Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR

Similar presentations


Presentation on theme: "Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR"— Presentation transcript:

1 Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR

2 Comprehensive Explanation
Implement Advanced Airspace Management Area of applicability: All ECAC States Initial Operational Capability (IOC): 01/01/2011 Full Operational Capability (FOC): 31/12/2016 Establish a collaborative civil-military airspace planning at the European Network level by: Integrating ASM and ATFCM processes into the day of operations, Maximising use of capacity available and improved updates of the airspace status, Consistent application of FUA Concept across Europe, Developing and implementing of ASM/ATFCM processes and supporting tools at national, sub-regional and European levels. This objective is functionally related to ATM Functionality 3 of PCP Reg. 716/2014 Note: This objective contributes also to the implementation of the FUA Regulatory Requirements (Regulation 2150/2005). ESSIP Plan 2015 / Objective AOM 19

3 What is new or has changed since LSSIP 2014
No substantial changes since ESSIP Plan 2014 ESSIP Plan 2015 / Objective AOM 19

4 ESSIP Plan 2015 / Objective AOM 19
Links Objective AOM19 is linked to: European ATM Master Plan through the following OI steps: OI step - [AOM-0201] - Moving Airspace Management Into Day of Operation OI step - [AOM-0202] - Enhanced Real-time Civil-Military Coordination of Airspace Utilisation OI step - [AOM-0205] - Modular Temporary Airspace Structures and Reserved Areas OI step - [AOM-0401] - Multiple Route Options & Airspace Organisation Scenarios OI step - [DCB-0203] - Enhanced ASM/ATFCM Coordinated Process ICAO ASBU Block O through BO-FRTO Deployment Programme V1 through Families: 3.1.1, 3.1.2, 3.1.3, 3.1.4 ESSIP Plan 2015 / Objective AOM 19

5 Important information
Each SLoA should be fulfilled in accordance with the relevant provisions of the CFMU Handbook, the ERNIP Part 3 - Handbook for Airspace Management, the EUROCONTROL Specification for the application of the FUA ESSIP Plan 2015 / Objective AOM 19

6 Finalisation Criteria and Closed Questions
Contact your subject matter expert to determine the deployment Status for each SloA Statements to be made based on Finalisation criteria Closed questions: Not yet developed ESSIP Plan 2015 / Objective AOM 19

7 ESSIP Plan 2015 / Objective AOM 19
ESSIP Report 2014 ESSIP Plan 2015 / Objective AOM 19

8 ESSIP Plan 2015 / Objective AOM 19
Links and contacts Objective Coordinator: Agnieszka DYBOWSKA NMD Objective Expert(s): Giuseppe ACAMPORA Olivier MROWICKI ESSIP Plan 2015 / Objective AOM 19