric (e.g. public service) 6 (pdf goto 87 for p.77) 100 per site 10 sites hosted Service Provider (e.g. Microsoft EPM Partner) *Project Server 2003 Configuration Planning Guide.pdf) 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
43
Planning EPM Scenario 1 Medium-sized organization or a department within a larger professional services organization that uses Project Server 2003 for portfolio management Approximately 540 Projects/year Resource Management Approximately 835 Users/year Uses most features Including timesheets, document libraries, risk and issue tracking and Portfolio Analyzer, but not modeling 9/18/2018 MPUG-GTA 2005
44
Planning EPM Scenario 1 Types of Users
Project Managers 50 Resource Managers Time Sheet Users 335 PWA Viewers 400 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
45
Planning EPM Scenario 1 Types of Projects
Small (1 Week) 10 Tasks 10 Assignments Manage 500 / Yr Large (8 Weeks) 100 Tasks 20 Assignments Manage / Yr 9/18/2018 MPUG-GTA 2005
46
Planning EPM Scenario 1 Highlights
Relatively large number of small projects completed quickly Approximately 500 users Two Configurations: Standard: Single Server Alternative: Multi-Server 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
47
Planning EPM Scenario 1 Configuration -- Standard
Middle Tier Server 1 - Project Server - WSS - SM - VW - SQL Std Ed - SQL AS Database 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
48
Planning EPM Scenario 1 Configuration -- Alternative
Server 1 - WSS Server 2 - Project Server - SM - VW Server 3 - SQL SE - DB - SQL AS Middle Tier DB 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
49
Planning EPM Scenario 1 Performance
a) STD b) ALT Views Processing 463 / hr 600 / hr Cube Build 3 min Team Members 292 / hr 380 / hr Project Managers 20 / hr 31 / hr 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
50
Planning EPM Scenario 2 Medium-sized professional services organization or a department within a larger professional services organization Approximately 1,850 Projects/year Large Scale Resource Management Approximately 500 Users/year Uses a limited set of features Includes document libraries and risk and issue tracking 9/18/2018 MPUG-GTA 2005
51
Planning EPM Scenario 2 Types of Users
Project Managers 25 Resource Managers 125 Time Sheet Users 375 PWA Viewers 200 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
52
Planning EPM Scenario 2 Types of Projects
Small (2 Weeks) 10 Tasks 10 Assignments Manage 1,800 / Yr Large (1 Year) 3,000 Tasks 20 Assignments Manage / Yr 9/18/2018 MPUG-GTA 2005
53
Planning EPM Scenario 2 Highlights
Relatively large number of small projects completed quickly Approximately 500 users Standard Config: Two Web front-end servers (WSS vs. PS) with a common SQL Server backend 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
54
Planning EPM Scenario 2 Configuration
Server 2 Project Server WSS Server 3 SQL SE Views DB SQL AS Server 1 Web front end WSS DB Middle Tier 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
55
Planning EPM Scenerio 2 Performance
Views Processing 707/hr Cube Build 4 min Team Members 202/hr Project Managers 33.3/hr 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
56
Planning EPM Scenario 3 Medium-sized professional services organization or a department within a larger professional services organization Approximately 10,000 Projects/year Large Scale Resource Management Approximately 12,000 Users/year Uses all features Does not require modeling 9/18/2018 MPUG-GTA 2005
57
Planning EPM Scenario 3 Types of Users
Project Managers 1,200 Resource Managers Time Sheet Users 8,400 PWA Viewers 9,600 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
58
Planning EPM Scenario 3 Types of Projects
Small (2 Weeks) 20 Tasks 10 Assignments Manage 1,200 / Yr Medium (8 Weeks) 200 Tasks 15 Assignments Manage 1,440 / Yr Large (1 Year) 1,500 Tasks 20 Assignments Manage / Yr 9/18/2018 MPUG-GTA 2005
59
Planning EPM Scenario 3 Highlights
Single domain with geographically distributed users across time zones Uses load-balancing cluster Offloading View Processing Partitioning the SQL Server DB to isolate traffic 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
60
Planning EPM Scenario 3 DB Middle Tier (Web front-end)
Server 4 - SQL SE - Views DB - SQL AS Server 3 - SQL SE - Project DB - Web DB DB Server 1 & 2 - Project Server - WSS Server 5 - VM - SM Middle Tier (Web front-end) Middle Tier (OLAP) 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
61
Planning EPM Scenario 3 Performance
Views Processing 64.5/hr Cube Build 62 min Team Members 160/hr Project Managers Not avail 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
62
Planning EPM Scenario 4 Large Scale Project Management
Approximately 30,000 Projects/year Large Scale Resource Management Approximately 12,000 Users/year Uses a limited number of features 9/18/2018 MPUG-GTA 2005
63
Planning EPM Scenario 4 Types of Users
Project Managers 600 Resource Managers Time Sheet Users 9,000 PWA Viewers 4,800 9/18/2018 MPUG-GTA 2005
64
Planning EPM Scenerio 4 Types of Projects
