Presentation is loading. Please wait.

Presentation is loading. Please wait.

T.K. Hemmick for the Stony Brook Crew

Similar presentations


Presentation on theme: "T.K. Hemmick for the Stony Brook Crew"— Presentation transcript:

1 T.K. Hemmick for the Stony Brook Crew
Stony Brook Update T.K. Hemmick for the Stony Brook Crew

2 Now we dry… All the GEMs are in. All the tests are done (twice):
Capacitance while connected. Voltages on cables. Glove Box being used as dryer: 50 cfm….~1400 liters/minute. 4.5 ppm and falling…

3 Odds and Ends: Schedule: Flashing the detector.
Dry the detector all this week. Remove from glove box Monday Oct 9. Ship to BNL Monday October 16. Flashing the detector. I personally don’t like the LED option: QE at 250 nm is probably dominated by thermal noise. The real test is QE at low wavelengths! The only reason that we can’t flash normal lamps is that Hamamatsu uses transformers. I am 100% certain we can flash a normal lamp. Transformer in base is removable and non-magnetic circuit is easy to design and build. So…put 4 lamps on the detector…put electronics far far away.


Download ppt "T.K. Hemmick for the Stony Brook Crew"

Similar presentations