Presentation is loading. Please wait.

Presentation is loading. Please wait.

Capacity Building project for the Russian Timber Sector

Similar presentations


Presentation on theme: "Capacity Building project for the Russian Timber Sector"— Presentation transcript:

1 Capacity Building project for the Russian Timber Sector
UNECE Project Capacity Building project for the Russian Timber Sector Poiana Brasov 26 March 2003 Hans Jansen Project Manager UNECE Trade Development and Timber Division 9/19/2018

2 Key elements of the project
Sustainable Development Cross Sectoral work Priority concerns of member States Cooperation with the private sector Regional Level

3 Core activities Sustainable development of the forest sector
Customs cooperation Timber port logistics Trade facilitation procedures Biomass trade logistics

4 Project Focus on North Western Russia
Arkhangelsk Oblast Leningrad Oblast

5 Activities in 2003 Conference on Sustainable Development and Certification in the Forest Industry of North West Russia July, St. Petersburg Forum on Improved Trade Logistics for the Sustainable Use of Biomass September, Rotterdam Conference on Sustainable Development Strategies at the Enterprise Level December, St. Petersburg

6 The Russian Federation

7 Main activity within the Project
Improved Trade Logistics for the Sustainable Use of Biomass

8 Biomass as Alternative Energy
“Organic matter available on a renewable basis including forest residues, wood and wood waste.”

9 Vast forests resources

10 Timber Resources of Russia

11 Biomass

12 Sea transport systems Types of ship Self-loading carrier

13 Sea transport systems Types of ship Geared conbulker

14 Ust Luga

15 EMO terminal Rotterdam

16 Dry Bulk/Coal stevedore Blending pellets with coal
UN ECE St. Petersburg/ Leningrad Oblast Bulkcarrier containers Energy pellet factory Woodchips Delivery of BioMass from forests Saw mills Delivery of roundwood from forests Transport mode Rail Road Inland shipping Power Plants Power Plants Bulkcarrier + containers on deck Rotterdam Dry Bulk/Coal stevedore + Blending pellets with coal Power Plants Power Plants Delivery of BioMass by Inland shipping

17 One of the final destinations
Amer powerplant water depth 4 m. expected volume biomass approx 1 million tons

18 For further information
Hans Jansen Project Manager UNECE Trade Development and Timber Division Tel:


Download ppt "Capacity Building project for the Russian Timber Sector"

Similar presentations


Ads by Google