Download presentation
Presentation is loading. Please wait.
Published byJuliana Saber Modified over 10 years ago
2
A quick tour overview City of Arlington Pad Sites Tuesdays Tour Schedule KISD - Drilling Eden SW - Fracturing (Fracking) Duke - Production Compressor Station – Pipeline Personal Protective Equipment (PPE)
3
Operators in 64 Pad Sites 367 Well heads Applications pending Chesapeake Energy XTO Energy Carrizo Oil and Gas Vantage Energy Legend Resources Titan Operating Quicksilver Resources Pad Sites in
4
Tuesdays Tour Chesapeake – KISD Drilling Start: City Hall travel to KISD site Here we will be able to observe a drill rig in the process of Horizontal Drilling
5
Tuesdays Tour Travel to Eden SW site
6
Tuesdays Tour XTO – Eden SW Fracturing (Fracking) A highly visible pad site, Eden SW is located to the east of two major thoroughfares; Cooper and Matlock. It also resides in close proximity to several residential areas.
7
Tuesdays Tour XTO – Eden SW Fracturing (Fracking) Travel to the Duke site
8
Tuesdays Tour Duke Pad Site – Chesapeake Production The Duke Site will allow us to observe a pad site in production; after the Drilling and Fracking have been completed this is all that remains.
9
Tuesdays Tour Duke Pad Site – Chesapeake Production Compressor Station - DFW Midstream Pipeline The Duke site is located next door to our final destination; DFW Midstreams compressor facility
10
Personal Protective Equipment Hard hats, eye and hearing protection will be provided to Task Force, City Council and Staff Temperatures will be hot Please wear comfortable clothing Water will be provided Closed toe shoes are required
11
We look forward to seeing you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.