Small (2 Weeks) 10 Tasks 10 Assignments Manage 12,000 / Yr Medium (2 Months) 20 Tasks 20 Assignments Manage 2,400 / Yr Large (1 Year) 3,000 Tasks Manage / Yr 9/18/2018 MPUG-GTA 2005
65
Planning EPM Scenario 4 Highlights
Project Server and Windows Sharepoint Services in a Load Balanced Cluster Session Manager and Views Processing Load Balance Cluster SQL Server Cluster (2 Nodes - Active 2 Nodes Passive) 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
66
Planning EPM Scenario 4 Config
Middle Tier (VW SM) Server 1 - Project Server - WSS Server 1 - Project Server - WSS Server 2 Views Session Server 3 - Views - Session Middle Tier (Web) Server 5 - SQL EE - Project DB - Web DB Server 6 - SQL EE (Passive) Server 4 - SQL EE - Views DB - SQL AS DB 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
67
Planning EPM Scenario 4 Performance
Views Processing 394/hr Cube Build 63 min Team Members 2823/hr Project Managers 42/hr 9/18/2018 MPUG-GTA 2005
68
Planning EPM Scenario 5 Large Scale Organization
Used for Time Capturing and Reporting Large Scale Resource Management 1 Task Projects are published by Resource Managers Team Members assigned at summary level tasks 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
69
Planning EPM Scenario 5 Types of Users
Project Managers Resource Managers 2,000 Time Sheet Users 8,000 PWA Viewers 800 9/18/2018 MPUG-GTA 2005
70
Planning EPM Scenerio 5 Types of Projects
Small (1 Month) 1 Task 50 Assignments Manage 1,920 / Yr Large (1 Year) 1 Task 400 Assignments Manage / Yr 9/18/2018 MPUG-GTA 2005
71
Planning EPM Scenerio 5 Highlights
Project Server and Windows Sharepoint Services in a Load Balanced Cluster Session Manager and Views Processing on 1 server SQL Server partitioned on 2 servers 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
72
Planning EPM Scenerio 5 Middle Tier (VW SM) Middle Tier (Web) DB
Server 2 - Project Server - WSS Server 1 - Project Server - WSS Server 3 - Views Processing - Session Manager Middle Tier (Web) Server 4 - SQL SE - Project DB - Web DB - SQL SE - Views DB - SQL AS DB 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
73
Planning EPM Scenerio 5 Performance
Views Processing 221/hr Cube Build 53 min Team Members 4500/hr Project (Resource) Managers 48.8/hr 9/18/2018 MPUG-GTA 2005
74
Planning EPM Scenerio 6 Hosted Deployment
Hosts sites for departments / divisions Designed to accommodate multiple sites Each site may have different needs May require all project server features 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
75
Planning EPM Scenerio 6 Types of Users
Project Managers 30 Resource Managers 10 Time Sheet Users 50 PWA Viewers 100 9/18/2018 MPUG-GTA 2005
76
Planning EPM Scenerio 6 Types of Projects
Small (2 Weeks) 10 Task 30 Assignments Manage / Yr Large (2 Months) 200 Tasks 600 Assignments Manage / Yr 9/18/2018 MPUG-GTA 2005
77
Planning EPM Scenerio 6 Highlights
Project Server and Windows Sharepoint Services on separate Load Balanced Clusters Session Manager and Views Processing on separate servers SQL Server partitioned across 3 servers SQL Analysis Services on its own server 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
78
Planning EPM Scenerio 6 Middle Tier (VW, SM) Middle Tier (Web) DB
WSS WSS WSS Middle Tier (VW, SM) Views Processing Project Server Project Server Project Server Session Manager Middle Tier (Web) SQL SE means Standard Edition. SQL AS is analysis services. VW is Views Processing, SM is session manager. The partitioning of database tables can apply to one or more of the three types namely, Data tables, Web Tables and Views Tables. Here we see the complete partition. SQL SE Web DB SQL SE Views DB SQL SE Project DB SQL AS DB 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
79
Planning EPM Scenerio 6 Performance
Views Processing 350+/hr Cube Build 30 min Team Members 6000+/hr Project Managers 80/hr 9/18/2018 MPUG-GTA 2005
80
Planning a Scaleable EPM Solution
Wrap up Part 2: Six Business/Technical EPM Scenarios -- Project Server 2003 Configuration Planning Guide (Microsoft On-Line Book) min 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
81
Planning a Scaleable EPM Solution
Part 1: DC320 Designing a scalable EPM Solution -- Theory / Gotchas min Part 2: Six Business/Technical EPM Scenarios -- Project Server 2003 Configuration Planning Guide (Microsoft On-Line Book) min Part 3: Real life scenarios min 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
82
Planning a Scaleable EPM Solution
Part 3: Real life scenarios min Discussion 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
83
Planning a Scaleable EPM Solution
Wrap-Up Part 1: DC320 Designing a scalable EPM Solution -- Theory / Gotchas min Part 2: Six Business/Technical EPM Scenarios -- Project Server 2003 Configuration Planning Guide (Microsoft On-Line Book) min Part 3: Real life scenarios min Where to go for more info 9/18/2018 MPUG-GTA 2005 © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
84
Planning a Scaleable EPM Solution
Thank you Questions Dave D’Silva Brendan Giles Next Steps Join MPUG February & March MPUG Presentations © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary. © 2004 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.